United Power Generation & Distribution valuation report: fair value BDT 79.7–118 (Nov 2026)
Capacity contracts run off by 2034: fair value range BDT 79.7-117.8, base 94.3
A contract-by-contract DCF with no value after 2039 gives BDT 79.7-117.8 (base 94.3); BPDB arrears of BDT 20.7bn, a net BDT 7.6bn owed by the sponsor and the end of one-off tariff bills set the range.
For information only, not investment advice. AnalystBro accepts no responsibility for decisions made on it. Full disclaimer.
2026-10-29
Uncertainty: High
Contract-by-contract DCF to PPA ends (CoE 15.6%) 80% · DDM 20%
- HFO plants (Anwara, Jamalpur)৳51
- UAEL, small gas and EPZ plants৳27
- Working capital, net debt, loans, claims৳3
- DDM leg (20%)৳14
- About 37% of FY27F revenue is BPDB capacity payments, and 89% of the BPDB megawatts lose their contracts by 2034. → Contracts →
- BPDB owed BDT 20.7bn in March 2026, nine to ten months of bills, funded with short-term loans at 11.5-13.5%. → Receivables →
- United Enterprises, the sponsor, owes a net BDT 7.6bn on demand, and BDT 8.69bn of gas-bill claims are unprovided. → Receivables →
- EPS of BDT 15.94 in FY26 (DSE) and 14.32 in FY27F, with FY31F at 14.47 after UAEL's PPA ends. → Forecast →
- Fair value range BDT 79.7-117.8, base 94.3, from a contract-by-contract DCF with no value after 2039. → Valuation →
| FY2025A | FY2026E | FY2027F | FY2028F | FY2029F | FY2030F | |
|---|---|---|---|---|---|---|
| Revenue | 39,085 | 31,721 | 30,239 | 28,793 | 27,957 | 27,266 |
| Capacity payments | 11,639 | 11,734 | 11,147 | 10,537 | 10,537 | 10,009 |
| EBITDA | 16,573 | 14,247 | 12,865 | 12,135 | 12,084 | 11,633 |
| Profit attributable to owners | 11,976 | 9,240 | 8,300 | 8,565 | 9,152 | 9,670 |
| EPS (BDT) | 20.66 | 15.94 | 14.32 | 14.78 | 15.79 | 16.68 |
| DPS declared for the year (BDT) | 6.50 | 6.00 | 5.73 | 5.91 | 9.47 | 10.01 |
| ROE | 31.0% | 20.3% | 16.4% | 15.4% | 14.9% | 14.6% |
| P/E at BDT 112.2 | 5.4x | 7.0x | 7.8x | 7.6x | 7.1x | 6.7x |
| P/B at BDT 112.2 | 1.5x | 1.3x | 1.2x | 1.1x | 1.0x | 1.0x |
| Dividend yield at BDT 112.2 | 5.8% | 5.3% | 5.1% | 5.3% | 8.4% | 8.9% |
| BPDB receivable days | — | 300 | 300 | 240 | 180 | 180 |
Thesis: power contracts that run out by 2039 put United Power's fair value range at BDT 79.7-117.8, base 94.3
Updated 4-Nov-2026: added the business model and industry forces, five years of electricity sold by plant with revenue, capacity payment and fuel per kWh, HFO tonnes and gas use per kWh against the official gas tariffs, revenue by customer, BDT/USD, Brent, policy and lending rates, bulk tariff and DSEX, the 9M FY2026 related-party loan flows and finance cost, the power-bond settlements, the 53 MW extension, the DEPZ gas cut-off and court stage of the gas claim, the three key audit matters, board changes and five years of DSE events; own sensitivities removed.
United Power Generation & Distribution Company Ltd. (DSE: UPGDCL) is a Bangladeshi gas and HFO independent power producer (IPP) with 845 MW in operation across eight plants, including 195 MW at its 92.4%-owned subsidiary United Ashuganj Energy [2 p.10]. It makes money in two ways. Its Dhaka and Chattogram EPZ plants (154 MW) sell electricity and steam directly to factories in the export processing zones under agreements with BEPZA, and sell surplus power to BPDB and BREB. Its other plants sell only to the Bangladesh Power Development Board (BPDB) under power purchase agreements (PPAs). Those pay a capacity charge for being available plus an energy charge that passes fuel through [1 p.56]. The sponsor, United Group (through United Enterprises & Co.), runs the plants through its O&M company UEPSL [1 p.38].
Business model. UPGDCL sells electricity, and a little steam, from gas and HFO engines. In FY2025 electricity revenue was BDT 38.74bn and steam BDT 0.35bn [6 p.47]; by customer, BPDB paid BDT 31.36bn, BEPZA BDT 5.32bn, BREB BDT 0.82bn and private customers BDT 1.24bn [1 p.37]. BPDB pays a capacity charge plus an energy charge in which gas or HFO cost is "a pass-through expense"; capacity and variable O&M charges are indexed to "foreign inflation and local inflation indexation factors" and the exchange rate [1 p.56]. Its inputs are pipeline gas from Titas and Karnaphuli Gas under gas supply agreements [3] and imported HFO, financed partly through UPAS letters of credit (interest of BDT 151.6mn in FY2025) [6 p.176]. Capacity is 895 MW installed, "around 4% of the total installed capacity of the country" [6 p.12]. It is funded by equity, short-term bank loans of BDT 8.1bn at March 2026 [2 p.2] and group loans, and controlled by United Mymensingh Power Ltd with 89.998% [2 p.21]; the group has no employees, and 409 people from United Engineering and Power Services run UPGDCL's plants under O&M contracts [6 p.188]. Industry forces, from the filings: rivalry, none disclosed for BPDB-dispatched plants (the annual report gives only the company's share of national capacity) [6 p.12]; supplier power, the gas companies set the dispute over the captive rate and disconnected the 82 MW DEPZ plant on 28-Apr-2025 [3]; buyer power, BPDB took 81% of FY2025 electricity revenue (derived) [1 p.37] and decides contract extensions [14]; entry barriers, a BERC licence and a government PPA or BEPZA agreement [3]; substitutes, BEPZA factories can be supplied by other sources, which the filings do not quantify (none disclosed).
The latest period here is FY2026 (year to 30-Jun-2026), but the audited FY2026 statements are not yet filed. On 28-Oct-2026 the board announced consolidated EPS of BDT 15.94 (FY2025: 20.66), NAV per share of BDT 83.33, operating cash flow of BDT 12.00 per share and a 60% cash dividend (BDT 6.00), with a record date of 19-Nov-2026 [3]. These are labelled 'DSE announcement, audited statements not yet filed'. Line items come from the FY2025 annual, the full FY2025 annual report and the nine-month (9M) FY2026 interim to 31-Mar-2026. Corpus check 4-Nov-2026: the FY2026 annual report is not yet in our corpus.
Our view: UPGDCL is the run-off of contracted cash flows, not a growing utility. Capacity payments were BDT 11.6bn of FY2025's BDT 39.1bn revenue [1 p.37] and most of its profit. The two small BPDB gas plants end in 2027, UAEL in 2030 and the Anwara and Jamalpur HFO plants in 2034; only the EPZ plants run to 2038-39 [2 p.10]. We value each contract group to its end, with no perpetuity, at a 15.6% cost of equity. That gives a fair value range of BDT 79.7-117.8, base BDT 94.3 (probability-weighted 94.6). The price of BDT 112.2 (29-Oct-2026) [4] is inside the range, between our base and bull cases.
Strengths in the filings
- BPDB settled BDT 16.6bn (FY2024) and BDT 4.3bn (FY2025) of receivables in power bonds, used directly to repay short-term loans [1 p.14] [1 p.41].
- The company describes the BPDB balance as undisputed invoices of nine to ten months [2 p.17].
- ECRL affirmed AAA / ST-1 with a stable outlook on 14-Dec-2025 [3] [20].
Weaknesses in the filings
- Q4 EPS was BDT 0.79, 1.34 and 1.25 in FY2024-26 against 3.12-7.21 in other quarters [6 p.124] [3].
- A net BDT 7.6bn is owed by the sponsor, United Enterprises [2 p.18] [2 p.28], and gas suppliers claim BDT 10.03bn at the captive rate, of which BDT 8.69bn is unprovided [1 p.49] [1 p.3].
- Short-term loan interest rose to BDT 813.9mn in 9M FY2026 from BDT 365.1mn a year earlier [2 p.32].

The valuation range runs from BDT 79.7 to 117.8 with a base of BDT 94.3; the price of BDT 112.2 sits inside it.

Rebased to 100, UPGDCL ended at 85 while the DSEX ended at 103.
Five-year record: ROE of 20-31% and payout cut from 99% to 31% as BPDB arrears grew
The five-year record shows a profitable business with deteriorating cash conversion. Revenue swung between BDT 30.6bn and 49.4bn as HFO dispatch rose and fell with BPDB's fuel budget. Gross margin ranged from 25% (FY2022-23, when HFO pass-through revenue was high) to 39% (FY2021) [6 p.127] [6 p.129]. Profit attributable to owners was BDT 8.0-12.0bn every year, and return on average equity ranged from 20% to 31%, with a median of about 25% [7 p.118] [1 p.12].
| BDT mn unless stated | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 (DSE) |
|---|---|---|---|---|---|---|
| Revenue | 30,581 | 49,435 | 41,309 | 34,781 | 39,085 | — |
| Gross margin | 38.6% | 25.0% | 25.8% | 29.5% | 34.0% | — |
| Profit attributable to owners | 10,887 | 9,974 | 8,019 | 8,123 | 11,976 | 9,240 |
| EPS (BDT) | 18.78 | 17.21 | 13.83 | 14.01 | 20.66 | 15.94 |
| NAV per share (BDT) | 55.98 | 56.38 | 53.22 | 59.23 | 73.89 | 83.33 |
| Operating cash flow per share (BDT) | — | 1.89 | 19.40 | -0.88 | 18.61 | 12.00 |
| Cash dividend per share (BDT) | 17.00 | 17.00 | 8.00 | 6.00 | 6.50 | 6.00 |
| Payout | 90% | 99% | 58% | 43% | 32% | 38% |
| ROE (owners, average equity) | — | 30.6% | 25.2% | 24.9% | 31.0% | 20.3% |
| Electricity sold (GWh) | 3,012 | 3,711 | 2,679 | 1,990 | 2,462 | — |
The dividend tells the story of BPDB's arrears. The company paid BDT 17.0 a share (170%) for FY2021 and FY2022, about 90-99% of earnings. It cut to BDT 8.0 for FY2023, BDT 6.0 for FY2024, BDT 6.5 for FY2025 and BDT 6.0 for FY2026, a payout of 31-43% [6 p.129] [6 p.188] [3]. Cash went into funding BPDB receivables and HFO stocks instead. Our forecast payout is 40% while arrears stay high, then the five-year median of about 60% from FY2029, and 100% from FY2035, when only the EPZ plants remain and nothing is left to reinvest in.
The balance sheet changed shape over the same five years. Property, plant and equipment fell to 74% of its FY2021 level as plants were depreciated towards their PPA ends. Trade receivables rose to 2.9 times their FY2021 level, and short-term loans to 3.75 times [6 p.126]. In other words, profits were reinvested in BPDB's arrears, not in new plants. The 2023 amalgamation of United Energy, United Anwara Power and United Jamalpur Power into the listed company simplified the structure and removed the minority leakage on those plants; only UAEL now has outside shareholders, at 7.6% [2 p.10]. Figures before FY2024 are as originally reported, before that merger.
The 2023 merger followed a court process: the board approved the scheme (DSE 25-Aug-2022), an EGM was held on 9-Nov-2022 under a High Court order of 8-Sep-2022 (Matter No. 275 of 2022) [14], the High Court order giving effect to it is dated 5-Jun-2023 [2 p.10], and the appointed date is 01-Jul-2023 [1 p.4]. The three transferors were subsidiaries held 99% before the merger [6 p.19]; the swap terms for the 1% minorities are not printed in the notes read. Before the merger, United Anwara Power declared an interim dividend of BDT 5,550m and United Energy BDT 3,225m (DSE 2-May-2023) [14].
| Event type | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|
| Results | 0 | 1 | 1 | 1 | 0 | 0 | 3 |
| Board / management change | 0 | 0 | 0 | 1 | 1 | 1 | 3 |
| Contracts / PPA | 1 | 1 | 0 | 0 | 0 | 0 | 2 |
| Amalgamation | 0 | 1 | 1 | 0 | 0 | 0 | 2 |
| Rating | 0 | 0 | 0 | 1 | 1 | 0 | 2 |
| Operations | 0 | 0 | 0 | 0 | 2 | 0 | 2 |
| Results and dividend | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Total | 1 | 3 | 2 | 3 | 4 | 2 | 15 |
Material events in Exhibit 4:
- 03-Apr-2022: UEL signed the 53 MW PPA renewal for 5 years from the date of operation.
- 20-Aug-2023: Court judgement sanctioned the amalgamation.
- 04-May-2025: Gas to the 82 MW DEPZ plant disconnected on 28-Apr-2025 over the captive-rate claim.
- 28-Oct-2026: FY2026 60% cash dividend; EPS 15.94.
Our forecast ROE of 16% in FY2027F and 12% in FY2031F is below the 20-31% history. There are three reasons. The supplemental tariff bills that lifted FY2025 do not recur. Equity has grown to BDT 48bn while the contract base is shrinking. And retained cash earns a deposit rate, not a plant return. A peak year like FY2025 (31%) is not 'normal' for valuation purposes; neither is FY2023's 25% with full HFO dispatch.
Plant registry: 81 MW of BPDB contracts end in 2027, 195 MW in 2030 and 415 MW in 2034
The plant table in the March 2026 interim is the core of the valuation [2 p.10]. Every BPDB contract has a fixed end year, and the company depreciates each plant to its PPA end, having dropped the earlier assumption that contracts would be extended [1 p.21]. The 53 MW Ashuganj plant's rental contract expired on 22-Jun-2019 after an extension application of 4-Aug-2018 [1 p.16]; the Cabinet Committee on Government Purchase approved a further five years on 30-Dec-2021 [14] and the extension contract (No. 10640) was executed on 31-Mar-2022 [1 p.16], with UEL telling DSE it runs "for further 5 (five) years from the date of operation" [14]. The plant reported no sales in any of FY2021-FY2025 [6 p.124]; the filings do not say whether it earns a capacity payment, and no impairment of it is printed (searched: FS25 notes 1, 31 and PPE). The 50 MW Leviathan Global plant at Karnaphuli EPZ is built but idle because of a gas-tariff dispute with Karnaphuli Gas [2 p.10].
Two filings print different contract ends for the small gas plants. The March 2026 interim gives 2027 for both Ashuganj 53 MW and Sylhet 28 MW [2 p.10]; the FY2025 annual report's plant table gives "22 June 2019 (Extension under negotiation)" for Ashuganj and "Year 2043" for Sylhet [6 p.12]. We keep the interim's later table. The Sylhet tax exemption runs to 2028 [1 p.57]. Leviathan Global BD is "built under joint venture between Leviathan Global Corporation, USA and UECL"; UPGDCL bought its 75% from UECL with effect from 1-Jul-2019, and the other 25% holder is not named in the notes read [2 p.10]. Management says it is "regularly reviewing carrying value of CWIP" and is "satisfied" with it [2 p.15].
| Plant | MW | Fuel | Buyer | COD | Contract ends | Tax holiday ends | UPGDCL share |
|---|---|---|---|---|---|---|---|
| Dhaka EPZ (two units) | 35 + 47 | Gas | BEPZA zone users, BPDB/BREB surplus | 26-Dec-2008 / 17-Feb-2023 | 2038 | 2023 / 2028 | 100% |
| Chattogram EPZ (two units) | 44 + 28 | Gas | BEPZA zone users, BPDB/BREB surplus | 12-Aug-2009 / 13-Feb-2023 | 2039 | 2024 / 2028 | 100% |
| Ashuganj | 53 | Gas | BPDB | 22-Jun-2011 | 2027 | 2027 | 100% |
| Sylhet | 28 | Gas | BPDB / BREB | 21-Oct-2013 | 2027 | 2028 | 100% |
| Anwara | 300 | HFO | BPDB | 22-Jun-2019 | 2034 | 2034 | 100% |
| Jamalpur | 115 | HFO | BPDB | 21-Feb-2019 | 2034 | 2034 | 100% |
| United Ashuganj Energy (UAEL) | 195 | Gas | BPDB | 8-May-2015 | 2030 | 2030 | 92.4% |
| Leviathan Global (KEPZ) | 40/50 | Gas | BEPZA (30-yr agreement) | Not started | 2048 | n/a | 75% |
The first question for any IPP is which contracts end within twelve quarters. For UPGDCL that is Ashuganj 53 MW and Sylhet 28 MW in 2027. They are small: we give them 8% of the parent's capacity payments, an assumption: the filings do not split capacity payments by plant. With Ashuganj idle, that may be generous. Our base case runs each BPDB plant for one 'no electricity, no payment' (NENP) year at half its contract-period dispatch after its PPA ends, then nothing. The bear assumes shutdown and the bull a five-year renewal at half the old capacity rate. We give the EPZ plants nothing after 2039 even though their factory customers will still need power. That is a conservative choice.
Utilisation: 40% in FY2025, with Anwara's 300 MW HFO plant at only 9%
Dispatch is set by BPDB's merit order and fuel budget. Group utilisation rose to 40% in FY2025 from 32% in FY2024, on 2,522 GWh of generation [6 p.39] [6 p.47]. The spread across plants is wide. The Chattogram EPZ plant ran at 86% and Dhaka EPZ at 55%. The Anwara 300 MW HFO plant ran at 9.2% (22% a year earlier); the filings give no reason by plant. UAEL's 195 MW gas plant ran at 56% against 15% a year earlier [6 p.188].
| Plant | Capacity (GWh/yr) | FY2024 sold/produced | FY2024 utilisation | FY2025 produced | FY2025 utilisation |
|---|---|---|---|---|---|
| Dhaka EPZ 82 MW | 656 | 353.3 | 54% | 361.3 | 55% |
| Chattogram EPZ 72 MW | 576 | 436.5 | 76% | 494.5 | 86% |
| Anwara 300 MW (HFO) | 2400 | 516.9 | 22% | 220.8 | 9% |
| Jamalpur 115 MW (HFO) | 920 | 349.5 | 38% | 466.0 | 51% |
| Sylhet 28 MW | 224 | 142.8 | 64% | 112.8 | 50% |
| UAEL 195 MW | 1560 | 240.3 | 15% | 866.4 | 56% |
| Group | 6336 | 2039.3 | 32% | 2521.8 | 40% |
Over five years HFO generation fell from 2.3 TWh (FY2022) to 0.67 TWh (FY2025), while EPZ sales held at 0.7-1.0 TWh [6 p.124]. The company's directors attributed FY2025 EPS growth to "higher production, higher bulk tariff, stable foreign exchange rates, and lower finance costs" [3]; the Financial Express reported profit rising as revenue fell [8]. For gas plants the binding constraint is Petrobangla's gas allocation. Domestic output is falling, and in winter gas is diverted to fertiliser factories and households.
Unit economics. Electricity sold was 3.01 TWh in FY2021, 3.71 TWh in FY2022, 2.68 TWh in FY2023, 1.99 TWh in FY2024 and 2.46 TWh in FY2025 [6 p.124]. Electricity revenue per kWh sold was BDT 10.14, 13.31, 15.38, 17.36 and 15.73 in those years, of which the capacity payment was BDT 2.78, 2.29, 3.78, 5.39 and 4.73 (derived) [13 p.164] [7 p.163] [12 p.177] [1 p.37]. The HFO plants burned 0.200-0.206 tonnes of HFO per MWh sold in FY2021-FY2024 and 0.228 in FY2025 (derived) [6 p.125]. Gas use was 0.25-0.26 m3 per kWh at UAEL and 0.27-0.28 at DEPZ [6 p.125]; at the power-category tariff of BDT 15.50 per m3 in force since May-2024 (SRO 105-Ain/2024) that is about BDT 3.9 of gas per kWh at UAEL, against BDT 1.1 at the July-2019 rate of 4.45 (derived) [15]. The EPZ plants pay the captive rate for gas used to supply other customers [1 p.49]; at BDT 31.50 per m3 that is about BDT 8.5 per kWh at DEPZ (derived) [15]. Plant-wise tariffs are not printed (searched: revenue notes and directors' reports FY2022-FY2025).
| FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | |
|---|---|---|---|---|---|
| Electricity sold (GWh) | 3,012 | 3,711 | 2,679 | 1,990 | 2,462 |
| Electricity revenue (BDT mn) | 30,540 | 49,387 | 41,192 | 34,541 | 38,739 |
| Revenue per kWh (BDT, derived) | 10.14 | 13.31 | 15.38 | 17.36 | 15.73 |
| Capacity payment per kWh (BDT, derived) | 2.78 | 2.29 | 3.78 | 5.39 | 4.73 |
| HFO consumed, Anwara + Jamalpur (000 t) | 346.5 | 467.9 | 313.1 | 169.8 | 152.5 |
| HFO per MWh sold, HFO plants (t, derived) | 0.200 | 0.203 | 0.206 | 0.201 | 0.228 |
| Gas use, UAEL (m3/kWh) | 0.257 | 0.250 | 0.248 | 0.251 | 0.25 |
| Power-category gas tariff at end-June (BDT/m3) | 4.45 | n.a. | 14.00 | 15.50 | 15.50 |

HFO electricity sold fell from 2,306 GWh in FY22 to 669 GWh in FY25, while BPDB gas sales rose to 958 GWh.
Our base dispatch factor is 100% of the 9M FY2026 run-rate, after a separate Q4 seasonal line. The bear (85%) and bull (115%) move it by 15% for two years and then fade back. That is a smaller move than the 14-24% yearly revenue swings of FY2022-25.
Contracts: capacity payments are 37% of FY27F revenue and fall to zero by FY2035
In FY2025, electricity revenue of BDT 38.7bn was made up of capacity payments of BDT 11.6bn, fuel payments of BDT 15.3bn, energy payments of BDT 10.1bn, supplemental bills of BDT 0.86bn and true-up bills of BDT 0.60bn [1 p.37]. Fuel is a pass-through: the PPA reimburses gas or HFO at the regulated price, and true-up bills cover the gap between the billing and payment-date exchange rates [1 p.56]. The two filings describe supplemental bills differently. The accounting policy ties supplemental and true-up invoices to "inflation (foreign inflation and local inflation indexation factors) and changes in exchange rate" [1 p.56]; the company's DSE post of 23-Nov-2025 called the prior year's supplemental revenue one "arising from the bulk electricity tariff adjustment relating to prior gas price increases" [3]. The order behind them and the amounts claimed but not billed are not disclosed (searched: FS25 notes 31 and 57F, Q3 FY2026 note 33). In 9M FY2026 they were still BDT 869.5mn [2 p.29], all booked in the first half. The company said Q3 FY2026 EPS fell because of 'the absence of supplemental revenue' [3]. We include them in FY2026E and forecast none from FY2027; they are kept out of the run-rate.
FY2025 gross profit rose 29.4% to BDT 13.27bn [6 p.44]. By revenue line, energy payments rose from BDT 7.74bn to BDT 10.09bn, capacity payments from BDT 10.72bn to BDT 11.64bn, fuel payments from BDT 14.69bn to BDT 15.27bn and true-up bills from BDT 0.24bn to BDT 0.60bn, while supplemental bills fell from BDT 1.06bn to BDT 0.86bn [1 p.37]. The directors credit "a modest rise in cost of sales and improved operational efficiencies" [6 p.44], and the DSE post names "higher production, higher bulk tariff, stable foreign exchange rates, and lower finance costs" [3]. Electricity sold rose 24% to 2.46 TWh, with UAEL up from 0.23 TWh to 0.85 TWh [6 p.124]. The FY2024 margin of 29.5% was after a gross-margin fall that the FY2024 directors' report put at 4% [12 p.47].
| FY2025 electricity revenue, BDT mn | Amount | Share |
|---|---|---|
| Capacity payment | 11,639 | 0 |
| Fuel payment (pass-through) | 15,275 | 0 |
| Energy payment | 10,089 | 0 |
| Supplemental and true-up bills | 1,467 | 0 |
| O&M payment | 269 | 0 |
| Total | 38,739 | 1 |
In 9M FY2026 capacity payments were BDT 8.80bn of BDT 24.01bn revenue [2 p.29]. Annualised, that is BDT 11.7bn, of which BDT 3.7bn is UAEL's. We apply a 5% contract-review haircut in the base case (10% in the bear, none in the bull). The Daily Star has called for capacity terms to be renegotiated [10], and the Financial Express reports earnings pressure on listed IPPs as policy shifts [9].

Capacity payments were BDT 11,639mn in FY25 and fall to BDT 0 in FY35F; total revenue falls from BDT 39,085mn to BDT 12,052mn.
Industry: BPDB pays IPPs late, partly in bonds, and the state wants out of capacity payments
BPDB is the single buyer of grid power in Bangladesh. Much of the private capacity added after 2010 was contracted with capacity payments, which left BPDB paying for idle plants while its tariff did not cover costs. The result is chronic arrears to IPPs. UPGDCL collected BDT 23.5bn in cash against BDT 34.8bn of revenue in FY2024, and BDT 31.6bn against BDT 39.1bn in FY2025. BPDB settled BDT 16.6bn and BDT 4.3bn of receivables with special bonds in those two years [6 p.45]. Those bonds turn an operating receivable into a government security.
| BDT mn | FY2024 | FY2025 | Mar-2026 |
|---|---|---|---|
| Revenue | 34,781 | 39,085 | — |
| Cash collected from customers | 23,504 | 31,586 | — |
| BPDB receivables settled with special bonds | 16,632 | 4,305 | — |
| BPDB receivable at period end | — | 14,832 | 20,670 |
Policy has turned against capacity payments and oil-fired plants. The interim government's review of power contracts, the expiry of old rental plants on NENP terms (SPCL's 86 MW is an example) and the push to cut BPDB's subsidy all point the same way. Plants are renewed on energy-only terms, if at all [10] [9]. UPGDCL's own peer comparison shows it earning far more than the other listed IPPs. In FY2025 its EPS was BDT 20.66 against 0.29-3.19 at Khulna Power, Summit and Doreen [6 p.123].
What this means for each line of UPGDCL's model is specific. For the BPDB plants, BPDB dispatches the plants; capacity revenue is set by the PPA terms and indexation [1 p.56]. The EPZ line depends on export-factory activity in the Dhaka and Chattogram zones, which has held up: EPZ sales were 0.84 TWh in FY2025 against 0.77 TWh in FY2024 [6 p.124], and steam sales grew 45% as new factory customers signed up [6 p.47]. The fuel line depends on regulated gas and HFO prices, which the PPAs treat as "a pass-through expense" [1 p.56].
Key drivers. The official series behind each line are: the bulk tariff at 132 kV, BDT 5.85 a kWh from Mar-2020, 8.13 from Feb-2023 (SRO 23-Ain/2023), 8.47 from Feb-2024 (SRO 41-Ain/2024) and 10.07 from Jun-2026 (BERC notice 4-Jun-2026) [16]; the power-category gas tariff, BDT 4.45 a m3 from Jul-2019, 14.00 from Feb-2023, 14.75 from Feb-2024 and 15.50 from May-2024, and the captive tariff 13.85, 30.00, 30.75 and 31.50 on the same dates [15]; furnace oil at BDT 96.86 a litre (BERC price for BPC-supplied HFO, 6-Sep-2026) and BDT 108.78 (BPC retail, 1-Oct-2026), two different bases [19]; BDT/USD for the indexed charges and true-up bills; and the policy and lending rates for the short-term loans [17] [18]. The FY2022 gas tariffs (BERC order of 4-Jun-2022) are not in our data at 4-Nov-2026.
| End-June | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|
| Brent, FY average (USD/bbl) | 54.12 | 91.08 | 86.82 | 84.72 | 74.57 | 79.42 |
| BDT per USD (BB) | 84.81 | 93.45 | 106 | 118 | 122.78 | 122.85 |
| BB policy rate (%) | 4.75 | 5.50 | 6 | 8.50 | 10 | 10 |
| Banks' lending rate (%) | 7.43 | 7.24 | 7.34 | 11.70 | 12.33 | 12.13 |
| DSEX | 6,150.48 | 6,376.94 | 6,344.09 | 5,328.40 | 4,838.39 | 5,762.83 |
| Bulk tariff 132 kV (BDT/kWh) | 5.85 | 5.85 | 8.13 | 8.47 | 8.47 | 10.07 |
| Gas, power category (BDT/m3) | 4.45 | n.a. | 14 | 15.50 | 15.50 | 15.50 |
| Gas, captive (BDT/m3) | 13.85 | n.a. | 30 | 31.50 | 31.50 | 31.50 |
Competition for UPGDCL is not about price in the usual sense. The EPZ plants face no direct competitor inside the zones, but factories can also take grid power through BEPZA. The listed sector itself is shrinking: Khulna Power's HFO units shut when their PPAs expired, and Shahjibazar runs on an energy-only renewal.
| FY2025, as compiled in UPGDCL's annual report | EPS (BDT) | P/E | NAV (BDT) | Cash dividend | NOCFPS (BDT) |
|---|---|---|---|---|---|
| UPGDCL | 20.66 | 5.84 | 73.89 | 65% | 18.61 |
| Summit Power | 0.38 | 37.11 | 40.57 | 10.5% | 9.78 |
| Doreen Power | 3.19 | 7.3 | 52.43 | 10% | 11.78 |
| Khulna Power | 0.29 | 32.41 | 19.03 | 5% | 1.55 |
Gas and EPZ: BDT 8.69bn of captive-rate gas claims are unprovided
The EPZ business sells power to factories in the Dhaka and Chattogram export zones. In 9M FY2026 it billed BEPZA BDT 4.0bn, BREB BDT 0.74bn and private customers BDT 0.70bn, plus BDT 0.37bn of steam to ten zone factories such as Universal Jeans and Pacific Attires [2 p.29]. These customers sit outside BPDB's payment queue: BEPZA owed only BDT 0.38bn in March 2026 [2 p.17]. The EPZ plants are the longest-lived part of the group, contracted to 2038-39. The newer 47 MW Dhaka and 28 MW Chattogram units ran at 66% and 77% in FY2025 [6 p.188].
Gas price is the risk. The EPZ plants hold BERC IPP licences, and clause 3.5 of each gas supply agreement sets the gas price at "the rate applicable for IPP Consumers"; an Energy Ministry decision of 2-Jan-2018 changed the rate for gas used to supply BEPZA to captive power [3]. Titas Gas and Karnaphuli Gas now claim BDT 5.55bn and BDT 4.48bn of extra charges at the captive rate for 2018-2025. The company provided BDT 1.34bn and left BDT 8.69bn unprovided, which the auditor flagged [1 p.49] [1 p.3]. The company has paid the captive rate for gas used to supply "other customers" under EMRD's decision of 15-Oct-2023; on 2-Mar-2025 and 18-Mar-2025 EMRD revoked that decision and told Petrobangla and BERC to collect the captive rate for gas used to supply BEPZA [1 p.49]. The BDT 1.34bn provision was made on 30-Jun-2024 [1 p.49]. The company's writ petitions of 22-May-2019 and 23-Jun-2019 failed in the High Court Division, and its review petition for leave to appeal and civil review petition in the Appellate Division were "discharged subsequently" [1 p.5]; the judgment on the review petition is dated 08-Feb-2024 in note 48.2 and 08-Feb-2025 in the auditor's report [1 p.49] [1 p.5]. Titas disconnected gas to the 82 MW DEPZ plant on 28-Apr-2025 over the claim [3]; the company reported supply restored and the plant "fully operational" on 12-May-2025 [3]. We deduct the claim at 50% probability (75% in the bear, 25% in the bull).
For the model, the gas question shows up in three places. The EPZ forecast uses the 9M FY2026 fuel and energy cost [2 p.30]; the company has paid the captive rate on gas for other customers since 15-Oct-2023 [1 p.49]. The historical claim is a one-off cash outflow, which we treat as a probability-weighted deduction in the bridge, not a cost in the forecast; if the FY2026 annual shows a provision for it, the bridge deduction falls by the same amount and fair value barely moves. And the idle Leviathan plant at Karnaphuli EPZ is tied to the same dispute: settling the tariff could start a 50 MW plant on a 30-year BEPZA agreement [2 p.10], which our bull case values only at half its book cost.
The FY2025 audit opinion is unmodified, with emphasis of matter on the amalgamation, the gas claim, related-party transactions and the tax treatment of subsidiary dividends [1 p.2] [1 p.3]. The three key audit matters are: the amalgamation, a "common control transaction" accounted at book value from the appointed date of 01-Jul-2023 [1 p.4]; "Revenue recognition and provision for customer receivables", where energy revenue "is recognised based on the survey of the meter reading" and "assessing the prospect of recoverability for revenue that has been billed is regarded as a key audit matter" [1 p.4] [1 p.5]; and the "Additional charges claimed by the gas suppliers" of BDT 5,545,325,950 and BDT 4,484,979,778 for the DEPZ and CEPZ plants [1 p.5].
Taxes rise as holidays end. The 35 MW Dhaka and 44 MW Chattogram EPZ units became taxable in December 2023 and August 2024. The newer 47 MW and 28 MW units are exempt to 2028, and the BPDB plants to their contract ends [1 p.57]. FY2025 tax was BDT 274.5mn on BDT 12.5bn of profit before tax [1 p.12]; FY2024 tax of BDT 11.75mn at the separate company arose "due to the expiration of the tax-exempt period" [12 p.48]. The company treats dividends from its subsidiaries' tax-exempt profit as tax-exempt "Pursuant to opinions from legal counsels and judgment of the Appellate Division" [1 p.3]. From FY2029 all EPZ profit is taxed. We model tax at 27.5% of taxable EPZ and post-PPA profit plus about BDT 150mn of other tax, giving BDT 523mn in FY2029F.
Receivables: BPDB owed BDT 20.7bn in March 2026, about 311 days of its bills
BPDB's payment delays are UPGDCL's main working-capital swing. The receivable from BPDB rose from BDT 14.8bn in June 2025 to BDT 20.7bn in March 2026, and the company says it is owed nine to ten months of undisputed invoices [2 p.17]. Operating cash flow per share fell to BDT 7.22 in 9M FY2026 from 15.17 a year earlier, which the company blamed on collection delays from its main buyer [3]. Q4 then recovered, and full-year NOCFPS was BDT 12.00.
The delay is funded with debt. Short-term loans from HSBC, Dhaka Bank, City Bank, BRAC Bank and others cost 11.5-13.5% [2 p.25], and gross debt was BDT 8.1bn in March 2026 [2 p.2] [2 p.39]. We assume BPDB pays at 300 days in June 2026 and 2027 and at 180 days from FY2029; the bear holds 360 days. Our forecast collects each contract's receivable when it ends.
BPDB paid part of its arrears in power bonds: BDT 16.63bn in FY2024 and BDT 4.31bn in FY2025, which "has been used to settle short term loan directly" and is therefore not in the cash-flow statement [1 p.14] [1 p.41]. The coupon and tenor of the bonds are not printed (searched: FS25 notes 9, 40; AR2024-25 MD&A). No late-payment interest from BPDB is accrued or claimed in the notes read (searched: FS25 revenue, receivables and finance-income notes). Finance cost rose in 9M FY2026: interest on short- and long-term loans was BDT 813.9mn against BDT 365.1mn a year earlier and UPAS LC interest BDT 128.1mn against BDT 84.2mn, while interest on related-party loans fell to BDT 71.8mn from BDT 577.9mn; net finance cost was BDT 984.9mn against BDT 0.7mn [2 p.32]. For the full year, related-party loan interest was BDT 756.2mn in FY2024 and BDT 184.9mn in FY2025 [6 p.176].

The BPDB receivable rose from BDT 14,830mn at Jun-25 to BDT 20,670mn at Mar-26.
Related-party lending is the second balance-sheet issue. UPGDCL and UAEL lend to group companies through a central treasury, and the auditor notes these funding flows arise from BPDB's delays [1 p.3]. The balances moved sharply in 9M FY2026. On the asset side, the receivable from United Mymensingh Power fell from BDT 19.04bn to BDT 3.4mn, while the receivable from United Enterprises & Co. (UECL) rose from BDT 4.49bn to BDT 10.16bn; total related-party receivables went from BDT 23.53bn to BDT 10.29bn [2 p.18]. On the liability side, the amount owed to UECL fell from BDT 13.12bn to BDT 2.55bn, and the total from BDT 14.02bn to BDT 3.60bn [2 p.28].
The separate-company related-party table shows how. In 9M FY2026 UPGDCL received BDT 37.80bn of loans from UMPL and gave it BDT 16.15bn, turning a BDT 21.25bn receivable into a BDT 0.40bn payable; it gave UECL BDT 19.19bn and received BDT 3.24bn, turning a BDT 7.00bn payable into a BDT 8.96bn receivable [2 p.35]. The filings describe loan flows, not a netting or assignment, and print no board or shareholder approval for them (searched: Q3 FY2026 notes 12, 28, 43). Loans taken from related parties carry no interest, except UAEL's payable to UECL [1 p.36]; UAEL's receivable from UECL and the UMPL balances of the EPZ plants are "interest bearing loan and receivable on demand" [2 p.18], and the rate is not printed. The auditor ties the central treasury to "significant delays in receiving payment from customers, in particular BPDB" [1 p.3].
| BDT mn (separate company) | 9M FY2026 | 9M FY2025 | 31-Mar-2026 | 30-Jun-2025 |
|---|---|---|---|---|
| UMPL: loans received from UMPL | (37,802) | (6,716) | — | — |
| UMPL: loans given to UMPL | 16,147 | 4,906 | — | — |
| UMPL: balance receivable/(payable) | — | — | (403) | 21,251 |
| UECL: loans received from UECL | (3,237) | (13,417) | — | — |
| UECL: loans given to UECL | 19,191 | 19,398 | — | — |
| UECL: balance receivable/(payable) | — | — | 8,955 | (6,999) |
| Interest on related-party loans (consolidated) | 72 | 578 | — | — |
| Interest on bank loans (consolidated) | 814 | 365 | — | — |
The net position fell from BDT 9.51bn to BDT 6.69bn. Net of what UPGDCL owes it interest-free, UECL owes BDT 7.61bn, interest-bearing and on demand. In the bridge we add the BDT 6.69bn net balance and deduct a 30% haircut on the BDT 7.61bn net UECL exposure (50% bear, 10% bull), for BDT 4,411mn. The forecast earns no interest on these loans; the bridge counts them once.
UAEL: the 92.4%-owned 195 MW plant adds BDT 14.6 a share of contract value to its 2030 PPA end
United Ashuganj Energy (UAEL) runs a 195 MW gas plant at Ashuganj, in operation since 8-May-2015 under a 15-year BPDB PPA ending in 2030 [2 p.10]. It ran at 56% in FY2025 [6 p.188]. Its capacity payment was BDT 2.78bn in 9M FY2026 (consolidated less separate) [2 p.29]. Its profit, inferred from the 7.59% minority share of BDT 147.6mn, was about BDT 1.9bn [2 p.3]. It is funded with 12% preference shares and a USD IPFF loan [2 p.24]. On 25-Oct-2026 it declared a 60% cash dividend, BDT 6.00 a share on 400.4mn shares [3].
UAEL's dividends were 35% (BDT 1,295m) for FY2024, 15% for FY2025 and 60% for FY2026 [3]. The filings give no reason for the changes (searched: DSE posts, Q3 FY2026 note 43).
UAEL passes the significance test (over 10% of profit). It is consolidated and its cash flows are contracted like the parent's; we value it inside the contract-by-contract DCF rather than as a separate leg: we take 92.4% of its EBITDA and stop at the PPA end. A sum of the parts in the skill's sense does not apply: no part is listed or has different economics.
| BDT mn, attributable | FY2027F EBITDA | Contract ends | PV to contract end | BDT per share |
|---|---|---|---|---|
| G1 HFO: Anwara 300 + Jamalpur 115 MW | 7,412 | 2034 | 36,590 | 63 |
| G2 gas: Ashuganj 53 + Sylhet 28 MW | 781 | 2027 | 805 | 1 |
| G3 UAEL 195 MW (92.4%) | 2,778 | 2030 | 8,450 | 15 |
| G4 EPZ: DEPZ 82 + CEPZ 72 MW | 1,725 | 2038-39 | 10,402 | 18 |
Earnings quality: operating cash flow covered EPS in only two of the last five years
Reported profit and cash are far apart in single years. Operating cash flow per share was BDT 1.89 against EPS of 17.21 in FY2022, and negative BDT 0.88 against 14.01 in FY2024. It exceeded EPS in FY2023 (19.40) when BPDB paid down arrears, and nearly matched it in FY2025 (18.61) [7 p.118] [6 p.45]. Over FY2022-26 cumulative operating cash flow was BDT 51.0 a share against cumulative EPS of 81.7. The gap is the receivable build-up and the bond settlements, which are not cash.

FY26 EPS was BDT 15.94 against operating cash flow of BDT 12 per share; FY24 cash flow was BDT -0.88.
Three other items lower earnings quality. First, supplemental and true-up bills (BDT 1.3-1.5bn a year in FY2024-25) are tariff catch-ups, not run-rate profit [1 p.37]. Second, UAEL's capacity revenue is straight-lined under IFRS 16, so booked revenue differs slightly from billing [2 p.29]. Third, O&M is bought at cost plus a fee from a group company, UEPSL [1 p.38]. On the other hand, the auditor's report carries an emphasis of matter but no qualification [3], and the plants are depreciated to PPA end, which avoids overstating book value.
The company has not explained the low fourth quarters directly. Its stated reasons for quarterly changes are: Q3 FY2026 EPS fell on "lower production levels and the absence of supplemental revenue" [3]; Q1 FY2024 on "exchange loss in foreign currency transactions" and higher borrowing cost [21]. Q1 + Q2 + Q3 FY2026 EPS (4.94 + 5.06 + 4.69) equals the 9M figure of 14.69, and the full year of 15.94 leaves 1.25 for Q4 [3].
| BDT mn | Q1 FY25 | Q2 FY25 | Q3 FY25 | Q4 FY25 | Q1 FY26 | Q2 FY26 | Q3 FY26 | Q4 FY26 |
|---|---|---|---|---|---|---|---|---|
| Revenue | 11,475 | 9,535 | 9,584 | 8,491 | — | — | 6,743 | — |
| Gross profit | 4,563 | 3,033 | 4,234 | 1,439 | — | — | — | — |
| Net profit (incl. NCI) | 4,189 | 2,926 | 4,238 | 831 | — | — | 2,757 | — |
| EPS (BDT) | 7.13 | 4.98 | 7.21 | 1.34 | 4.94 | 5.06 | 4.69 | 1.25 |

4Q26 EPS was BDT 1.25 and 4Q25 BDT 1.34, against BDT 4.69-7.21 in the other quarters shown.
Forecast: EPS of BDT 15.94 in FY26 (DSE), 14.32 in FY27F without supplemental bills, then 14.47 in FY31F after UAEL ends
FY2026E is built from named drivers, not a plug. The nine-month figures are annualised and then cut by a Q4 seasonal line: in FY2024 and FY2025 Q4 gross profit fell 18% and 16% short of four times the Q1-Q3 average [6 p.124], so we deduct 17% of run-rate gross profit every year. Supplemental bills enter FY2026E at their 9M value of BDT 895mn. That gives FY2026E profit to owners about BDT 190mn (0.33 a share) below the announced BDT 9,240mn. We show the difference as a residual until the annual explains it.
FY2027F revenue is BDT 30,239mn. That is capacity payments of BDT 11,147mn after the 5% haircut, plus energy and EPZ revenue at the 9M run-rate. Fuel is 70.3% of pass-through revenue, as in 9M FY2026 [2 p.29] [2 p.30]. Fixed O&M is BDT 2.3mn per MW. Depreciation stays at BDT 3,394mn and falls to zero for each plant at its PPA end. Net finance cost turns into income from FY2028F as BPDB arrears unwind and debt is repaid. EPS is BDT 14.32 in FY2027F and 16.68 in FY2030F. It falls to 14.47 in FY2031F without UAEL and to 7.77 in FY2035F without the HFO plants.
The balance sheet follows the same drivers. BPDB receivables fall from BDT 19,688mn (June 2026E) to BDT 9,956mn by June 2029F as payment days return to 180. As UAEL and the HFO plants end, their receivables are collected, and debt turns into net cash from FY2028F (BDT 29,065mn of net cash in FY2029F). Inventories and trade payables move with fuel cost (99 and 169 days, the March 2026 levels [2 p.2]). Capex is maintenance only, BDT 200mn a year; no new plant has been announced [3]. Operating cash flow is BDT 13,048mn in FY2027F and BDT 16,527mn in FY2028F, well above profit while arrears unwind, against BDT 6.96bn implied by the FY2026 NOCFPS [3].
| EPS bridge, BDT | Value |
|---|---|
| FY2026 EPS (DSE) | 15.94 |
| Supplemental bills not repeated | -1.28 |
| Capacity haircut 5% | -1.01 |
| Lower finance cost as arrears unwind | 1.07 |
| Residual to DSE and other | -0.40 |
| FY2027F EPS (model) | 14.32 |
| Driver | FY2026E | FY2027F | FY2028F | FY2029F | FY2030F | Why |
|---|---|---|---|---|---|---|
| Dispatch factor vs 9M FY26 run-rate | 100% | 100% | 100% | 100% | 100% | History: GWh sold ranged 2.0-3.7 TWh FY21-25 |
| Capacity-review haircut | 0% | 5% | 5% | 5% | 5% | Contract review (Daily Star) |
| Q4 seasonal shortfall, % of run-rate GP | 17% | 17% | 17% | 17% | 17% | FY24 18.2%, FY25 15.9% |
| BPDB receivable days | 300 | 300 | 240 | 180 | 180 | 311 at Mar-26 |
| Supplemental bills (BDT mn) | 895 | 0 | 0 | 0 | 0 | One-off gas-price catch-up |
| Payout | 38% | 40% | 40% | 60% | 60% | 5-yr median 58% |
| UAEL / G1 contract active | 100% / 100% | 100% / 100% | 100% / 100% | 100% / 100% | 85% / 100% | PPA end years |
| FY2025A | FY2026E | FY2027F | FY2028F | FY2029F | FY2030F | |
|---|---|---|---|---|---|---|
| Revenue | 39,085 | 31,721 | 30,239 | 28,793 | 27,957 | 27,266 |
| Capacity payments | 11,639 | 11,734 | 11,147 | 10,537 | 10,537 | 10,009 |
| EBITDA | 16,573 | 14,247 | 12,865 | 12,135 | 12,084 | 11,633 |
| Profit attributable to owners | 11,976 | 9,240 | 8,300 | 8,565 | 9,152 | 9,670 |
| EPS (BDT) | 20.66 | 15.94 | 14.32 | 14.78 | 15.79 | 16.68 |
| DPS declared for the year (BDT) | 6.50 | 6.00 | 5.73 | 5.91 | 9.47 | 10.01 |
| ROE | 31.0% | 20.3% | 16.4% | 15.4% | 14.9% | 14.6% |
| P/E at BDT 112.2 | 5.4x | 7.0x | 7.8x | 7.6x | 7.1x | 6.7x |
| P/B at BDT 112.2 | 1.5x | 1.3x | 1.2x | 1.1x | 1.0x | 1.0x |
| Dividend yield at BDT 112.2 | 5.8% | 5.3% | 5.1% | 5.3% | 8.4% | 8.9% |
| BPDB receivable days | — | 300 | 300 | 240 | 180 | 180 |
Valuation: contract DCF and DDM give a fair value range of BDT 79.7-117.8, base 94.3 (6.6x FY27F EPS)
Method. Each contract group's EBITDA (capacity payment + energy spread - fixed O&M, after the Q4 seasonal cut) is discounted to its contract end. Group tax, maintenance capex, G&A and working-capital changes are discounted separately, and the working capital left at 2039 is collected in 2040. No value is added after 2039, and salvage or land value is set to zero; none is disclosed. The cost of equity is 15.6%. We discount at the cost of equity and deduct June-2026 net debt; the debt is short-term working-capital loans [2 p.25].
| Input | Value | Source |
|---|---|---|
| Risk-free rate (10-yr T-bond cut-off, 25-Oct-2026) | 9.27% | Bangladesh Bank |
| Raw beta vs DSEX (104 weekly returns) | 0.87 (R-squared 0.31) | chart_bars |
| Blume-adjusted beta (F23 floor 0.7, not binding) | 0.91 | 0.67 x raw + 0.33 |
| Equity risk premium | 7.0% | Mature ERP + BD country premium |
| Cost of equity | 15.6% | CAPM, no liquidity premium |
| Bridge (base) | BDT mn | BDT per share |
|---|---|---|
| Four contract groups, PV to each contract end | 56,247.4 | 97.0 |
| Less tax, capex and G&A; plus working capital released | 6,381.1 | 11.0 |
| Residual working capital after 2039 | -23.9 | -0.0 |
| Less net debt, Jun-26E | -4,679.3 | -8.1 |
| Related-party balances net (6,694) less 30% haircut on net UECL loan (7,610) | 4,411.4 | 7.6 |
| Leviathan Global work in progress x 25% recovery x 75% | 474.1 | 0.8 |
| Captive-rate gas claim BDT 8.69bn x 50% | -4,343.9 | -7.5 |
| Equity value / DCF per share | 58,467.0 | 100.9 |
| DDM per share (same haircuts) | — | 67.9 |
| Fair value, 80% DCF + 20% DDM | — | 94.3 |
The DDM is BDT 33.0 a share below the DCF, for two quantified reasons. First, timing (14.9): the DCF counts receivables released by BPDB as cash at once, while the DDM pays dividends out of accounting profit and that cash sits in book until 2039 even at a 100% payout (DDM 85.9). Second, retention (18.0): at our 40%/60% payout the retained cash earns the 6.21% average bank deposit rate (SBS Table-102), against a 15.6% cost of equity. Both are real costs to a minority shareholder in a group that has lent surplus cash to its sponsor. We weight the DCF 80% and the DDM 20%. F23 suggests 50% sum of the parts, 30% DDM and 20% P/E. We drop the P/E leg: we have no peer figures from filings on the same basis, and the peer table is context only.
| DCF to DDM, BDT per share | Value |
|---|---|
| Contract DCF | 100.9 |
| Timing: released receivables sit in book until FY2039 under DDM | -14.9 |
| DDM with 100% payout from FY2027 | 85.9 |
| Retention: cash kept at the 6.21% deposit rate vs a 15.6% cost of equity | -18.0 |
| DDM at the modelled payout (40% / 60% / 100%) | 67.9 |
The base value is 6.6x FY2027F EPS and 1.13x FY2026 NAV, a 6.1% yield on FY2027F DPS and an EV of BDT 74.7mn per operating MW. Post-PPA cash flows are 0.0% of value in the base case, where one NENP year earns about its own O&M, and 12% in the bull. Both are below F23's 25% flag.
| Bear | Base | Bull | |
|---|---|---|---|
| Post-PPA cash flows, share of equity value | 0.0% | 0.0% | 11.7% |
| Contracted cash flows to PPA ends (BDT per share) | 90.7 | 97.0 | 118.1 |
| Bear | Base | Bull | |
|---|---|---|---|
| Dispatch factor FY27-FY28 (vs 9M FY26 run-rate) | 85% | 100% | 115% |
| Capacity-payment review haircut | 10% | 5% | 0% |
| BPDB receivable days FY27 / FY29 | 360 / 300 | 300 / 180 | 240 / 120 |
| After each BPDB PPA | Shut | 1 NENP year at 50% dispatch | 5-yr renewal, 50% capacity rate |
| Gas claim probability / sponsor-loan haircut | 75% / 50% | 50% / 30% | 25% / 10% |
| FY2027F EPS (BDT) | 12.37 | 14.32 | 16.27 |
| Fair value (BDT per share) | 79.7 | 94.3 | 117.8 |
| Implied P/B on FY26 NAV 83.33 | 1.0x | 1.1x | 1.4x |
| Probability | 30% | 50% | 20% |
The bull is wider than the bear (BDT 23.5 above base vs 14.6 below). A five-year renewal of the BPDB plants adds value that the bear cannot take away: the bear's shutdown costs little, since the base's single NENP year roughly covers its O&M. The price of BDT 112.2 sits between our base and bull cases.
| Ke \ post-PPA basis | Zero | NENP 1 yr | NENP 2 yrs | Renewal 30% | Renewal 50% |
|---|---|---|---|---|---|
| Ke 13.6% | 100.6 | 100.4 | 100.2 | 106.1 | 109.4 |
| Ke 14.6% | 97.5 | 97.2 | 97.0 | 102.5 | 105.5 |
| Ke 15.6% | 94.5 | 94.3 | 94.1 | 99.1 | 101.9 |
| Ke 16.6% | 91.7 | 91.5 | 91.3 | 95.9 | 98.6 |
| Ke 17.6% | 89.1 | 88.9 | 88.7 | 93.0 | 95.4 |
| Year end | Price implied by market cap (BDT) | P/B | Dividend yield |
|---|---|---|---|
| FY2022 (floor-price period) | 248.60 | 4.41 | 0.07 |
| FY2023 (floor-price period) | 233.70 | 4.39 | 0.03 |
| FY2025 | 120.60 | 1.63 | 0.05 |
| 29-Oct-2026 | 112.20 | 1.35 | 0.05 |
| Base fair value | 94.30 | 1.13 | 0.06 |
Risks: capacity-payment review, BPDB arrears of BDT 20.7bn, the BDT 8.69bn unprovided gas claim and a net BDT 7.6bn sponsor loan
Each risk below is a line in the model. Contract review cuts the capacity-payment line. Lower dispatch cuts pass-through revenue and the energy spread. Slower BPDB payment raises receivable days and debt. The gas claim and the sponsor loans enter the valuation bridge. The bear case moves all of them together.
| Risk (line it moves) | Printed amount | Date | Source |
|---|---|---|---|
| Contract review: capacity payments | BDT 11,639mn (FY2025); BDT 8,800mn (9M FY2026) | Jun-2025 / Mar-2026 | FS25 p.37; Q3 p.29 |
| BPDB arrears: trade receivable | BDT 20,670mn, nine to ten months of invoices | 31-Mar-2026 | Q3 p.17 |
| Gas claim: captive-rate claims, unprovided | BDT 10,030mn claimed; BDT 1,342mn provided; BDT 8,688mn unprovided | 30-Jun-2025 | FS25 p.49 |
| Sponsor loans: net owed by UECL | Receivable BDT 10,159mn less payable BDT 2,549mn | 31-Mar-2026 | Q3 p.18, p.28 |
| Funding: short-term loans | 11.5-13.5% from about ten banks | 31-Mar-2026 | Q3 p.25 |
| Dispatch: electricity sold | 2,462 GWh (FY2025); 1,990 GWh (FY2024) | FY2025 | AR25 p.124 |
Two smaller items. The USD IPFF loan at UAEL and the HFO import letters of credit expose the group to the taka; in FY2024 it booked an FX loss of BDT 824mn [1 p.12], which fell to BDT 60mn in FY2025 as the exchange rate stabilised. The policy states true-up bills cover the difference between billing and payment-date exchange rates [1 p.56]. Second, the 53 MW Ashuganj plant has sold nothing for five years [6 p.124]. The filings do not say whether it is paid a capacity charge.
- Governance: a net BDT 7.6bn owed by the sponsor and a central group treasury; dividends from tax-exempt UAEL profit are treated as tax-exempt on legal counsel's opinion and an Appellate Division judgment [1 p.3]. Board changes: Kutubuddin Akhter Rashid appointed Managing Director (DSE 4-Feb-2025) and Maj. Gen. Abul Kalam Mohammad Ziaur Rahman Chairman (DSE 16-Mar-2026); the posts do not name the predecessors [3]. ECRL's rating letter of 14-Dec-2025 is in our corpus without the rationale report [20].
- Leviathan Global: BDT 2.5bn of work in progress idle over a gas-tariff dispute with Karnaphuli Gas [2 p.10]; we count 25% x 75% of it.
- Policy: an end to IPP renewals, or a forced renegotiation of HFO tariffs.
- Opportunity: settlement of BPDB arrears through bonds or budget support would release cash faster than our 180-day assumption.
What to watch: the FY2026 annual's Q4 detail, the 19-Nov-2026 record date and the 2027 PPA ends
- Record date 19-Nov-2026 for the BDT 6.00 dividend; AGM 23-Dec-2026, held digitally (DSE).
- FY2026 audited annual: the Q4 detail, the June-2026 BPDB receivable and any new gas-claim provision.
- Q1 FY2027 results (due about November 2026): dispatch and collections.
- 2027: Ashuganj 53 MW and Sylhet 28 MW contract ends - renewal or shutdown.
Model note: this report uses the FY2025 annual, the 9M FY2026 interim and the FY2026 DSE announcement; the audited FY2026 statements were not in our corpus at 4-Nov-2026.
The model
Assumptions
| Driver | FY2024A | FY2025A | FY2026E | FY2027F | FY2028F | FY2029F | FY2030F | FY2031F | FY2032F | FY2033F | FY2034F | FY2035F | FY2036F | FY2037F | FY2038F | FY2039F |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Scenario selector (1 bear, 2 base, 3 bull) | 2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Cost of equity adjustment (sensitivity grids only) | 0.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Shares outstanding (mn) | 579.70 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| DSE-disclosed FY2026 profit to owners = EPS 15.94 x shares | 9,240.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Fiscal year (ends June) | 2,024 | 2,025 | 2,026 | 2,027 | 2,028 | 2,029 | 2,030 | 2,031 | 2,032 | 2,033 | 2,034 | 2,035 | 2,036 | 2,037 | 2,038 | 2,039 |
| Scenario drivers (bear / base / bull rows; the active row feeds the model) | ||||||||||||||||
| Dispatch and spread factor vs 9M FY26 run-rate (pass-through revenue): bear | — | — | — | 85.0% | 85.0% | 90.0% | 95.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% |
| Dispatch and spread factor vs 9M FY26 run-rate (pass-through revenue): base | — | — | — | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% |
| Dispatch and spread factor vs 9M FY26 run-rate (pass-through revenue): bull | — | — | — | 115.0% | 115.0% | 110.0% | 105.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% |
| Dispatch and spread factor vs 9M FY26 run-rate (pass-through revenue) | — | — | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% |
| Contract-review haircut on capacity payments: bear | — | — | — | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% | 10.0% |
| Contract-review haircut on capacity payments: base | — | — | — | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% |
| Contract-review haircut on capacity payments: bull | — | — | — | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| Contract-review haircut on capacity payments | — | — | 0.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% | 5.0% |
| BPDB receivable days (year end, on BPDB revenue): bear | — | — | — | 360 | 360 | 300 | 240 | 240 | 240 | 240 | 240 | 240 | 240 | 240 | 240 | 240 |
| BPDB receivable days (year end, on BPDB revenue): base | — | — | — | 300 | 240 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 180 |
| BPDB receivable days (year end, on BPDB revenue): bull | — | — | — | 240 | 150 | 120 | 120 | 120 | 120 | 120 | 120 | 120 | 120 | 120 | 120 | 120 |
| BPDB receivable days (year end, on BPDB revenue) | — | — | 300 | 300 | 240 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 180 |
| Post-PPA years run (BPDB plants): bear | 0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA years run (BPDB plants): base | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA years run (BPDB plants): bull | 5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA years run (BPDB plants) | 1 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA dispatch vs contract-period run-rate: bear | 0.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA dispatch vs contract-period run-rate: base | 50.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA dispatch vs contract-period run-rate: bull | 75.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA dispatch vs contract-period run-rate | 50.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA capacity payment kept: bear | 0.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA capacity payment kept: base | 0.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA capacity payment kept: bull | 50.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA capacity payment kept | 0.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Probability that the captive-rate gas claim is paid: bear | 75.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Probability that the captive-rate gas claim is paid: base | 50.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Probability that the captive-rate gas claim is paid: bull | 25.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Probability that the captive-rate gas claim is paid | 50.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Haircut on net loans to United Enterprises & Co (sponsor): bear | 50.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Haircut on net loans to United Enterprises & Co (sponsor): base | 30.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Haircut on net loans to United Enterprises & Co (sponsor): bull | 10.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Haircut on net loans to United Enterprises & Co (sponsor) | 30.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Recovery of Leviathan Global (KEPZ 50 MW) work in progress: bear | 0.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Recovery of Leviathan Global (KEPZ 50 MW) work in progress: base | 25.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Recovery of Leviathan Global (KEPZ 50 MW) work in progress: bull | 50.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Recovery of Leviathan Global (KEPZ 50 MW) work in progress | 25.0% | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Other drivers (all scenarios) | ||||||||||||||||
| Contract active share, G1 HFO (Anwara 300 + Jamalpur 115 MW) | — | — | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 91.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| Contract active share, G2 small gas (Ashuganj 53 + Sylhet 28 MW) | — | — | 100.0% | 100.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| Contract active share, G3 UAEL 195 MW | — | — | 100.0% | 100.0% | 100.0% | 100.0% | 85.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| Contract active share, G4 EPZ (DEPZ 82 + CEPZ 72 MW) | — | — | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 47.0% |
| Capacity payment run-rate, G1 (BDT mn, 100%) | — | — | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 | 7,381 |
| Capacity payment run-rate, G2 (BDT mn, 100%) | — | — | 642 | 642 | 642 | 642 | 642 | 642 | 642 | 642 | 642 | 642 | 642 | 642 | 642 | 642 |
| Capacity payment run-rate, G3 UAEL (BDT mn, 100%) | — | — | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 | 3,711 |
| Pass-through revenue run-rate (fuel + energy), G1 | — | — | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 |
| Pass-through revenue run-rate, G2 | — | — | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 | 1,672 |
| Pass-through revenue run-rate, G3 UAEL | — | — | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 | 1,083 |
| EPZ revenue run-rate (BEPZA, BREB, private, steam), G4 | — | — | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 |
| Fuel and energy cost / pass-through revenue | — | — | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% | 70.3% |
| Fixed O&M per MW (spares, lube, other direct; BDT mn) | — | — | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 | 2.31 |
| Depreciation G1 while active | — | — | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 |
| Depreciation G2 while active | — | — | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 |
| Depreciation G3 UAEL while active | — | — | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 | 1,097 |
| Depreciation G4 EPZ while active | — | — | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 |
| Maintenance capex (BDT mn) | — | — | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 |
| General and admin (BDT mn) | — | — | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 |
| Share of EPZ profit that is taxable | — | — | 51.3% | 51.3% | 51.3% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% |
| Corporate tax rate on taxable plant profit | — | — | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% | 27.5% |
| Other tax (finance income, minimum tax; BDT mn) | — | — | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 |
| Interest rate on gross debt | — | — | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% | 12.0% |
| Interest rate earned on net cash | — | — | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% | 6.2% |
| Q4 seasonal shortfall, % of run-rate gross profit | — | — | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% | 17.0% |
| EPZ and other receivable days | — | — | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 |
| Inventory days (on fuel cost) | — | — | 99 | 99 | 99 | 99 | 99 | 99 | 99 | 99 | 99 | 99 | 99 | 99 | 99 | 99 |
| Trade payable days (on fuel cost) | — | — | 169 | 169 | 169 | 169 | 169 | 169 | 169 | 169 | 169 | 169 | 169 | 169 | 169 | 169 |
| Dividend payout (DPS / EPS) | — | — | — | 40.0% | 40.0% | 60.0% | 60.0% | 60.0% | 60.0% | 60.0% | 60.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% |
| UAEL finance cost (BDT mn, for NCI) | — | — | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 | 150 |
| Post-PPA year switch, group 1 (1 = running on renewal/NENP) | — | — | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 |
| Post-PPA year switch, group 2 (1 = running on renewal/NENP) | — | — | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Post-PPA year switch, group 3 (1 = running on renewal/NENP) | — | — | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Income statement
| BDT mn | FY2024A | FY2025A | FY2026E | FY2027F | FY2028F | FY2029F | FY2030F | FY2031F | FY2032F | FY2033F | FY2034F | FY2035F | FY2036F | FY2037F | FY2038F | FY2039F |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue by contract group | ||||||||||||||||
| Capacity payment, G1 HFO (Anwara, Jamalpur) | — | — | 7,381 | 7,012 | 7,012 | 7,012 | 7,012 | 7,012 | 7,012 | 7,012 | 6,381 | 0 | 0 | 0 | 0 | 0 |
| Pass-through revenue (fuel + energy), G1 HFO (Anwara, Jamalpur) | — | — | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 8,569 | 7,798 | 4,284 | 0 | 0 | 0 | 0 |
| Capacity payment, G2 small gas (Ashuganj 53, Sylhet 28) | — | — | 642 | 610 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Pass-through revenue (fuel + energy), G2 small gas (Ashuganj 53, Sylhet 28) | — | — | 1,672 | 1,672 | 836 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Capacity payment, G3 UAEL 195 MW (92.4%) | — | — | 3,711 | 3,525 | 3,525 | 3,525 | 2,997 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Pass-through revenue (fuel + energy), G3 UAEL 195 MW (92.4%) | — | — | 1,083 | 1,083 | 1,083 | 1,083 | 921 | 542 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| EPZ customer revenue, G4 EPZ (DEPZ, CEPZ) | — | — | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 7,768 | 3,651 |
| Supplemental and true-up bills (BPDB) | 1,296 | 1,467 | 895 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Capacity payments, total | 10,718 | 11,639 | 11,734 | 11,147 | 10,537 | 10,537 | 10,009 | 7,012 | 7,012 | 7,012 | 6,381 | 0 | 0 | 0 | 0 | 0 |
| Revenue | 34,781 | 39,085 | 31,721 | 30,239 | 28,793 | 27,957 | 27,266 | 23,890 | 23,349 | 23,349 | 21,947 | 12,052 | 7,768 | 7,768 | 7,768 | 3,651 |
| Fuel and energy cost | 19,313 | 20,545 | 13,414 | 13,414 | 12,827 | 12,239 | 12,125 | 11,859 | 11,478 | 11,478 | 10,937 | 8,468 | 5,458 | 5,458 | 5,458 | 2,565 |
| Fixed O&M (spares, lube, other direct) | 1,877 | 1,890 | 1,949 | 1,949 | 1,949 | 1,762 | 1,694 | 1,762 | 1,312 | 1,312 | 1,226 | 1,312 | 355 | 355 | 355 | 167 |
| Depreciation, G1 HFO (Anwara, Jamalpur) | — | — | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,597 | 1,453 | 0 | 0 | 0 | 0 | 0 |
| Depreciation, G2 small gas (Ashuganj 53, Sylhet 28) | — | — | 100 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Depreciation, G3 UAEL 195 MW (92.4%) | — | — | 1,097 | 1,097 | 1,097 | 1,097 | 932 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Depreciation, G4 EPZ (DEPZ, CEPZ) | — | — | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 282 |
| Depreciation | 3,339 | 3,383 | 3,394 | 3,394 | 3,294 | 3,294 | 3,129 | 2,197 | 2,197 | 2,197 | 2,053 | 600 | 600 | 600 | 600 | 282 |
| Cost of sales | 24,529 | 25,817 | 18,757 | 18,757 | 18,069 | 17,295 | 16,949 | 15,818 | 14,987 | 14,987 | 14,216 | 10,380 | 6,413 | 6,413 | 6,413 | 3,014 |
| Gross profit | 10,251 | 13,268 | 10,913 | 9,531 | 8,901 | 8,850 | 8,563 | 6,700 | 6,940 | 6,940 | 6,417 | 1,388 | 1,125 | 1,125 | 1,125 | 529 |
| Q4 seasonal shortfall (FY24-25 Q4 gross profit vs run-rate; cause not disclosed) | — | — | -2,052 | -1,952 | -1,823 | -1,813 | -1,754 | -1,372 | -1,421 | -1,421 | -1,314 | -284 | -230 | -230 | -230 | -108 |
| General and admin | 260 | 78 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 |
| Other income less FX loss | -776 | -70 | -3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Net finance cost | 942 | 662 | 1,313 | 694 | -218 | -1,021 | -1,805 | -2,269 | -2,654 | -3,037 | -3,409 | -3,784 | -4,018 | -4,142 | -4,174 | -4,201 |
| Residual to DSE-announced FY26 profit (explained when the annual is filed) | — | — | 190 | — | — | — | — | — | — | — | — | — | — | — | — | — |
| Profit before tax | 8,273 | 12,458 | 9,726 | 8,777 | 9,059 | 9,810 | 10,308 | 8,909 | 9,534 | 9,917 | 9,765 | 5,112 | 5,082 | 5,206 | 5,239 | 4,670 |
| Income tax | 15 | 274 | 339 | 341 | 358 | 523 | 523 | 523 | 523 | 523 | 523 | 610 | 523 | 523 | 523 | 325 |
| Profit after tax | 8,259 | 12,184 | 9,388 | 8,436 | 8,701 | 9,288 | 9,786 | 8,387 | 9,011 | 9,394 | 9,243 | 4,502 | 4,560 | 4,684 | 4,716 | 4,344 |
| Non-controlling interests (7.59% of UAEL) | 136 | 207 | 147 | 136 | 136 | 136 | 115 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Profit attributable to owners | 8,123 | 11,976 | 9,240 | 8,300 | 8,565 | 9,152 | 9,670 | 8,387 | 9,011 | 9,394 | 9,243 | 4,502 | 4,560 | 4,684 | 4,716 | 4,344 |
| EPS (BDT) | 14.01 | 20.66 | 15.94 | 14.32 | 14.78 | 15.79 | 16.68 | 14.47 | 15.54 | 16.21 | 15.94 | 7.77 | 7.87 | 8.08 | 8.14 | 7.49 |
| DPS declared for the year (BDT) | 6.00 | 6.50 | 6.00 | 5.73 | 5.91 | 9.47 | 10.01 | 8.68 | 9.33 | 9.72 | 9.57 | 7.77 | 7.87 | 8.08 | 8.14 | 7.49 |
Balance sheet
| BDT mn | FY2024A | FY2025A | FY2026E | FY2027F | FY2028F | FY2029F | FY2030F | FY2031F | FY2032F | FY2033F | FY2034F | FY2035F | FY2036F | FY2037F | FY2038F | FY2039F |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Property, plant and equipment | — | 30,217 | 27,023 | 23,829 | 20,735 | 17,641 | 14,711 | 12,714 | 10,717 | 8,720 | 6,867 | 6,467 | 6,067 | 5,667 | 5,267 | 5,185 |
| Capital work in progress (mostly Leviathan KEPZ) | — | 2,394 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 | 2,529 |
| Receivable from BPDB | — | 14,832 | 19,688 | 18,470 | 13,825 | 9,956 | 9,616 | 7,951 | 7,684 | 7,684 | 6,992 | 2,113 | 0 | 0 | 0 | 0 |
| EPZ and other receivables (net of provision) | — | 704 | 702 | 702 | 702 | 702 | 702 | 702 | 702 | 702 | 702 | 702 | 702 | 702 | 702 | 330 |
| Receivable from related parties | — | 23,532 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 | 10,290 |
| Inventories (HFO, gas spares) | — | 3,860 | 3,638 | 3,638 | 3,479 | 3,320 | 3,289 | 3,217 | 3,113 | 3,113 | 2,966 | 2,297 | 1,480 | 1,480 | 1,480 | 696 |
| Cash and equivalents | — | 1,079 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 | 1,100 |
| Other assets (advances, AIT, securities, right-of-use) | — | 686 | 751 | 751 | 751 | 751 | 751 | 751 | 751 | 751 | 751 | 751 | 751 | 751 | 751 | 751 |
| Total assets | — | 77,304 | 65,721 | 61,309 | 53,411 | 46,289 | 42,988 | 39,254 | 36,886 | 34,889 | 32,198 | 26,249 | 22,919 | 22,519 | 22,119 | 20,881 |
| Trade and other payables | — | 7,946 | 6,211 | 6,211 | 5,939 | 5,667 | 5,614 | 5,491 | 5,315 | 5,315 | 5,064 | 3,921 | 2,527 | 2,527 | 2,527 | 1,188 |
| Payable to related parties | — | 14,025 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 | 3,595 |
| Other liabilities (tax, accruals, deferred revenue, leases, unclaimed dividend) | — | 720 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 | 1,187 |
| Equity attributable to owners | 34,335 | 42,834 | 48,306 | 53,128 | 58,373 | 64,099 | 68,278 | 70,863 | 74,842 | 78,830 | 82,435 | 81,392 | 81,450 | 81,574 | 81,606 | 81,234 |
| Non-controlling interests | 483 | 584 | 643 | 697 | 751 | 805 | 851 | 851 | 851 | 851 | 851 | 851 | 851 | 851 | 851 | 851 |
| Debt: short-term loans, term loans, preference shares (net of excess cash if negative) | — | 11,196 | 5,779 | -3,509 | -16,435 | -29,065 | -36,538 | -42,734 | -48,904 | -54,888 | -60,935 | -64,698 | -66,691 | -67,215 | -67,647 | -67,175 |
| Total liabilities and equity | — | 77,303 | 65,721 | 61,309 | 53,411 | 46,289 | 42,988 | 39,254 | 36,886 | 34,889 | 32,198 | 26,249 | 22,919 | 22,519 | 22,119 | 20,881 |
| Balance check | — | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| NAV per share (BDT) | 59.23 | 73.89 | 83.33 | 91.65 | 100.70 | 110.57 | 117.78 | 122.24 | 129.11 | 135.98 | 142.20 | 140.41 | 140.50 | 140.72 | 140.77 | 140.13 |
Cash flow
| BDT mn | FY2024A | FY2025A | FY2026E | FY2027F | FY2028F | FY2029F | FY2030F | FY2031F | FY2032F | FY2033F | FY2034F | FY2035F | FY2036F | FY2037F | FY2038F | FY2039F |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Profit after tax | — | — | 9,388 | 8,436 | 8,701 | 9,288 | 9,786 | 8,387 | 9,011 | 9,394 | 9,243 | 4,502 | 4,560 | 4,684 | 4,716 | 4,344 |
| Depreciation | — | — | 3,394 | 3,394 | 3,294 | 3,294 | 3,129 | 2,197 | 2,197 | 2,197 | 2,053 | 600 | 600 | 600 | 600 | 282 |
| Change in BPDB receivable | — | — | -4,856 | 1,218 | 4,645 | 3,869 | 341 | 1,665 | 267 | 0 | 692 | 4,879 | 2,113 | 0 | 0 | 0 |
| Change in other working capital | — | — | -1,110 | 0 | -113 | -113 | -22 | -51 | -73 | 0 | -104 | -473 | -577 | 0 | 0 | -183 |
| Cash flow from operations | — | 10,788 | 6,816 | 13,048 | 16,527 | 16,338 | 13,234 | 12,197 | 11,402 | 11,591 | 11,883 | 9,508 | 6,695 | 5,284 | 5,316 | 4,444 |
| Capex | — | — | -335 | -200 | -200 | -200 | -200 | -200 | -200 | -200 | -200 | -200 | -200 | -200 | -200 | -200 |
| Related-party loans, net | — | — | 2,813 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Dividends paid (owners and NCI) | — | — | -3,856 | -3,560 | -3,401 | -3,507 | -5,560 | -5,802 | -5,032 | -5,407 | -5,637 | -5,546 | -4,502 | -4,560 | -4,684 | -4,716 |
| Change in debt | — | — | -5,417 | -9,289 | -12,925 | -12,630 | -7,474 | -6,195 | -6,170 | -5,985 | -6,047 | -3,763 | -1,993 | -524 | -433 | 472 |
| Net change in cash | — | — | 21 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Operating cash flow per share (BDT) | — | 18.61 | 11.76 | 22.51 | 28.51 | 28.18 | 22.83 | 21.04 | 19.67 | 20.00 | 20.50 | 16.40 | 11.55 | 9.11 | 9.17 | 7.67 |
Ratios
| Ratio | FY2024A | FY2025A | FY2026E | FY2027F | FY2028F | FY2029F | FY2030F | FY2031F | FY2032F | FY2033F | FY2034F | FY2035F | FY2036F | FY2037F | FY2038F | FY2039F |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Capacity payments / revenue | 30.8% | 29.8% | 37.0% | 36.9% | 36.6% | 37.7% | 36.7% | 29.4% | 30.0% | 30.0% | 29.1% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| Gross margin | 29.5% | 33.9% | 34.4% | 31.5% | 30.9% | 31.7% | 31.4% | 28.0% | 29.7% | 29.7% | 29.2% | 11.5% | 14.5% | 14.5% | 14.5% | 14.5% |
| EBITDA (BDT mn) | 13,330 | 16,573 | 14,247 | 12,865 | 12,135 | 12,084 | 11,633 | 8,837 | 9,077 | 9,077 | 8,410 | 1,928 | 1,665 | 1,665 | 1,665 | 751 |
| BPDB receivable days | — | — | 300 | 300 | 240 | 180 | 180 | 180 | 180 | 180 | 180 | 180 | 0 | 0 | 0 | 0 |
| ROE (owners) | — | 31.0% | 20.3% | 16.4% | 15.4% | 14.9% | 14.6% | 12.1% | 12.4% | 12.2% | 11.5% | 5.5% | 5.6% | 5.7% | 5.8% | 5.3% |
| Payout (DPS / EPS) | 42.8% | 31.5% | 37.6% | 40.0% | 40.0% | 60.0% | 60.0% | 60.0% | 60.0% | 60.0% | 60.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% |
| Net debt / owners' equity | — | 23.6% | 9.7% | -8.7% | -30.0% | -47.1% | -55.1% | -61.9% | -66.8% | -71.0% | -75.3% | -80.8% | -83.2% | -83.7% | -84.2% | -84.0% |
| P/E at BDT 112.2 | 8.0x | 5.4x | 7.0x | 7.8x | 7.6x | 7.1x | 6.7x | 7.8x | 7.2x | 6.9x | 7.0x | 14.4x | 14.3x | 13.9x | 13.8x | 15.0x |
| P/B at BDT 112.2 | 1.9x | 1.5x | 1.3x | 1.2x | 1.1x | 1.0x | 1.0x | 0.9x | 0.9x | 0.8x | 0.8x | 0.8x | 0.8x | 0.8x | 0.8x | 0.8x |
| Dividend yield at BDT 112.2 | 5.3% | 5.8% | 5.3% | 5.1% | 5.3% | 8.4% | 8.9% | 7.7% | 8.3% | 8.7% | 8.5% | 6.9% | 7.0% | 7.2% | 7.3% | 6.7% |
Quarterly
| EPS, BDT (consolidated) | 1Q25A | 2Q25A | 3Q25A | 4Q25A | 1Q26A | 2Q26A | 3Q26A | 4Q26A |
|---|---|---|---|---|---|---|---|---|
| EPS (BDT) | 7.13 | 4.98 | 7.21 | 1.34 | 4.94 | 5.06 | 4.69 | 1.25 |
| NOCFPS, cumulative (BDT) | 1.85 | 7.55 | 15.17 | 18.61 | 6.62 | 9.57 | 7.22 | 12.00 |
WACC
| Cost of equity input | Value |
|---|---|
| Risk-free rate: 10-yr T-bond cut-off, 25-Oct-2026 | 9.3% |
| Beta, raw (104 weekly returns vs DSEX) | 0.87 |
| Beta, Blume-adjusted (0.67 x raw + 0.33) | 0.91 |
| Equity risk premium | 7.0% |
| Cost of equity | 15.6% |
Valuation
| BDT mn unless stated | FY2027F | FY2028F | FY2029F | FY2030F | FY2031F | FY2032F | FY2033F | FY2034F | FY2035F | FY2036F | FY2037F | FY2038F | FY2039F |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Years from valuation date (31-Oct-2026, mid-year) | 0.17 | 1.17 | 2.17 | 3.17 | 4.17 | 5.17 | 6.17 | 7.17 | 8.17 | 9.17 | 10.17 | 11.17 | 12.17 |
| Discount factor at cost of equity | 0.98 | 0.84 | 0.73 | 0.63 | 0.55 | 0.47 | 0.41 | 0.35 | 0.30 | 0.26 | 0.23 | 0.20 | 0.17 |
| EBITDA attributable, G1 HFO (Anwara, Jamalpur) | 7,412 | 7,412 | 7,412 | 7,412 | 7,412 | 7,412 | 7,412 | 6,745 | 263 | 0 | 0 | 0 | 0 |
| EBITDA attributable, G2 small gas (Ashuganj 53, Sylhet 28) | 781 | 51 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| EBITDA attributable, G3 UAEL 195 MW (92.4%) | 2,778 | 2,778 | 2,778 | 2,362 | -221 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| EBITDA attributable, G4 EPZ (DEPZ, CEPZ) | 1,725 | 1,725 | 1,725 | 1,725 | 1,725 | 1,725 | 1,725 | 1,725 | 1,725 | 1,725 | 1,725 | 1,725 | 811 |
| Less tax, capex and G&A (group) | -601 | -618 | -783 | -783 | -783 | -783 | -783 | -783 | -870 | -783 | -783 | -783 | -585 |
| Working capital released (+) or tied up (-) | 1,218 | 4,532 | 3,756 | 319 | 1,614 | 194 | 0 | 588 | 4,406 | 1,536 | 0 | 0 | -183 |
| Free cash flow to the firm, attributable | 13,313 | 15,881 | 14,889 | 11,035 | 9,747 | 8,548 | 8,354 | 8,275 | 5,524 | 2,478 | 942 | 942 | 43 |
| PV, G1 HFO (Anwara, Jamalpur) | 7,231 | 6,253 | 5,407 | 4,676 | 4,043 | 3,496 | 3,023 | 2,379 | 80 | 0 | 0 | 0 | 0 |
| PV, G2 small gas (Ashuganj 53, Sylhet 28) | 762 | 43 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| PV, G3 UAEL 195 MW (92.4%) | 2,711 | 2,344 | 2,027 | 1,490 | -121 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| PV, G4 EPZ (DEPZ, CEPZ) | 1,683 | 1,455 | 1,258 | 1,088 | 941 | 814 | 703 | 608 | 526 | 455 | 393 | 340 | 138 |
| PV, tax/capex/G&A and working capital | 602 | 3,302 | 2,169 | -292 | 453 | -278 | -319 | -69 | 1,078 | 199 | -178 | -154 | -131 |
| Bridge (value in first column) | |||||||||||||
| G1 HFO (Anwara, Jamalpur) | 36,590 | — | — | — | — | — | — | — | — | — | — | — | — |
| G2 small gas (Ashuganj 53, Sylhet 28) | 805 | — | — | — | — | — | — | — | — | — | — | — | — |
| G3 UAEL 195 MW (92.4%) | 8,450 | — | — | — | — | — | — | — | — | — | — | — | — |
| G4 EPZ (DEPZ, CEPZ) | 10,402 | — | — | — | — | — | — | — | — | — | — | — | — |
| Tax, capex, G&A and working capital | 6,381 | — | — | — | — | — | — | — | — | — | — | — | — |
| of which post-PPA cash flows (renewal/NENP years) | 3 | — | — | — | — | — | — | — | — | — | — | — | — |
| Residual working capital at FY2039, collected FY2040 | -24 | — | — | — | — | — | — | — | — | — | — | — | — |
| Less net debt, Jun-26E | -4,679 | — | — | — | — | — | — | — | — | — | — | — | — |
| Related-party balances, net, after sponsor haircut | 4,411 | — | — | — | — | — | — | — | — | — | — | — | — |
| Leviathan Global work in progress x recovery x 75% | 474 | — | — | — | — | — | — | — | — | — | — | — | — |
| Captive-rate gas claim x probability | -4,344 | — | — | — | — | — | — | — | — | — | — | — | — |
| Equity value (BDT mn) | 58,467 | — | — | — | — | — | — | — | — | — | — | — | — |
| Contract-by-contract DCF per share (BDT) | 100.9 | — | — | — | — | — | — | — | — | — | — | — | — |
| DDM per share: PV of DPS FY27F-FY39F + book left at FY2039 less claim | 67.9 | — | — | — | — | — | — | — | — | — | — | — | — |
| Fair value (80% DCF + 20% DDM), BDT per share | 94.3 | — | — | — | — | — | — | — | — | — | — | — | — |
| Post-PPA share of equity value | 0.0% | — | — | — | — | — | — | — | — | — | — | — | — |
| Implied P/E on FY2027F EPS | 6.6x | — | — | — | — | — | — | — | — | — | — | — | — |
| Implied P/B on FY2026E NAV | 1.1x | — | — | — | — | — | — | — | — | — | — | — | — |
| Implied dividend yield on FY2027F DPS | 6.1% | — | — | — | — | — | — | — | — | — | — | — | — |
| Implied EV per operating MW (BDT mn) | 74.7 | — | — | — | — | — | — | — | — | — | — | — | — |
| Scenario results (recalculated with the selector at 1, 2, 3) | |||||||||||||
| Fair value, bear (BDT per share) | 79.7 | — | — | — | — | — | — | — | — | — | — | — | — |
| Fair value, base (BDT per share) | 94.3 | — | — | — | — | — | — | — | — | — | — | — | — |
| Fair value, bull (BDT per share) | 117.8 | — | — | — | — | — | — | — | — | — | — | — | — |
| Probability-weighted (30% bear / 50% base / 20% bull) | 94.6 | — | — | — | — | — | — | — | — | — | — | — | — |
Sensitivity
| Grid (row input x column input) | Col 1 | Col 2 | Col 3 | Col 4 | Col 5 |
|---|---|---|---|---|---|
| Grid A: fair value (BDT/share); rows = cost of equity, columns = post-PPA basis | |||||
| Cost of equity \ post-PPA basis | Zero | NENP 1 yr | NENP 2 yrs | Renewal 30% | Renewal 50% |
| Ke 13.6% | 100.6 | 100.4 | 100.2 | 106.1 | 109.4 |
| Ke 14.6% | 97.5 | 97.2 | 97.0 | 102.5 | 105.5 |
| Ke 15.6% | 94.5 | 94.3 | 94.1 | 99.1 | 101.9 |
| Ke 16.6% | 91.7 | 91.5 | 91.3 | 95.9 | 98.6 |
| Ke 17.6% | 89.1 | 88.9 | 88.7 | 93.0 | 95.4 |
| Rule 21 (4-Nov-2026): only the cost-of-equity x post-PPA basis grid is kept; the contract DCF has no perpetuity, so the post-PPA basis is its terminal-value input. EPS grid and one-at-a-time risk shocks removed. | |||||
Unit economics
| Item | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | Source / page |
|---|---|---|---|---|---|---|
| Sales, DEPZ 82 MW (MWh) | 471,911 | 459,910 | 294,998 | 345,609 | 350,073 | AR25 p.124-125 (operational highlights) |
| Sales, CEPZ 72 MW (MWh) | 513,995 | 512,818 | 410,440 | 428,285 | 485,583 | AR25 p.124-125 |
| Sales, Sylhet 28 MW (MWh) | 146,416 | 173,231 | 93,190 | 139,228 | 110,015 | AR25 p.124-125 (UEL 28 MW) |
| Sales, Ashuganj 53 MW (MWh) | 0 | 0 | 0 | 0 | 0 | AR25 p.124-125 (printed '-') |
| Sales, UAEL 195 MW (MWh) | 145,638 | 259,236 | 357,465 | 231,047 | 847,620 | AR25 p.124-125 |
| Sales, Jamalpur 115 MW HFO (MWh) | 538,472 | 627,954 | 505,754 | 343,670 | 458,543 | AR25 p.124-125 (UJPL) |
| Sales, Anwara 300 MW HFO (MWh) | 1,195,998 | 1,678,144 | 1,016,880 | 502,148 | 210,586 | AR25 p.124-125 (UAnPL) |
| Total electricity sold (MWh, formula) | 3,012,430 | 3,711,293 | 2,678,727 | 1,989,987 | 2,462,420 | Formula |
| Electricity revenue (BDT mn) | 30,540 | 49,387 | 41,192 | 34,541 | 38,739 | Revenue note: AR22 p.164 (FY2021-22); AR23 p.163 (FY2023); AR24 p.177 (FY2024); FS25 p.37 (FY2025) |
| Capacity payment (BDT mn) | 8,362 | 8,515 | 10,130 | 10,718 | 11,639 | same pages |
| Energy + fuel + O&M payment (BDT mn) | 21,734 | 40,378 | 29,460 | 22,495 | 25,632 | same pages; FY2024-25 = fuel + O&M + energy as printed separately (FY2021-23 printed as one 'Energy payment' line) |
| Supplemental + true-up bills (BDT mn) | 445 | 493 | 1,602 | 1,296 | 1,467 | same pages |
| Electricity revenue per kWh sold (BDT, derived) | 10 | 13 | 15 | 17 | 16 | Formula |
| Capacity payment per kWh sold (BDT, derived) | 3 | 2 | 4 | 5 | 5 | Formula |
| Energy, fuel and O&M per kWh sold (BDT, derived) | 7 | 11 | 11 | 11 | 10 | Formula |
| HFO consumed, Jamalpur (MT) | 110,629 | 129,935 | 105,477 | 65,000 | 107,653 | AR25 p.125 |
| HFO consumed, Anwara (MT) | 235,874 | 337,954 | 207,601 | 104,824 | 44,828 | AR25 p.125 |
| HFO per MWh sold, HFO plants (MT, derived) | 0 | 0 | 0 | 0 | 0 | Formula |
| Gas use, UAEL (m3 per kWh) | 0 | 0 | 0 | 0 | 0 | AR25 p.125 |
| Gas use, DEPZ (m3 per kWh) | 0 | 0 | 0 | 0 | 0 | AR25 p.125 |
| Gas use, CEPZ (m3 per kWh) | 0 | 0 | 0 | 0 | 0 | AR25 p.125 |
| Power-category gas tariff at end-June (BDT/m3) | 4 | — | 14 | 16 | 16 | regulated/berc_gas_power.csv: BERC order 2019/02; SRO 14-Ain/2023; SRO 105-Ain/2024. FY2022: BERC order of 4-Jun-2022 not in our data |
| Captive gas tariff at end-June (BDT/m3) | 14 | — | 30 | 32 | 32 | regulated/berc_gas_captive.csv: BERC order 2019/02; SRO 14-Ain/2023; SRO 40-Ain/2024 (30.75 Feb-2024); SRO 105-Ain/2024 (31.50 May-2024). FY2022 not in our data |
| UAEL gas cost per kWh at power tariff (BDT, derived) | 1 | — | 3 | 4 | 4 | Formula: m3/kWh x tariff at end-June |
| EPZ gas cost per kWh at captive tariff (BDT, derived, DEPZ) | 4 | — | 8 | 9 | 9 | Formula: m3/kWh x captive tariff at end-June |
| Group utilisation (%) | — | — | — | 0 | 0 | AR25 p.47 (FY2024-25 only) |
| AR25 = UPGDCL_ANNUAL_2025_3 (full Annual Report 2024-25); FS25 = UPGDCL_ANNUAL_2025; AR22/23/24 = UPGDCL_ANNUAL_2022_3/2023_3/2024_3. PDF page numbers. | ||||||
| Revenue per kWh mixes plants with different contracts; plant-wise tariffs are not printed (searched: revenue notes, directors' reports AR22-AR25). | ||||||
| Gas-cost rows apply the official tariff to printed gas use; the company's actual gas bill per plant is not printed. | ||||||
Revenue by customer
| BDT mn | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | Source / page |
|---|---|---|---|---|---|---|
| BPDB | 24,323 | 43,096 | 36,057 | 27,848 | 31,356 | AR22 p.164; AR24 p.177; FS25 p.37 |
| BEPZA | 4,351 | 4,536 | 3,882 | 4,582 | 5,322 | same pages (FY2025 BEPZA read from page as 5,321,600,750) |
| BREB | 580 | 575 | 214 | 704 | 824 | same pages |
| Private customers | 1,286 | 1,179 | 1,040 | 1,407 | 1,237 | same pages |
| Electricity revenue (formula) | 30,540 | 49,387 | 41,192 | 34,541 | 38,739 | Formula; printed totals 30,540.10 / 49,386.53 / 41,192.20 / 34,541.24 / 38,738.94 |
| BPDB share of electricity revenue (derived) | 1 | 1 | 1 | 1 | 1 | Formula |
| Steam revenue | 40 | 49 | — | 239 | 346 | AR22 p.164; FS25 p.37 (FY2023 steam not read) |
Related-party loans
| BDT mn | 9M FY2026 | 9M FY2025 | 31-Mar-2026 | 30-Jun-2025 | Source / page |
|---|---|---|---|---|---|
| UMPL: loan received from UMPL | -37,802 | -6,716 | — | — | Q3 FY26 p.35 |
| UMPL: loan given to UMPL | 16,147 | 4,906 | — | — | Q3 FY26 p.35 |
| UMPL: balance receivable/(payable) | — | — | -403 | 21,251 | Q3 FY26 p.35 |
| UECL: loan received from UECL | -3,237 | -13,417 | — | — | Q3 FY26 p.35 |
| UECL: loan given to UECL | 19,191 | 19,398 | — | — | Q3 FY26 p.35 |
| UECL: balance receivable/(payable) | — | — | 8,955 | -6,999 | Q3 FY26 p.35 |
| UAEL-UECL: loan received | -1,912 | -2,951 | — | — | Q3 FY26 p.35 (UAEL table) |
| UAEL-UECL: loan repaid | 2,424 | 7,260 | — | — | Q3 FY26 p.35 |
| UAEL-UECL: balance receivable | — | — | 1,390 | 777 | Q3 FY26 p.35; interest payable 101.19 printed for 9M FY2026 |
| Interest on related-party loan (consolidated finance income) | 72 | 578 | — | — | Q3 FY26 p.32 (separate: nil vs 577.89) |
| Interest on short- and long-term loans (finance cost) | 814 | 365 | — | — | Q3 FY26 p.32 |
| Interest on UPAS LC (finance cost) | 128 | 84 | — | — | Q3 FY26 p.32 |
| Net finance cost/(income), consolidated | 985 | 1 | — | — | Q3 FY26 p.32 |
| Separate-company table unless stated. 'No interest has been charged' on loans taken from related parties, except UAEL's payable to UECL (FS25 p.36). UAEL's receivable from UECL and UMPL balances with DEPZ/CEPZ are 'interest bearing loan and receivable on demand' (Q3 FY26 p.18); the rate is not printed. | |||||
Key drivers
| Series | FY2017 | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | Latest | Latest date | Source / URL |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Brent crude, FY average (USD/bbl) | 50 | 64 | 69 | 52 | 54 | 91 | 87 | 85 | 75 | 79 | 117 | 2026-09-01 | World Bank Pink Sheet, commodities/wb_crude_brent.csv |
| BDT per USD, FY average (BB) | 79 | 82 | 84 | 85 | 85 | 86 | 99 | 111 | 120 | 122 | 123 | 2026-09-01 | Bangladesh Bank, fx/bdt_usd_monthly_avg_bb.csv |
| BDT per USD, end-June (BB) | 81 | 84 | 84 | 85 | 85 | 93 | 106 | 118 | 123 | 123 | 123 | 2026-09-01 | Bangladesh Bank, fx/bdt_usd_monthly_eop_bb.csv |
| BB policy rate at end-June (% p.a.) | — | — | — | — | 5 | 6 | 6 | 8 | 10 | 10 | 10 | 2026-07-30 (last change) | Bangladesh Bank MPS / MPC, rates/bd_policy_rate_bb_history.csv (from 29-Jul-2020) |
| Scheduled banks' weighted average lending rate, end-June (% p.a.) | 10 | 10 | 10 | 8 | 7 | 7 | 7 | 12 | 12 | 12 | 12 | 2026-06-30 | BB Scheduled Banks Statistics Table-102, banks/bb_sbs_wavg_lending_rate.csv |
| DSEX at end-June | 5,656 | 5,405 | 5,422 | 3,989 | 6,150 | 6,377 | 6,344 | 5,328 | 4,838 | 5,763 | 5,334 | 2026-11-02 | market/dsex_daily.csv (AnalystBro chart_bars) |
| Bulk tariff to distributors at 132 kV, end-June (BDT/kWh) | — | — | — | 6 | 6 | 6 | 8 | 8 | 8 | 10 | 10 | 2026-06-01 | regulated/berc_elec_bulk_bpdb_132kv.csv: BERC order 2020/02; SRO 23-Ain/2023; SRO 41-Ain/2024; BERC notice 4-Jun-2026 (BERC notice 21-Nov-2022 not in our data) |
| Gas tariff, power category (IPP/rental), end-June (BDT/m3) | — | — | — | 4 | 4 | — | 14 | 16 | 16 | 16 | 16 | 2024-05-01 | regulated/berc_gas_power.csv: BERC order 2019/02; SRO 14-Ain/2023; SRO 40-Ain/2024; SRO 105-Ain/2024 (BERC order 4-Jun-2022 not in our data: FY2022 blank) |
| Gas tariff, captive power, end-June (BDT/m3) | — | — | — | 14 | 14 | — | 30 | 32 | 32 | 32 | 32 | 2025-04-13 | regulated/berc_gas_captive.csv: same orders; BERC notice 13-Apr-2025 (existing customers unchanged at 31.50) |
| Furnace oil, two points on different bases (regulated/bpc_furnace_oil.csv): BERC price for BPC-supplied HFO to power plants BDT 96.86/litre from 6-Sep-2026; BPC retail selling price BDT 108.78/litre from 1-Oct-2026. Earlier series not in our data at 4-Nov-2026. | |||||||||||||
| UPGDCL's HFO route: finance cost carries 'Interest on UPAS LC' (FS25 note 36, AR25 p.176), i.e. import LCs; the supplier is not named in the notes read. | |||||||||||||
| Latest dates as in each CSV on 4-Nov-2026. | |||||||||||||
DSE events 2021-26
| Post date | Disclosure (DSE news archive) |
|---|---|
| 30-Dec-2021 | CCGP approved a further 5-year extension of the 53 MW Ashuganj plant (UEL) |
| 03-Apr-2022 | UEL signed the renewal/extension of the 53 MW PPA with BPDB for 5 years from the date of operation |
| 21-Sep-2022 | EGM on 9-Nov-2022 to approve the amalgamation scheme (High Court order 8-Sep-2022, Matter No. 275 of 2022) |
| 30-Oct-2022 | FY2022: 'huge foreign exchange loss for the purchase of HFO'; NOCFPS down on BPDB payment delays |
| 14-Nov-2022 | Emphasis of matter: gas-claim case before the Appellate Division |
| 02-May-2023 | Subsidiary interim dividends: UAnPL BDT 5,550m; UEL BDT 3,225m |
| 02-May-2023 | 9M FY2023: EPS down 'due to increase in gas price for IPP customers' |
| 20-Aug-2023 | Court judgement sanctioning the amalgamation scheme |
| 21-Nov-2023 | Q1 FY2024: EPS down on 'exchange loss in foreign currency transactions' and higher borrowing cost |
| 31-Jan-2024 | H1 FY2024: BDT 11,131m paid to suppliers; NOCFPS down |
| 16-Jul-2024 | Company Secretary appointed (Elias Howlader) |
| 29-Oct-2024 | FY2024: 60% cash; EPS 14.01, NOCFPS (0.88) |
| 04-Nov-2024 | UAEL declared 35% cash (BDT 1,295m) |
| 08-Dec-2024 | ECRL affirmed AAA / ST-1, stable |
| 02-Feb-2025 | H1 FY2025: EPS up on 'increase in electricity bulk tariffs' |
| 04-Feb-2025 | Kutubuddin Akhter Rashid appointed Managing Director |
| 04-May-2025 | Titas disconnected gas to the 82 MW DEPZ plant on 28-Apr-2025 over the captive-rate claim |
| 12-May-2025 | DEPZ gas supply restored; plant fully operational |
| 27-Oct-2025 | FY2025: 65% cash; EPS 20.66 on 'higher production, higher bulk tariff, stable foreign exchange rates, and lower finance costs' |
| 29-Oct-2025 | UAEL declared 15% cash |
| 23-Nov-2025 | Q1 FY2026: EPS down as supplemental revenue 'arising from the bulk electricity tariff adjustment relating to prior gas price increases' was booked a year earlier |
| 14-Dec-2025 | ECRL affirmed AAA / ST-1, stable |
| 16-Mar-2026 | Maj. Gen. Abul Kalam Mohammad Ziaur Rahman appointed Chairman |
| 30-Apr-2026 | Q3 FY2026: EPS down on 'lower production levels and the absence of supplemental revenue' |
| 25-Oct-2026 | UAEL declared 60% cash |
| 28-Oct-2026 | FY2026: 60% cash; EPS 15.94, NAV 83.33, NOCFPS 12.00; AGM 23-Dec-2026 |
| Source: DSE news archive for UPGDCL (stored DSE announcements, old.dsebd.org windows of 2 years or less), scratch/dse_news_key.md. | |
FAQ
- What is United Power's fair value range?
- Our fair value range is BDT 79.7-117.8 per share, base BDT 94.3 (probability-weighted 94.6), from a contract-by-contract DCF to each PPA end (80%) and a DDM (20%) at a 15.6% cost of equity.
- When do UPGDCL's power purchase agreements expire?
- Ashuganj 53 MW and Sylhet 28 MW in 2027, UAEL 195 MW in 2030, Anwara 300 MW and Jamalpur 115 MW in 2034, and the EPZ plants in 2038 (Dhaka) and 2039 (Chattogram), per the company's plant table.
- How much does BPDB owe United Power?
- BDT 20.7bn on 31-Mar-2026, nine to ten months of undisputed invoices, up from BDT 14.8bn in June 2025.
- What were UPGDCL's FY2026 earnings and dividend?
- The DSE announcement of 28-Oct-2026 gives consolidated EPS of BDT 15.94, NAV per share of BDT 83.33 and a 60% cash dividend (BDT 6.00); audited statements are not yet filed.
Sources
- United Power Generation & Distribution Co. Ltd. audited consolidated financial statements, year to 30-Jun-2025 · link · accessed 2026-10-31
- United Power Generation & Distribution Co. Ltd. un-audited financial statements, nine months to 31-Mar-2026 · link · accessed 2026-10-31
- DSE news archive for UPGDCL (FY2026 results and dividend 28-Oct-2026; quarterly EPS, NAV and NOCFPS disclosures 2024-2026; UAEL dividend 25-Oct-2026) · link · accessed 2026-10-31
- AnalystBro market data: DSE prices for UPGDCL and DSEX (daily and weekly bars), 29-Oct-2026 · link · accessed 2026-10-31
- Bangladesh Bank treasury auction page: 10-year bond cut-off 9.268% on 25-Oct-2026 · link · accessed 2026-10-31
- United Power Generation & Distribution Co. Ltd. Annual Report 2024-25 (full report: directors' report, MD&A, five-year and operational highlights) · link · accessed 2026-10-31
- United Power Generation & Distribution Co. Ltd. Annual Report 2022-23 (MD&A, peer table) · link · accessed 2026-10-31
- The Financial Express, 'United Power lifts profit on deep cost cuts amid revenue slump' · link · accessed 2026-10-31
- The Financial Express, 'Listed private power producers face earnings pressure amid policy shift', 6-May-2026 · link · accessed 2026-10-31
- The Daily Star, 'Capacity payment terms must be renegotiated' · link · accessed 2026-10-31
- AnalystBro model for this report (model.xlsx: Assumptions, statements, Valuation, Sensitivity) · accessed 2026-10-31
- United Power Generation & Distribution Co. Ltd. Annual Report 2023-24 (directors' report, notes) · link · accessed 2026-11-04
- United Power Generation & Distribution Co. Ltd. Annual Report 2021-22 (revenue note) · link · accessed 2026-11-04
- DSE news archive for UPGDCL, Nov-2021 to Oct-2023 (stored DSE announcements) · link · accessed 2026-11-04
- DSE news archive for UPGDCL, Nov-2023 to Oct-2024 (stored DSE announcements) · link · accessed 2026-11-04
- Gas tariff orders, power and captive categories: BERC order 2019/02; Energy Division SRO 14-Ain/2023, SRO 40-Ain/2024 and SRO 105-Ain/2024; BERC notice 13-Apr-2025 · link · accessed 2026-11-04
- Bulk electricity tariff at 132 kV: BERC order 2020/02; Power Division SRO 23-Ain/2023 and SRO 41-Ain/2024; BERC notice 4-Jun-2026 · link · accessed 2026-11-04
- World Bank Pink Sheet (Brent, monthly) and Bangladesh Bank BDT/USD monthly series, to Sep-2026 · link · accessed 2026-11-04
- Bangladesh Bank policy rate (MPS / MPC notices from 29-Jul-2020) and Scheduled Banks Statistics Table-102 lending rate · link · accessed 2026-11-04
- BERC notice 6-Sep-2026 and BPC price page (furnace oil, BDT per litre) · link · accessed 2026-11-04
- Emerging Credit Rating Ltd, rating letter to UPGDCL, 14-Dec-2025 · link · accessed 2026-11-04
Revision history
- 04-Nov-2026: Summarised raw event/data tables; added chart findings; range BDT 79.7–118 (this version)
- 04-Nov-2026: range BDT 79.7–118
- 31-Oct-2026: range BDT 79.7–118
- 31-Oct-2026: range BDT 79.7–118
Disclaimer
This article is published by AnalystBro for information and education only. It is not investment, financial, legal or tax advice, not an offer or solicitation to buy or sell any security, and not a recommendation. It is based on company filings, official statistics and the sources cited, and was independently reviewed before publishing; it may still contain errors or omissions, and the data and estimates can be out of date. Fair values, forecasts and the model are estimates under stated assumptions, not predictions; past results don't indicate future returns.
AnalystBro, its owners and staff accept no responsibility or liability for any loss or damage arising from the use of, or reliance on, this article, its model or its data. Do your own research and consult a licensed adviser before making investment decisions. Any changes you make in the spreadsheet view stay in your browser and are your own.