Mir Akhter Hossain financial analysis: JV-funded growth, Tk 20.6bn debt and FY2026 EPS of -Tk 6.58 (Oct 2026)

Mir Akhter Hossain: a contractor earning mainly through joint ventures, with Tk 20.6bn of debt and an FY2026 loss

Own revenue halved to Tk 1.34bn in FY2025 while 89% of profit came from joint ventures funded by MAHL's borrowing. FY2026 EPS was -Tk 6.58 and no dividend was declared.

Company · Analysis · 04 Nov 2026 · FY2018-FY2025 annual (June) + 9M FY2026 (to 31-Mar-2026) + FY2026 DSE announcement · By AnalystBro Team · 17 min read · Updated 2 times

For information only, not investment advice. AnalystBro accepts no responsibility for decisions made on it. Full disclaimer.

Companies covered: BBS, DOMINAGE

Price (29-Oct-2026)Tk 25.0
52-week rangeTk 23.9 - 48.7
Market valueabout Tk 3.0bn
Shares120.77m
Sponsors / directors48.58%
NAV per share, 30-Jun-2026 (DSE)Tk 44.21
EPS FY2025 / FY2026Tk 1.72 / -Tk 6.58
Dividend FY2025 / FY202610.5% to non-sponsors / none
Borrowings, 31-Mar-2026Tk 21.6bn
Investment in JVs, 31-Mar-2026Tk 19.1bn
Credit rating (CRISL, 22-Apr-2026)A / ST-4

A road and rail contractor whose profit comes mostly from joint ventures, funded by Tk 20.6bn of borrowing; FY2026 EPS was -Tk 6.58

Updated 4-Nov-2026: added the business model and industry forces, cost-of-execution components FY2018-FY2025 beside steel-scrap, clinker, oil and taka series, eight years of printed cash flows (JV investment, loans, interest paid), policy and lending rates against the implied 13.1% gross cost of debt, JV accounting and inventory composition, the use of IPO proceeds, 2021-2024 DSE events, and answers on the FY2026 loss, interest recharge, depreciation, related-party loans, zero coupon bonds and the dividend.

What it is. Mir Akhter Hossain Limited (MAHL) is a Dhaka civil-engineering contractor that started as a partnership in 1968, became a private company in 1980 and listed on the Dhaka and Chittagong exchanges on 26-Jan-2021 [1 p.39]. It builds roads, bridges, highways, railway track and airport runways, and also does river dredging, gas-pad drilling and railway-sleeper manufacturing [1 p.39]. Its clients are mainly government bodies (it thanks RHD, BBA, LGED, BIWTA, CAAB and CDA) and a few private owners such as Chevron Bangladesh and Reliance Insurance [1 p.37] [1 p.124]. The directors' report says it was working on 16 projects in 2025 [1 p.39]. Its largest contracts are run through seven unincorporated joint ventures with Korean and Chinese contractors, booked as an investment of Tk 17,077m at 30-Jun-2025 [1 p.114].

Where it stands. Consolidated revenue fell 50.2% to Tk 1,339.6m in FY2025, the lowest in the eight years to FY2025, and net profit fell 31.0% to Tk 207.4m (EPS Tk 1.72) [1 p.51]. Of that profit, Tk 184.7m (89.1%) was MAHL's share of joint-venture profit and only Tk 22.7m came from its own contracts [1 p.51]. Borrowings (long-term loan, short-term loan and zero coupon bonds) reached Tk 20,606m against equity of Tk 6,220m [1 p.52]. For FY2026 the company announced on 27-Oct-2026 a consolidated EPS of -Tk 6.58, NAV per share of Tk 44.21 (Tk 51.51 a year earlier) and no dividend [7]. The nine-month accounts to March 2026 showed a profit of Tk 79.4m [3 p.3], so the June 2026 quarter carried a loss of about Tk 874m on our arithmetic (full-year EPS times 120.77m shares, less nine months); the audited FY2026 annual report is not yet in our corpus, so the cause of that loss is not known to us. The shares closed at Tk 25.0 on 29-Oct-2026 [10].

Strengths in the filings

  • Gross margin on its own contracts rose in every year from FY2018 to FY2025 and reached 31.4% in FY2025, the highest in the series (26.2% in FY2018).
  • Seven joint ventures with Korean and Chinese contractors (Samwhan, Halla, Seokwang, Henan Highway Engineering, CRCC, Wuhan Municipal, China CAMC) hold SASEC road, rail and airport contracts.
  • New awards after FY2025: an LGED contract of Tk 1,746m (NOA 29-Oct-2025, 24 months) and a Bangladesh Railway contract of Tk 1,999m signed on 3-Feb-2025.
  • Operating cash flow exceeded net profit in each of FY2022-FY2025 (3.9x to 5.4x).
  • A cash dividend was paid for every year from FY2021 to FY2025 (Tk 1.25 a share for FY2021-FY2023, Tk 1.00 for FY2024).

Weaknesses in the filings

  • Borrowings of Tk 20,606m were 3.3 times equity at 30-Jun-2025 and Tk 21,598m at 31-Mar-2026; bank loans carry 8.00%-15.50% interest and are secured by personal guarantees of all directors.
  • Gross interest of Tk 2,588.8m in FY2025 was 1.9 times revenue; 95.1% of it (Tk 2,461.2m) was charged to the joint ventures, and Tk 2,065.2m of that to one venture (Hego-Mir Akhter).
  • The joint ventures earned Tk 188.4m after tax on Tk 5,745.4m of revenue (3.3%), a 1.1% return on MAHL's average JV investment.
  • FY2026: EPS -Tk 6.58 and NAV per share down 14.2% to Tk 44.21; no dividend.
  • Qualified audit opinion for FY2025 (provident fund not audited); CRISL lowered the long-term rating from A+ to A and the short-term rating from ST-3 to ST-4 (22-Apr-2026); BSEC refused a Tk 2,500m preference-share issue meant to refinance loans (19-Jun-2025).

Where shareholder returns come from. Three lines decide the result. First, contract revenue and its gross margin: MAHL earns 26%-31% gross on its own work, but revenue has swung between Tk 1,340m and Tk 4,267m since FY2018 [2 p.42] [1 p.51]. Second, the joint ventures: their profit share was 68%-89% of net profit in every year since FY2018 [15], and the capital tied up in them grew from Tk 3,725m to Tk 17,077m [2 p.43] [2 p.44] [1 p.52]. Third, interest: MAHL borrows in its own name and passes most of the interest to the ventures, so the cost sits inside the ventures' accounts and reaches MAHL's profit through its JV share [1 p.126] [1 p.112]. Cash returned to shareholders has been modest: Tk 1.00-1.25 a share for FY2021-FY2024, then 10.5% paid to non-sponsor shareholders only for FY2025, and nothing for FY2026 [7].

  • What was behind the June 2026 quarter loss of about Tk 874m? Signpost: the FY2026 audited annual report and auditor's opinion, ahead of the AGM on 23-Dec-2026.
  • Hego-Mir Akhter in FY2025: Tk 8,155m invested, Tk 2,065m of interest charged, MAHL share of PAT Tk 156.9m. Signpost: note 5.1, note 29 and note 31 of the FY2026 report.
  • How is the Tk 650.8m of zero coupon bonds (four-year bonds issued in February 2023) being repaid? Signpost: the bond balance in the Q2 FY2027 accounts (late Jan-2027, inferred).
  • Do the new LGED and railway contracts lift own-contract revenue from the FY2025 level of Tk 1,336m? Signpost: Q1 FY2027 revenue (board meeting about mid-Nov-2026, inferred).
  • Is the provident-fund audit behind the FY2025 qualification complete? Signpost: the FY2026 auditor's report.

Own contracts plus seven joint ventures: Tk 1.3bn of own revenue in FY2025 against Tk 5.7bn of JV revenue

How the money is made. MAHL bids for civil works, mostly public contracts funded by the Annual Development Programme and donors such as the Asian Development Bank (the Sylhet-Chhatak railway package is under ADB Loan No. 4305-BAN) [7]. Work it wins alone is booked as its own revenue. Revenue is recognised over time with an output method, treating each contract as a single performance obligation [1 p.112]. The company reports one business and geographic segment [1 p.130]. Bigger contracts are run through joint ventures that the notes describe as 'partnership at will' set up for a particular contract [1 p.115]; MAHL books its capital in them as 'Investment in Joint Venture' and its share of their after-tax profit as a separate line [1 p.114] [1 p.127].

Business model in one paragraph. MAHL sells civil-construction work (roads, bridges, rail, runways, dredging) under contracts; it reports one segment and prints revenue only by project, with 11 projects in FY2025 [1 p.124] [1 p.130]. Its buyers are mostly government bodies (RHD, BBA, LGED, BIWTA, CAAB, CDA, Bangladesh Railway) plus a few private owners such as Chevron Bangladesh and Reliance Insurance [1 p.37] [1 p.124]. It earns a contract margin on its own work and a profit share from seven joint ventures; revenue is recognised over time by an output method [1 p.112]. Its inputs are 'rod, cement, sand, stone, files, bricks, pipes, electrical goods etc.' [1 p.110], with stone chips bought as 'PAKUR STONE CHIPS' on deferred LC [1 p.122], plus its own equipment fleet (PPE Tk 4,019m) [1 p.52]. It is funded mainly by loans of Tk 19,955m including the current portion (Tk 18,254m from banks and Tk 1,701m from group companies) and zero coupon bonds (Tk 650.8m) against equity of Tk 6,220m [1 p.120] [1 p.122] [1 p.52]. It is controlled by the sponsor family: sponsors and directors hold 48.58%, Mir Nasir Hossain is managing director, and the directors personally guarantee the bank loans [1 p.118] [1 p.131] [1 p.121]. The filings print no tonnage, unit price or order-book figure; there is no volume-times-price split (searched notes 9, 25, 26 and the directors' report).

Industry forces, from the filings. Rivalry: large contracts are let by international competitive bidding, and MAHL bids with Korean and Chinese partners [1 p.34]; it prints no market share. Buyers: government agencies set terms and hold retention money (Tk 567.0m at June 2025) [1 p.116]; tax is deducted at source from every contract receipt [1 p.127]. Suppliers: no supplier concentration is disclosed; stone is imported on deferred LC [1 p.122]. Entry barriers: the directors list the 'requirement to scale up to bid for large construction projects solely' in their SWOT table, which also lists 'increasing government preference for local contractors' [6 p.45]. Supplier and cost threats in the same SWOT: 'unforeseen increase rise labor and material costs', 'substantial rise in finance cost' and 'adverse movement in foreign exchange rate' [6 p.45]. Substitutes: none disclosed.

Exhibit 1Profit has come mainly from the joint ventures since FY2018
Profit has come mainly from the joint ventures since FY2018. Share of JV profit was Tk 184.7 mn in FY2025, against Tk 22.7 mn of profit from own construction.

Share of JV profit was Tk 184.7 mn in FY2025, against Tk 22.7 mn of profit from own construction.

Source: [2 p.42] [1 p.51]; model [15]

The joint ventures. The seven ventures at 30-Jun-2025 were Hego-Mir Akhter (with Henan Highway Engineering Group, China; Tk 8,155m invested), Samwhan-Mir Akhter (Samwhan Corporation, Korea; Tk 3,811m), Mir Akhter-WMCG (Wuhan Municipal Construction Group; Tk 1,691m), Halla-Mir Akhter (Tk 1,513m), CRCC-MAHL (China Railway Construction Bridge Engineering Bureau; Tk 1,178m), Mir Akhter-CAMCE (China CAMC Engineering; Tk 638m) and Halla-MAH-Seokwang (Tk 90m) [1 p.114]. Hego-Mir Akhter holds the SASEC road packages: the Bangabandhu Bridge (west)-Hatikamrul four-lane road (19.80 km) and three lots of the Dhaka-Sylhet N2 four-laning [1 p.114] [1 p.115]. CRCC-MAHL builds the Madhukhali-Magura broad-gauge rail line, Mir Akhter-CAMCE the Shah Amanat airport runway, Halla-MAH-Seokwang the Cox's Bazar airport works [1 p.114] [1 p.115].

Exhibit 2Investment in the seven joint ventures, 30-Jun-2025
Tk mnInvestment FY2024Investment FY2025JV revenue FY2025MAHL share of JV PAT FY2025
Hego-Mir Akhter5,152.78,155.34,470.7156.9
Samwhan-Mir Akhter3,519.23,811.5605.119.4
Mir Akhter-WMCG1,976.31,691.494.82.9
Halla-Mir Akhter1,925.71,512.7262.61.7
CRCC-MAHL1,263.21,177.9280.85.4
Mir Akhter-CAMCE713.9638.231.40.4
Halla-MAH-Seokwang582.090.20.0-2.0
Total15,133.117,077.35,745.4184.7
Source: Note 5.1 [1 p.114]; JV results note 31 [1 p.127]

Own contracts. In FY2025 standalone revenue of Tk 1,336.4m came from 11 projects. The largest were the Jamuna Rail Bridge packages WD-I and WD-II (Tk 489.0m together), the Sylhet-Chhatak railway rehabilitation (Tk 234.5m, new in FY2025), Chevron Bangladesh Block Twelve (Tk 203.2m, down from Tk 710.2m) and RCCDRF (Tk 114.0m, down from Tk 308.3m) [1 p.124]. The two Jamuna Rail Bridge packages, Sylhet-Chhatak and Chevron made up 69.3% of standalone revenue in FY2025 [15]. The company also owns a stockbroker, Mir Securities Limited (99.75%), which began trading in July 2022 and added Tk 3.2m of revenue in FY2025 [1 p.43] [1 p.124].

Exhibit 3Standalone revenue by project: four of the five largest fell in FY2025
Tk mnFY2024FY2025Change
Jamuna Rail Bridge WD-I424.6318.5-0.2
Sylhet-Chhatak railway (SCRP)0.0234.5—
Chevron Bangladesh Block Twelve710.2203.2-0.7
Jamuna Rail Bridge WD-II379.7170.4-0.6
RCCDRF308.3114.0-0.6
Munshiganj Bridge (MSBP)409.590.3-0.8
Other projects (six in FY2024, five in FY2025)450.9205.4-0.5
Standalone revenue2,683.21,336.4-0.5
Source: Note 25 [1 p.124]

Equipment. The January 2021 IPO raised Tk 1,250m. The prospectus plan put Tk 400m to bank-loan repayment and Tk 35m to issue costs, both spent by June 2021, and the rest to equipment, an aggregate plant, an asphalt plant, a batching plant and a workshop [4 p.33]. The board called an EGM for 10-Mar-2022 to amend the plan, and the FY2023 utilisation table is headed 'as per amended allocation approved in EGM & BSEC' [5 p.33]; separately the board proposed a further amendment on 14-Nov-2022 for the 42nd AGM [18] [2 p.5]. By 30-Jun-2023 Tk 995.2m had been used and Tk 254.6m was unused under the amended allocation (dump trucks, long-boom excavators, cranes, scaffolding, barges and similar) [5 p.33]. The auditor's IPO utilisation report (FAMES & R, 2023) states that 'The expenses/utilization of Taka 1,250,029,598 of IPO proceeds have been completed' and that the utilisation 'has been made in line with the provision of Initial Public Offering (IPO) documents' [26 p.7]. The FY2024 and FY2025 reports say only that the equipment was procured and is in use [6 p.34] [1 p.42]. Property, plant and equipment was Tk 4,019m at 30-Jun-2025, 14.8% of total assets [1 p.52], and depreciation of Tk 548.2m was charged in FY2025 [1 p.129], of which Tk 103.4m sat in the cost of execution [1 p.125]. The accounting policy says 'Depreciation has been allocated to the different projects on the basis of uses of the assets' [1 p.107]; the notes do not show how much of the other Tk 444.8m went to joint-venture projects or into work in process (gap). The cash-flow reconciliation adds back the full Tk 548.2m [1 p.129]. There was no capital expenditure commitment at 30-Jun-2025 [1 p.130].

Public road, rail and airport budgets set demand; MAHL reports no listed construction peer

Demand. MAHL's work depends on government capital spending. The directors' report cites FY2025-26 development allocations of Tk 38,496 crore for the roads and highways division, Tk 6,505 crore for the bridges division and Tk 2,455 crore for civil aviation and tourism, against a total Annual Development Programme of Tk 2,65,000 crore for FY2024-25 [1 p.39]. Management said that political instability 'postponed infrastructure development and halted the supply chain system' and named 'rising material costs labor shortages, high interest and political instability' as the pressures on margins in FY2025 [1 p.36]. It describes MAHL as 'amongst the top 3 organizations in terms of capacity' in the sector [1 p.39]; we have no independent market-share data (gap).

Official series beside the company. Actual ADP spending by the roads, bridges and railway ministries (IMED) is not in our data at 4-Nov-2026 (gap). Private-sector credit growth slowed from 13.66% (June 2022) to 6.49% (June 2025) and 4.75% (August 2026), and CPI inflation was 8.34% in September 2026 [23]. The DSEX closed at 4,838 at end-June 2025 and 5,334 on 2-Nov-2026 [24].

Who it competes with. Large road and rail contracts in Bangladesh are usually let in international competitive bidding, which is why MAHL partners with foreign contractors; its listed partners include Samwhan, Seokwang and Halla of Korea, Henan Highway Engineering, CRCC, Wuhan Municipal and China CAMC of China, Sadeem Al Kuwait, and Japanese contractors such as Obayashi, Shimizu, Taisei and TOA [1 p.34]. MAHL's own management discussion states that it is the only company in the construction sector listed on the Dhaka and Chittagong exchanges, so it cannot compare its results with listed peers [1 p.37]. For a peer table we therefore use the nearest listed engineering contractors in our sector format, the pre-engineered steel-building makers Bangladesh Building Systems (BBS) and Dominage Steel Building Systems, from their own FY2025 statements.

Exhibit 4Nearest listed peers, FY2025 (own filings, each company's printed labels)
FY2025, Tk mnMir Akhter (consolidated)BBSDominage
Revenue ('Revenue' / 'Revenue, net' / 'Revenue')1,339.6592.9189.6
Gross profit420.5122.638.9
Finance cost in P&L ('Financial Expenses' / 'Finance Cost' / 'Financial Expenses')127.6159.911.6
Profit after tax207.4-96.55.1
Total borrowings20,606.21,134.578.4
Gross margin31.4%20.7%20.5%
Finance cost / revenue9.5%27.0%6.1%
Debt / equity (x)3.3x0.7x0.0x
ROE (average equity)3.4%-5.0%0.3%

Notes to the peer table: all three have June year-ends and audited FY2025 statements. MAHL's finance cost is after Tk 2,461.2m was charged to joint-venture partners [1 p.126]; its profit includes Tk 184.7m of JV profit. Finance costs are as charged in each P&L: MAHL's is net of the JV recharge (gross Tk 2,588.8m), BBS and Dominage show a single line with no recharge. WPPF: MAHL deducted Tk 6.8m before own PBT, BBS none in FY2025, Dominage Tk 0.47m [1 p.51] [11 p.13] [12 p.11]. Dominage's figure excludes Tk 11,566 of lease interest shown on a separate line [12 p.11]. Borrowings are long-term, current-portion and short-term loans; MAHL's include zero coupon bonds. BBS and Dominage make steel buildings rather than civil works; the comparison is of funding and margins, not of business model. Within this set of three, MAHL had the highest gross margin (31.4%) and the highest debt-to-equity (3.31x); BBS was the only one with a loss [11 p.13].

Line items: revenue halved in FY2025, gross margin rose to 31.4%, and tax took 82.7% of own-business profit

Exhibit 5Consolidated income statement, FY2018-FY2025
Tk mnFY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025
Revenue3,133.04,267.02,695.03,242.32,952.53,119.32,687.41,339.6
Cost of execution of contract2,310.93,134.81,928.82,306.62,098.02,184.91,864.8919.1
Gross profit822.11,132.2766.2935.7854.5934.4822.6420.5
General and administration expense233.7245.3144.7198.5214.6250.3232.8154.8
Profit from operations588.4887.0621.5737.3639.9684.2589.8265.7
Financial expenses (net of JV recharge)168.0361.4379.1425.9315.9339.9287.7127.6
PBT, own construction business (after WPPF)418.9522.1243.6311.6327.3349.0289.8131.5
Current tax236.5321.6168.6220.1248.4224.1214.3108.8
PAT, own construction business182.4200.575.091.678.9124.875.522.7
Share of JV profit after tax436.4432.0300.0367.9274.9275.2224.9184.7
Net profit618.8632.5375.0459.4353.8400.1300.4207.4

Revenue. Own-contract revenue fell from Tk 2,687.4m to Tk 1,339.6m in FY2025 [1 p.51]. The project table shows why in arithmetic terms: Chevron Block Twelve fell by Tk 507.0m, Munshiganj Bridge by Tk 319.2m, the two Jamuna Rail Bridge packages by Tk 315.3m and RCCDRF by Tk 194.3m, while the new Sylhet-Chhatak package added Tk 234.5m [1 p.124]. The managing director called it a 50% decrease to Tk 133 crore [1 p.36]. The fall continued in FY2026: nine-month revenue was Tk 512.3m against Tk 947.4m, and the March 2026 quarter only Tk 36.1m against Tk 337.7m [3 p.3].

Cost of execution and gross margin. Cost of execution fell 50.7% to Tk 919.1m in the five-year summary [1 p.51]; note 26.A gives Tk 877.3m consolidated [1 p.124], and the filing does not reconcile the two (footnote). Material cost was Tk 563.3m (Tk 1,446.7m in FY2024) and direct expenses Tk 308.8m, of which wages Tk 120.0m, depreciation Tk 103.4m and VAT deducted at import stage Tk 50.8m [1 p.124] [1 p.125]. Work in process rose from Tk 2,291.6m to Tk 2,583.8m [1 p.124]. Gross margin was 31.4% in FY2025 and has risen from 26.2% in FY2018 [15]. The filings do not split the margin by project (gap).

Inputs and their prices. MAHL prints material cost in taka only, with no tonnes of rod, cement or stone and no unit prices; no cost per unit can be built (searched notes 23.1, 26.1, 27.1 and inventories note 9). Material cost fell from Tk 2,274.3m in FY2019 to Tk 563.3m in FY2025, and was 42.0% of revenue in FY2025 against 58.3% in FY2018 [16 p.29] [1 p.124] [15]. Salary and wages inside cost of execution fell from Tk 617.2m (FY2019) to Tk 95.7m (FY2024) and Tk 120.0m (FY2025) [16 p.30] [1 p.125]. Over the same years the taka fell from Tk 84.03 to Tk 120.44 per dollar (FY averages) [21]; Bangladesh's imported ferrous scrap, the feedstock for local rebar, averaged US$418/t in 2022 and US$325/t in 2025, and imported clinker US$39.29/t and US$30.81/t (Comtrade mirror, FOB) [19]; Brent averaged US$91.1/bbl in FY2022 and US$74.6/bbl in FY2025 [20]. Management named 'rising material costs labor shortages, high interest and political instability' as margin pressures [6 p.29], and the directors' report gives no cause for the rise in gross margin to 31.39% beyond the percentages [1 p.42]. The Tk 919.1m cost of execution in the five-year table matches the directors' report figure of Tk 91.91 crore [1 p.42].

Exhibit 6Cost of execution components and input-price series, FY2018-FY2025
Tk mn / as statedFY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025
Material cost1,827.02,274.31,886.31,708.11,669.91,135.81,446.7563.3
Salary & wages in cost of execution450.2617.2404.1—478.3163.395.7120.0
Depreciation in cost of execution188.6145.4171.8—116.4133.8131.4103.4
Material cost / revenue58.3%53.3%70.0%52.7%56.6%36.4%53.8%42.0%
Gross margin26.2%26.5%28.4%28.9%28.9%30.0%30.6%31.4%
BDT per USD, FY average (BB)82.1284.0384.7984.8186.3099.46111.06120.44
Ferrous scrap HS 7204, US$/t (calendar year)339.7249.9250.8413.1418.4396.7273.2325.4
Clinker HS 252310, US$/t (calendar year)35.2036.6630.4933.5539.2935.2729.1030.81
Brent crude, US$/bbl, FY average63.768.651.654.191.186.884.774.6
Source: [s16 p.29-30] [17 p.31] [4 p.108] [s5 p.113-114] [6 p.114] [s1 p.124-125]; [19] [20] [21]; Input prices sheet [15] · FY2021 wages and depreciation: the AR2021 page has no text layer in our copy. Mirror unit values are FOB at the exporter and show the trend, not MAHL's price.
Exhibit 7Gross margin rose while revenue fell
Gross margin rose while revenue fell. Gross margin rose from 26.2% in FY2018 to 31.4% in FY2025, while G&A rose to 11.6% of revenue and operating margin fell to 19.8%.

Gross margin rose from 26.2% in FY2018 to 31.4% in FY2025, while G&A rose to 11.6% of revenue and operating margin fell to 19.8%.

Source: Ratios sheet [15]; [2 p.42] [1 p.51]

General and administration expense. G&A fell from Tk 232.8m to Tk 154.8m [1 p.51], mostly staff salaries (Tk 122.7m against Tk 192.4m) [1 p.125]. It still rose to 11.6% of revenue, the highest share in the eight years, because revenue fell faster [15]. Employees earning Tk 36,000 or more a year were 859 at both year-ends [1 p.131].

Finance expense. MAHL recorded gross interest and bank charges of Tk 2,588.8m in FY2025 (Tk 2,139.5m in FY2024), then deducted Tk 2,461.2m 'charged to Joint Venture Partners', leaving Tk 127.6m in its own profit and loss [1 p.126]. Its accounting policy says interest 'is allocated to the different projects and joint ventures on the basis of loan used' [1 p.112]. Hego-Mir Akhter alone was charged Tk 2,065.2m in FY2025 (Tk 972.7m in FY2024) [1 p.126], equal to 46.2% of that venture's FY2025 revenue of Tk 4,470.7m [15]. The notes do not show how the recharge is settled in cash or reflected in the investment balance; the cash flow statement shows interest paid of Tk 127.6m [1 p.97]. We list this as a gap.

Exhibit 8Gross interest and the share charged to joint ventures
Tk mnFY2024FY2025
Gross interest, FX and bank charges2,139.52,588.8
Charged to Hego-Mir Akhter JV972.72,065.2
Charged to other six JVs879.1396.0
Financial expenses in MAHL P&L287.7127.6
Share recharged to JVs86.6%95.1%
Source: Note 29 [1 p.126]; Drivers sheet [15]

Tax. Contract receipts are taxed at source, and the company provides the higher of 20% of profit, tax deducted at source and a minimum tax of 0.6% of revenue [1 p.127]. In FY2025 tax deducted at source (Tk 102.4m) was the binding figure against Tk 27.4m at 20% [1 p.127]. Current tax of Tk 108.8m took 82.7% of own-business profit before tax, the highest rate in the eight years; the rate was 56.5% in FY2018 [15]. Own-business PAT was Tk 22.7m in FY2025 [1 p.51] and -Tk 6.3m in the nine months to March 2026 [3 p.3].

Joint-venture profit. MAHL's share of JV profit fell from Tk 224.9m to Tk 184.7m in FY2025, and was Tk 85.7m in the nine months to March 2026 against Tk 112.7m [1 p.127] [3 p.3]. Hego-Mir Akhter produced Tk 156.9m of MAHL's share; the other six ventures together produced Tk 27.7m, with Halla-MAH-Seokwang at a loss of Tk 2.0m [1 p.127]. Ventures earned 3.3% after tax on their FY2025 revenue [15].

FY2026: nine-month profit of Tk 79m, then a full-year EPS of -Tk 6.58 announced on 27-Oct-2026

Nine months to March 2026. Revenue fell 45.9% to Tk 512.3m and gross profit 38.0% to Tk 154.9m, so the gross margin rose to 30.2% from 26.4% [3 p.3] [15]. Operating profit was Tk 84.0m and interest Tk 62.4m. Own-business tax of Tk 26.7m exceeded own-business profit before tax of Tk 20.5m, leaving a loss of Tk 6.3m from own construction; joint ventures added Tk 85.7m, for a net profit of Tk 79.4m (EPS Tk 0.66) [3 p.3]. The March 2026 quarter alone had revenue of Tk 36.1m, an operating loss of Tk 0.7m and net profit of Tk 6.7m (EPS Tk 0.06) [3 p.3].

Exhibit 9Quarterly and nine-month results, FY2025 vs FY2026
Tk mn9M FY20259M FY2026Q3 FY2025Q3 FY2026
Revenue947.4512.3337.736.1
Gross profit250.1154.974.016.1
Profit from operations163.084.038.5-0.7
PAT, own construction business7.9-6.35.9-7.3
Share of JV profit after tax112.785.726.814.0
Net profit120.679.432.76.7
EPS (Tk)1.000.660.270.06
Source: Q3 FY2026 interim [3 p.3]; Quarterly sheet [15]

Full year FY2026 (DSE announcement, audited accounts not yet in our corpus). On 27-Oct-2026 the company reported consolidated EPS of Tk (6.58), NAV per share of Tk 44.21 and operating cash flow per share of Tk 2.58 for the year to 30-Jun-2026, against Tk 1.72, Tk 51.51 and Tk 6.68 for FY2025, and the board recommended no dividend [7]. On 120.77m shares the loss is about Tk 795m; less the nine-month profit of Tk 79.4m, the April-June 2026 quarter lost about Tk 874m [15]. The DSE post gives no cause for the loss, and the audited FY2026 statements were not in our corpus on 4-Nov-2026 (checked the corpus document list; searched DSE posts to 4-Nov-2026) [7]. NAV per share fell by Tk 7.30, about Tk 882m of equity, which is close to the loss plus the FY2025 dividend of Tk 65.2m paid in January 2026 [7]. MISSING FILING: the audited FY2026 annual report; it was not in our corpus on 4-Nov-2026.

Exhibit 10Reported EPS and NAV per share, FY2021-FY2026
Reported EPS and NAV per share, FY2021-FY2026. EPS turned to a loss of Tk 6.58 in FY2026 from Tk 1.72 in FY2025; NAV per share fell to Tk 44.21 from Tk 51.51.

EPS turned to a loss of Tk 6.58 in FY2026 from Tk 1.72 in FY2025; NAV per share fell to Tk 44.21 from Tk 51.51.

Source: [1 p.45]; FY2026 from DSE [7]

Eight-year ratios: ROE fell from 20.0% in FY2019 to 3.4% in FY2025; JV return 1.1%

Exhibit 11Ratio summary, FY2018-FY2025
RatioFY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025
Revenue growth—36.2%-36.8%20.3%-8.9%5.6%-13.8%-50.2%
Gross margin26.2%26.5%28.4%28.9%28.9%30.0%30.6%31.4%
Operating margin18.8%20.8%23.1%22.7%21.7%21.9%21.9%19.8%
Effective tax rate, own business56.5%61.6%69.2%70.6%75.9%64.2%73.9%82.7%
JV share of net profit70.5%68.3%80.0%80.1%77.7%68.8%74.9%89.1%
ROE (average equity)—20.0%10.3%9.8%6.3%6.8%4.9%3.4%
Return on JV investment—8.2%3.5%3.6%2.4%2.2%1.6%1.1%
Debt / equity (x)3.2x3.7x4.2x3.1x3.2x2.9x3.1x3.3x
Interest cover (x, net of JV recharge)3.5x2.5x1.6x1.7x2.0x2.0x2.0x2.1x
Asset turnover (x)0.2x0.2x0.1x0.1x0.1x0.1x0.1x0.1x
Payout (cash dividend / net profit)———33.0%43.0%38.0%40.0%31.0%
Source: Ratios sheet [15]

Growth. Revenue has no trend: it peaked at Tk 4,267m in FY2019, was Tk 2,695m-3,242m between FY2020 and FY2024 and fell to Tk 1,340m in FY2025 [2 p.42] [1 p.51]. Net profit fell in four of the seven years after FY2018, from Tk 618.8m in FY2018 to Tk 207.4m in FY2025 [2 p.42] [1 p.51].

Returns. ROE on average equity was 20.0% in FY2019 and has fallen to 3.4% in FY2025, the lowest in the series [15]. The IPO added Tk 1,250m of equity in FY2021 [1 p.118], and retained earnings rose every year to FY2025. Profit from the joint ventures was 1.1% of the average capital invested in them in FY2025, down from 8.2% in FY2019, while that capital rose 4.6 times from Tk 3,725m (FY2018) to Tk 17,077m [2 p.43] [2 p.44] [1 p.52] [15].

Exhibit 12JV capital rose 4.6 times while the return on it fell
JV capital rose 4.6 times while the return on it fell. Return on JV investment fell from 8.2% in FY2019 to 1.1% in FY2025; JV investment was Tk 3,725 mn in FY2018.

Return on JV investment fell from 8.2% in FY2019 to 1.1% in FY2025; JV investment was Tk 3,725 mn in FY2018.

Source: [2 p.43] [2 p.44] [1 p.52]; Ratios sheet [15]

Efficiency. Asset turnover fell from 0.25x in FY2018-FY2019 to 0.05x in FY2025 because total assets grew with the JV investment while own revenue fell [15]. Inventories and work in process (Tk 3,978m) equalled about 1,084 days of FY2025 revenue, against 247 days in FY2018 [15]. Retention money held by employers was Tk 567.0m, 42.3% of FY2025 revenue and the highest ratio in the series [15].

Leverage and coverage. Total borrowings rose in six of the seven years after FY2018, from Tk 9,114m to Tk 20,606m [2 p.43] [2 p.44] [1 p.52]. Debt to equity was 3.31x at June 2025 (highest 4.18x at June 2020, lowest 2.90x at June 2023) [15]. Interest cover on the net finance expense the company reports was 2.1x in FY2025, but on gross interest of Tk 2,588.8m the operating profit of Tk 265.7m covered 0.10x [1 p.51] [1 p.126].

Exhibit 13Borrowings rose from Tk 9.1bn to Tk 20.6bn in seven years
Borrowings rose from Tk 9.1bn to Tk 20.6bn in seven years. Short-term loans were Tk 4,358 mn in FY2025 and the zero coupon bond Tk 650.8 mn; long-term loans were Tk 6,602 mn in FY2018.

Short-term loans were Tk 4,358 mn in FY2025 and the zero coupon bond Tk 650.8 mn; long-term loans were Tk 6,602 mn in FY2018.

Source: [2 p.43] [2 p.44] [1 p.52]; Ratios sheet [15]

Cash conversion and payout. Operating cash flow was 3.9x-5.4x net profit in FY2022-FY2025, but 0.4x in FY2021 [15]; FY2025 operating cash flow was Tk 806.8m and Tk 1,944.8m went into joint ventures in the same year [1 p.97]. The dividend took 31%-43% of net profit in FY2021-FY2025 [15].

What the cash flow shows. Over FY2018-FY2025 MAHL's operating cash flow totalled Tk 7,529m, it put Tk 14,858m into joint ventures and Tk 4,997m into equipment, and raised net loans of Tk 12,696m [16 p.8] [17 p.8] [4 p.79] [5 p.85] [1 p.97] [15]. The statement is on the direct method [1 p.97]. The indirect reconciliation starts from profit before tax and adds back the Tk 184.7m share of JV profit, interest of Tk 127.6m and depreciation of Tk 548.2m [1 p.129]. In every year the change in the JV investment balance equals the cash invested in the ventures (FY2025: Tk 1,944.2m against Tk 1,944.8m), so neither the share of JV profit nor the interest charged to the ventures appears in that balance [1 p.52] [1 p.97] [15]. Interest paid in the cash flow equals the net finance expense in profit and loss each year (FY2025 Tk 127.6m), not gross interest of Tk 2,588.8m [1 p.97] [1 p.126]. The company explained the FY2022 half-year rise in operating cash flow by 'decrease in inventory, advances and prepayments and increase in accounts payable' [18]; operating cash flow per share fell to Tk 2.58 in FY2026 (Tk 6.68) with no cause given [7].

Exhibit 14Printed cash flows, FY2018-FY2025
Tk mnFY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025
Net cash from operating activities443.21,287.862.8203.61,417.91,697.31,610.4806.8
Purchase of property, plant and equipment-860.9-942.9-345.7-704.5-668.0-641.0-665.5-167.6
Investment in joint ventures (cash)-1,504.8-3,057.1-3,534.0-88.0-2,123.8-289.7-2,315.6-1,944.8
Loans, net of repayment1,854.33,596.63,372.0922.31,356.3-1,840.51,489.41,945.4
Zero coupon bond0.00.00.00.00.0918.152.4-319.6
Interest paid-168.0-361.4-379.1-425.9-315.9-339.9-287.7-127.6
Dividend paid0.00.00.0—-150.3-150.6-150.3-119.0
Source: [16 p.8] [17 p.8] [4 p.79] [5 p.85] [6 p.86] [1 p.97]; Cash flow sheet [15] · Outflows negative. FY2018-FY2020 MAHL had no subsidiary (standalone = consolidated). FY2021 dividend paid not shown in our text of AR2021.

Balance sheet: Tk 17.1bn in joint ventures, Tk 20.6bn of debt, Tk 0.2bn of cash

Exhibit 15Consolidated balance sheet, FY2018-FY2025
Tk mnFY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025
Property, plant and equipment3,480.93,970.63,840.44,075.74,231.84,323.14,399.44,018.8
Investment in joint ventures3,724.76,781.910,315.910,403.912,527.812,817.515,133.117,077.3
Inventories (materials + WIP)2,118.52,484.83,525.94,252.84,300.64,017.83,932.93,978.4
Retention money702.4784.4732.9806.1743.0692.4553.0567.0
Cash and equivalents411.1497.5476.91,594.61,111.3447.0133.3229.9
Total assets12,634.016,988.220,420.122,721.024,289.023,696.025,235.127,144.4
Long-term loan6,602.29,998.313,470.512,131.413,581.612,827.714,626.915,597.6
Short-term loan2,511.72,712.22,612.14,873.54,779.63,692.93,383.24,357.8
Zero coupon bond0.00.00.00.00.0918.1970.5650.8
Shareholders' equity2,838.53,471.03,846.05,555.75,758.56,015.16,158.56,220.5

Where the money sits. At 30-Jun-2025, 62.9% of total assets was investment in joint ventures, 14.8% PPE and 14.7% inventories and work in process; cash was Tk 229.9m [1 p.52] [15]. By 31-Mar-2026 the JV investment had risen to Tk 19,064m and borrowings to Tk 21,598m (long-term Tk 16,887m, short-term Tk 4,204m, zero coupon bonds Tk 507m), with cash of Tk 222.3m [3 p.2].

How the JV balance is carried. The ventures are 'partnership at will' undertakings accounted for by the equity method, 'initially recognised at cost. The carrying amount of the Investments are adjusted to recognise changes in the company's share of net assets of the joint venture' [1 p.103] [1 p.115]; 'All distribution of profits paid to MAHL are done on an after-tax basis' [1 p.119]. In the printed figures, however, the yearly change in the balance equals the cash invested. The impairment policy covers the company's assets other than inventories and reviews them 'at each statement of financial position date' [1 p.108]; the notes state 'No indication of Impairment was observed in the period ended 30 June 2025' [1 p.108], and no recoverable-amount calculation for the JV investment is printed. The Tk 17,077m balance is the sum of the cash put in (see the cash flow above); the notes give no repayment schedule or capital-return terms per venture, and no venture balance sheet [1 p.114] [1 p.127]. How the Tk 2,461.2m of interest 'charged to Joint Venture Partners' is settled (cash, offset or a receivable) is not disclosed: it is neither in the JV balance nor in interest paid [1 p.126] [1 p.97].

Inventories and work in process. Note 9 splits the Tk 3,978.4m into raw materials Tk 1,320.4m (Tk 1,596.0m), work in process Tk 2,583.8m (Tk 2,291.6m) and goods in transit Tk 74.2m (Tk 45.3m) [1 p.117]. The policy describes work in process as contract assets where 'the customer has not been billed yet' [1 p.111]. No split by project, certification status or age is printed (searched notes 3.11, 9 and 26).

Who lends. Long-term loans of Tk 19,955m including the current portion came from 18 banks with balances plus Tk 1,701m of inter-company loans; the largest were Prime Bank (Tk 3,197m), BRAC Bank (Tk 3,084m), Mutual Trust Bank (Tk 2,858m), Dhaka Bank (Tk 1,542m) and Modhumoti Bank (Tk 1,505m) [1 p.120]. Bank loans carry 8.00%-15.50% interest and are secured by 'personal guarantee of all the Directors including Managing Director', charges on movable and immovable property and post-dated cheques [1 p.121]. Gross interest of Tk 2,588.8m on average borrowings of Tk 19,793m implies 13.1% for FY2025 (11.7% for FY2024) [1 p.126] [15]; the BB policy rate was 4.75% from Jul-2020 and was raised in steps to 10.00% from October 2024 and cut to 9.50% on 30-Jul-2026, and the all-bank weighted-average lending rate was 12.33% at June 2025 and 12.13% at June 2026 [22]. The board approved a Tk 3,000m partially convertible, partially redeemable bond on 30-Apr-2024 for an EGM on 25-Jun-2024, subject to BSEC approval [18]; no issue of it appears in the FY2025 accounts [1 p.52]. The zero coupon bonds are four-year bonds at a fixed 8.50% subscribed in February 2023 by Mr. Najmul Huq (Tk 289.8m outstanding), Ms. Abeda Sultana Huq (Tk 289.8m) and Naheed Cotton Mills Limited (Tk 71.2m) [1 p.122].

Exhibit 16Rates beside MAHL's implied cost of debt
SeriesValue
MAHL implied gross rate FY2024 (gross interest / avg borrowings)11.7%
MAHL implied gross rate FY202513.1%
Printed bank-loan range, June 20258.00%-15.50%
Zero coupon bond rate8.5%
BB policy rate, Jul-20204.8%
BB policy rate, from October 202410.0%
BB policy rate, from 30-Jul-20269.5%
SBS lending rate, end-June 202411.7%
SBS lending rate, end-June 202512.3%
SBS lending rate, end-June 202612.1%
Source: [1 p.121] [1 p.122] [1 p.126]; [22]; Rates and demand sheet [15]
Exhibit 17Largest lenders at 30-Jun-2025
Tk mnFY2024FY2025
Prime Bank2,259.63,197.3
BRAC Bank3,428.53,083.8
Mutual Trust Bank2,304.12,857.6
Dhaka Bank1,522.91,541.8
Modhumoti Bank1,479.71,504.7
Inter-company loans (Mir Telecom, Bangla Telecom and others)965.81,701.2
Zero coupon bonds970.5650.8
All long-term loans incl. current portion18,010.119,955.4
Source: Note 18 [1 p.120]; note 18.A and note 20 [1 p.122]

Receivables and retention money. The balance sheet carries no trade-receivables line; the notes state that debts are 'considered good and secured' and that no provision for doubtful debts is made [1 p.132]. Retention money ('Security deposits retained by the employer', note 8.2) was Tk 567.0m: Tk 47.0m was retained and Tk 33.0m refunded in FY2025, after Tk 213.6m was refunded in FY2024 [1 p.116]. Advances to suppliers rose from Tk 347.4m to Tk 594.3m [1 p.116]. The receivables policy says contract receivables are 'amounts billed on completed construction contracts' and that 'all outstanding receivables at the year end are considered fully collectible' [1 p.111]; no amount owed by each government client, and no ageing, is printed.

Exhibit 18Retention money held by employers, FY2018-FY2025
Retention money held by employers, FY2018-FY2025. Retention money held by employers was Tk 567 mn in FY2025, equal to 42.3% of revenue, up from 20.6% in FY2024.

Retention money held by employers was Tk 567 mn in FY2025, equal to 42.3% of revenue, up from 20.6% in FY2024.

Source: [2 p.43] [1 p.116]; Ratios sheet [15]

Audit opinion. G. Kibria & Co. gave a qualified opinion on the FY2025 accounts. The basis reads: 'The company had established a provident fund at 2010 under the rules of Bangladesh labor Act- 2006. In accordance with para-08 of circular no: 179/FRC/FRM/Proggapon/2020/2 dated July 07, 2020 issued by Financial Reporting Council, financial statements of employee provident fund of a public interest entity shall be audited within 120 days of completion of relevant financial year. However, the company did not do so. We were unable to determine if any issues exist there which may affect financial statements. The audit is under process.' [1 p.90] [9]. Key audit matters were the subsidiary consolidation and property, plant and equipment [1 p.91]. The only contingent liability disclosed is a tax claim of Tk 7.79m for assessment year 2012-13 under appeal at the High Court [1 p.131].

Related parties. Mir Telecom Ltd. and Bangla Telecom Ltd., described as companies with common directorship, lent MAHL Tk 1,249.0m and Tk 423.2m at 30-Jun-2025 (Tk 859.7m and Tk 106.2m a year earlier); REGO Communications Ltd. lent Tk 21.0m and Colo Asia Limited Tk 8.0m [1 p.130] [1 p.122]. In FY2025 Mir Telecom added Tk 1,411.4m and Tk 1,022.0m was adjusted [1 p.130]. The note to the loans says they were received during the year 'which has subsequently been paid' [1 p.122]; no interest rate, tenor or security for them is printed, and the lenders' own accounts are not in our corpus. MAHL also had Tk 15.9m of advances to its subsidiary Mir Securities [1 p.130].

Dividends: Tk 1.25 a share for FY2021-FY2023, Tk 1.00 for FY2024, 10.5% to non-sponsors for FY2025, none for FY2026

Exhibit 19Cash dividend history
FY2021FY2022FY2023FY2024FY2025FY2026
Cash dividend (% of face value)12.5%12.5%12.5%10.0%10.5%0.0%
Cash paid out (Tk mn)151.0151.0151.0120.865.20.0
Consolidated EPS (Tk)3.802.933.312.491.72-6.58
Source: [4 p.36] [2 p.36] [5 p.36] [6 p.37] [7]; Ratios sheet [15]

Before listing there was no cash dividend for FY2015-FY2019 (a 4,900% stock dividend for FY2016) [16 p.41]. The board recommended a 12.5% cash dividend for FY2021, FY2022 and FY2023 and 10% (Tk 1.00 a share) for FY2024 [4 p.36] [2 p.36] [5 p.36] [6 p.37]. For FY2025 the DSE declaration of 28-Oct-2025 was a 10.50% cash dividend 'for general shareholders (excluding Sponsors and Directors)'; sponsors and directors, who hold 58,667,000 of the 120,771,547 shares, were excluded, and the other 62,104,547 shares received Tk 65.2m [7]; the annual report's events note describes the proposal as a 10% cash dividend [1 p.132]. Neither the DSE post nor the annual report gives a reason for leaving the sponsors and directors out [7] [1 p.132]. The FY2025 dividend was disbursed by 26-Jan-2026, and the board recommended no dividend for FY2026 [7]. All paid-out rows above are for all shareholders except FY2025.

Exhibit 20Credit ratings and capital decisions on DSE, last 24 months
EventDateDetail
CRISL rating12-Jan-2025A+ long term, ST-3 short term, stable
Board decision: preference shares22-Dec-2024Up to Tk 2,500m to refinance existing loans
BSEC on preference shares19-Jun-2025Not in a position to accord consent
Auditor's qualified opinion disseminated11-Nov-2025FY2025, provident fund
CRISL rating22-Apr-2026A long term, ST-4 short term, stable
FY2026 results27-Oct-2026EPS Tk (6.58), NAV Tk 44.21, no dividend
Source: [7]

Capital raising. On 22-Dec-2024 the board decided to issue up to Tk 2,500m of cumulative, non-participative, fully redeemable preference shares 'to refinance the existing loans', subject to an EGM on 8-Feb-2025 and BSEC approval; on 19-Jun-2025 DSE reported that BSEC 'is not in a position to accord consent' [7]. Our 24-month sweep of DSE news (old_news.php, criteria 3) found no board approval for new capital expenditure or expansion, and the FY2025 accounts show no capital expenditure commitment [7] [1 p.130].

Governance: sponsors hold 48.58%; four of six directors are executives or family; directors guarantee the loans

Exhibit 21Shareholding at 30-Jun-2025
Share of capital
Sponsors / directors (58,667,000 shares)48.6%
Institutions7.0%
General public44.0%
Source: Note 13 [1 p.118]; DSE [7]

Sponsors and directors held 58,667,000 shares, 48.58% of the 120,771,547 shares, at both June 2024 and June 2025; institutions held 7% (5% in 2024) and the general public 44% (47%) [1 p.118] [7]. The board in FY2025 had six members: Mir Nasir Hossain (managing director), Mrs. Sohela Hossain, Mrs. Mahbuba Nasir, Mr. Shama-e-Zaheer (director and COO), and two independent directors, Prof. Dr. Muhammad Shariat Ullah and Prof. Khelada Khanom; the board met five times [1 p.131]. The managing director was paid Tk 5.6m and the COO Tk 2.24m in FY2025 [1 p.130]. Shama-e-Zaheer is also managing director of the subsidiary Mir Securities [1 p.44].

DSE news, last 24 months. Beyond results and dividends, the company disclosed two contract awards (Bangladesh Railway, Tk 1,999.4m, NOA 14-Jan-2025, signed 3-Feb-2025, 18 months; LGED, Tk 1,746.2m, NOA 29-Oct-2025, 24 months), the preference-share plan and its refusal, the auditor's qualified opinion (11-Nov-2025), two CRISL ratings (A+/ST-3 on 12-Jan-2025; A/ST-4 on 22-Apr-2026) and the appointment of Khandaker Fahim Ahammed as company secretary (6-Oct-2026) [7] [8]. DSE news in the window shows no sponsor share sale [7]. Neither CRISL post gives reasons: each states the grades and the financials considered [7]; the FY2025 annual report gives only the rating basis [1 p.84], and the rating rationale is not in our corpus (crislbd.com not checked). DSE news, Nov-2021 to Sep-2024. The board called an EGM for 10-Mar-2022 to amend the use of IPO proceeds and decided a further amendment on 14-Nov-2022; Q3 FY2022 EPS was revised from Tk 1.83 to Tk 1.80 on 19-May-2022; the Tk 3,000m convertible bond went to an EGM on 25-Jun-2024 [18]. On 14-Nov-2021 the board decided to issue Tk 2,500m of zero coupon bonds, and on 15-Mar-2022 BSEC consented to a 4-year bond 'to restructure the high cost bearing liabilities and also to invest in Company's working capital' [18]; Tk 918.1m was raised in FY2023 [5 p.85], and the filings give no reason for the smaller amount. The Q3 FY2022 post cited 'a higher borrowing rate and higher interest expense' (28-Apr-2022) [18]. On 24-Mar-2022 the board decided to form a subsidiary, 'Mir Steel Mills Limited' [25]; it does not appear in the FY2025 consolidated accounts, which hold only Mir Securities [1 p.130]. The other posts were results, dividends, record dates, a category change and board-meeting notices [18].

Market data: Tk 25.0 a share, 0.57 times FY2026 NAV per share

Price date: 29-Oct-2026 (market-data feed unavailable on 4-Nov-2026). The shares closed at Tk 25.0 on 29-Oct-2026, against a 52-week range of Tk 23.9 (17-Nov-2025) to Tk 48.7 (4-Jun-2026) [10]. At that price the market value is about Tk 3,019m on 120.77m shares. The price is 0.57 times the FY2026 NAV per share of Tk 44.21 [7]; there is no P/E on the FY2026 loss. At June year-ends the P/E on reported EPS moved from 21.6x (FY2021) to 15.3x (FY2025) and the P/B from 1.78x to 0.51x [15]. In 2022-2023 the share traded at Tk 50.8 for months at a time [10]. These multiples are stated as facts only.

Exhibit 22June year-end price and multiples (facts, not a valuation)
JuneFY2021FY2022FY2023FY2024FY2025
Share price (Tk)82.154.153.837.426.3
P/E (x)21.6x18.5x16.3x15.0x15.3x
P/B (x)1.8x1.1x1.1x0.7x0.5x
Source: Ratios sheet [15]; prices [10]

What's next: record date 19-Nov-2026, AGM 23-Dec-2026, bonds due February 2027

Exhibit 23Dated items after 31-Oct-2026 and the line each one touches
ItemDateLineSource
Record date for FY2026 (no dividend)19-Nov-2026DividendDSE news 27-Oct-2026
Q1 FY2027 accounts (no board date notified yet)about 12-14 Nov 2026 (inferred from board meetings of 14-Nov-2024 and 12-Nov-2025)Revenue, JV profitDSE news
AGM on FY2026 accounts23-Dec-2026Dividend, audit opinionDSE news 27-Oct-2026
Zero coupon bonds reach their four-year term1, 7 and 12 Feb 2027 (derived from issue dates)Borrowings, cashAR2025 note 20
Q2 FY2027 accountslate Jan 2027 (inferred from 30-Jan-2025 and 27-Jan-2026)Revenue, borrowingsDSE news
LGED Lalmonirhat contract, 24 months from NOAto about Oct-2027Own revenueCompany letter of 23-Nov-2025
LDC graduation24-Nov-2029Tax and donor-funded spending (policy)Daily Star / TBS, 30-Oct-2026

Contracts. The Bangladesh Railway Sylhet-Chhatak Bazar rehabilitation (Tk 1,999.4m, ADB-funded) was signed on 3-Feb-2025 with an 18-month duration [7]; that period ended in August 2026 (passed), outcome unknown. The LGED contract for primary-school-cum-flood-shelters with solar nano-grids, roads and culverts in Lalmonirhat District has a contract value of Tk 1,746.2m over 24 months from 29-Oct-2025 [8]. Both move own-contract revenue, and the filings give no order-book total (gap). Funding. The zero coupon bonds were issued on 1, 7 and 12 February 2023 for four years [1 p.122]; the balance was Tk 506.9m at 31-Mar-2026 [3 p.2]. Policy. The UN General Assembly adopted the move of Bangladesh's LDC graduation date from 24-Nov-2026 to 24-Nov-2029 on 29-Oct-2026 in New York (30-Oct in Dhaka) [13] [14]; MAHL's filings do not discuss LDC graduation.

Zero coupon bond holders. The bonds were subscribed by Mr. Najmul Huq (Tk 289.8m outstanding), Ms. Abeda Sultana Huq (Tk 289.8m) and Naheed Cotton Mills Limited (Tk 71.2m) on 1-12 February 2023 'for executing the projects and repayment of bank loans' [1 p.122]. The balance fell from Tk 970.5m to Tk 650.8m in FY2025 (Tk 319.6m repaid) [1 p.97]. The notes do not say whether the holders are related to the sponsors, and the related-party note does not list them [1 p.130]. Order book. No backlog or unexecuted contract value is printed for MAHL or its ventures (searched the directors' report, MD&A and notes 5 and 25) [1 p.39] [1 p.114].

Risks: interest, one large venture and the FY2026 loss, each tied to a line

Exhibit 24Risk table with the printed line amounts (FY2025)
RiskLinePrinted amount, FY2025Status
Interest ratesFinance cost / JV profitGross interest Tk 2,588.8m; Tk 2,461.2m charged to JVs; Tk 127.6m in P&LRates 8.00%-15.50% p.a.
Concentration in Hego-Mir AkhterJV profit47.8% of JV investment; 84.9% of MAHL's FY2025 JV profitOngoing
Own revenueRevenue / gross profitRevenue Tk 1,339.6m; gross profit Tk 420.5mRevenue fell 50.2% in FY2025
Tax on receiptsTaxTax deducted at source (Tk 102.4m) was 7.7% of standalone revenue; own-business tax rate 82.7%Applies regardless of profit
RefinancingBorrowingsTk 4,358m short-term at June 2025; bonds of Tk 507m reach term in Feb-2027Preference-share refinancing refused 19-Jun-2025
FY2026 lossEquityNAV per share Tk 51.51 to Tk 44.21 (-14.2%)Cause not yet disclosed in our corpus
Audit qualificationOpinionProvident fund accounts not audited within 120 daysFY2025; FY2026 opinion pending
Related-party fundingBorrowingsTk 1,672m from Mir Telecom and Bangla Telecom at June 2025Up from Tk 966m
Source: [1 p.126] [1 p.127] [1 p.114] [1 p.52]; Drivers sheet [15]

The joint ventures carry the result: in FY2025 they produced 89.1% of net profit [15], and their profitability depends on contract margins that MAHL does not report venture by venture beyond revenue and profit after tax [1 p.127]. Their funding rests on MAHL's own borrowing: Tk 2,461.2m of the year's interest was charged to them [1 p.126]. The directors' report lists project-completion, market and technology, credit, liquidity, exchange-rate and policy risks and states that most clients are government bodies and that 'the risk of not getting available funds ... is very slim' [1 p.41]. The company's own note 47 gives Tk 76.4m of additional expense for a 1% rise in the average interest rate [1 p.132].

  • Q1 FY2027 accounts (about 12-14 Nov 2026, inferred): own revenue against Tk 512.3m for nine months of FY2026, and JV profit.
  • FY2026 annual report before the AGM of 23-Dec-2026: cause of the June 2026 quarter loss, JV note 31, interest note 29 and the auditor's opinion.
  • Zero coupon bond balance in the Q2 FY2027 accounts (late Jan 2027, inferred).
  • Inter-company loans from Mir Telecom and Bangla Telecom in the FY2026 related-party note.
  • Any new CRISL rating announcement on DSE.

The model

The model with its formulas: open it in the spreadsheet view or download the Excel file (AnalystBro paid accounts). Download .xlsx

History

Tk mn (consolidated), FY to JuneFY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025
Revenue3,133.04,267.02,695.03,242.32,952.53,119.32,687.41,339.6
Cost of execution of contract2,310.93,134.81,928.82,306.62,098.02,184.91,864.8919.1
Gross profit822.11,132.2766.2935.7854.5934.4822.6420.5
General and administration expense233.7245.3144.7198.5214.6250.3232.8154.8
Profit from operations588.4887.0621.5737.3639.9684.2589.8265.7
Non-operating income19.422.613.316.419.922.42.40.3
Financial expenses (net of JV recharge)168.0361.4379.1425.9315.9339.9287.7127.6
PBT, own construction business418.9522.1243.6311.6327.3349.0289.8131.5
Current tax236.5321.6168.6220.1248.4224.1214.3108.8
PAT, own construction business182.4200.575.091.678.9124.875.522.7
Share of JV profit after tax436.4432.0300.0367.9274.9275.2224.9184.7
Net profit618.8632.5375.0459.4353.8400.1300.4207.4
Property, plant and equipment3,480.93,970.63,840.44,075.74,231.84,323.14,399.44,018.8
Investment in joint ventures3,724.76,781.910,315.910,403.912,527.812,817.515,133.117,077.3
Inventories (materials + WIP)2,118.52,484.83,525.94,252.84,300.64,017.83,932.93,978.4
Retention money (security deposits)702.4784.4732.9806.1743.0692.4553.0567.0
Cash and equivalents411.1497.5476.91,594.61,111.3447.0133.3229.9
Total assets12,634.016,988.220,420.122,721.024,289.023,696.025,235.127,144.4
Shareholders' equity2,838.53,471.03,846.05,555.75,758.56,015.16,158.56,220.5
Long-term loan6,602.29,998.313,470.512,131.413,581.612,827.714,626.915,597.6
Short-term loan2,511.72,712.22,612.14,873.54,779.63,692.93,383.24,357.8
Zero coupon bond0.00.00.00.00.0918.1970.5650.8
Operating cash flow443.21,287.862.8203.61,417.91,697.31,610.4806.8
EPS (Tk, as reported)———3.802.933.312.491.72
Cash dividend paid out (Tk mn)———151.0151.0151.0120.865.2
Shares (mn)100.00100.00100.00120.77120.77120.77120.77120.77
June close price (Tk)———82.154.153.837.426.3

Ratios

RatioFY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025
Revenue growth—36.2%-36.8%20.3%-8.9%5.6%-13.8%-50.2%
Gross margin26.2%26.5%28.4%28.9%28.9%30.0%30.6%31.4%
Operating margin18.8%20.8%23.1%22.7%21.7%21.9%21.9%19.8%
G&A / revenue7.5%5.7%5.4%6.1%7.3%8.0%8.7%11.6%
Effective tax rate, own business56.5%61.6%69.2%70.6%75.9%64.2%73.9%82.7%
JV share of net profit70.5%68.3%80.0%80.1%77.7%68.8%74.9%89.1%
Net margin19.8%14.8%13.9%14.2%12.0%12.8%11.2%15.5%
ROE (average equity)—20.0%10.3%9.8%6.3%6.8%4.9%3.4%
Return on JV investment (JV PAT / avg JV investment)—8.2%3.5%3.6%2.4%2.2%1.6%1.1%
Total borrowings (Tk mn)9,11412,71016,08317,00518,36117,43918,98120,606
Debt / equity (x)3.2x3.7x4.2x3.1x3.2x2.9x3.1x3.3x
Net debt / equity (x)3.1x3.5x4.1x2.8x3.0x2.8x3.1x3.3x
Interest cover (operating profit / net finance expense)3.5x2.5x1.6x1.7x2.0x2.0x2.1x2.1x
JV investment / total assets29.5%39.9%50.5%45.8%51.6%54.1%60.0%62.9%
Inventory + WIP days (on revenue)2472134784795324705341,084
Retention money / revenue22.4%18.4%27.2%24.9%25.2%22.2%20.6%42.3%
Asset turnover (x)0.2x0.3x0.1x0.1x0.1x0.1x0.1x0.0x
Cash conversion (CFO / net profit)0.7x2.0x0.2x0.4x4.0x4.2x5.4x3.9x
Payout (cash dividend / net profit)n/an/an/a33%43%38%40%31%
NAV per share (Tk)28.3934.7138.4646.0047.6849.8150.9951.51
June P/E (x)n/an/an/a21.6x18.5x16.3x15.0x15.3x
June P/B (x)n/an/an/a1.8x1.1x1.1x0.7x0.5x

Drivers

Tk mn (FY to June)FY2024FY2025
Gross interest and bank charges2,139.52,588.8
Interest charged to JV partners1,851.82,461.2
of which Hego-Mir Akhter JV972.72,065.2
Financial expenses charged to P&L287.7127.6
JV revenue (100%)—5,745.4
JV profit after tax (100%)—188.4
MAHL share of JV profit224.9184.7
Hego-Mir Akhter JV revenue—4,470.7
Hego-Mir Akhter JV PAT—160.2
Investment in Hego-Mir Akhter JV5,152.78,155.3
Investment in all JVs15,133.117,077.3
Cash invested in JVs in the year2,315.61,944.8
Retention money retained by employers74.347.0
Retention money refunded213.633.0
Material cost1,446.7563.3
Direct expenses (wages, fuel, VAT, depreciation)374.8308.8
of which depreciation in cost131.4103.4
Closing work in process2,291.62,583.8
Tax deducted at source on contract receipts204.4102.4
Inter-company loans from group companies965.81,701.2
Revenue, standalone2,683.21,336.4
Chevron Bangladesh Block Twelve710.2203.2
Jamuna Rail Bridge WD-I + WD-II804.3489.0
Munshiganj Bridge (MSBP)409.590.3
RCCDRF308.3114.0
Sylhet-Chhatak railway (SCRP)0.0234.5
Share of gross interest recharged to JVs86.6%95.1%
JV net margin (PAT / revenue, 100%)n/a3.3%
Hego JV: interest recharged / JV revenuen/a46.2%
Top-3 projects share of standalone revenue56.4%69.3%
Depreciation share of direct expenses35.1%33.5%
Tax deducted at source / standalone revenue7.6%7.7%

Quarterly

Tk mn (consolidated)9M FY20259M FY2026Q3 FY2025Q3 FY2026
Revenue947.4512.3337.736.1
Gross profit250.1154.974.016.1
Profit from operations163.084.038.5-0.7
Interest expenses94.562.412.64.3
PAT, own construction business7.9-6.35.9-7.3
Share of JV profit after tax112.785.726.814.0
Net profit120.679.432.76.7
Gross margin26.4%30.2%21.9%44.6%
EPS (Tk)1.000.660.270.06
FY2026 net profit implied by DSE EPS-794.7———
Q4 FY2026 implied net profit-874.1———

Peers

FY2025 (Tk mn, own filings)Mir Akhter (consol.)BBSDominage
Revenue1,339.6592.9189.6
Gross profit420.5122.638.9
Finance cost (P&L)127.6159.911.6
Profit after tax207.4-96.55.1
Total borrowings20,606.21,134.578.4
Shareholders' equity6,220.51,749.81,761.1
Opening equity6,158.52,105.21,757.8
Gross margin31.4%20.7%20.5%
Finance cost / revenue9.5%27.0%6.1%
Debt / equity (x)3.3x0.6x0.0x
ROE (average equity)3.4%-5.0%0.3%

Cash flow

Tk mnFY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025Source
Net cash from operating activities4431,288632041,4181,6971,610807AR2019 p.8 (FY18-19); AR2020 p.8 (FY20); AR2021 p.79 (FY21); AR2023 p.85 (FY22-23); AR2024 p.86 (FY24 JV); AR2025 p.97 (FY24-25)
Purchase of property, plant and equipment-861-943-346-704-668-641-666-168AR2019 p.8 (FY18-19); AR2020 p.8 (FY20); AR2021 p.79 (FY21); AR2023 p.85 (FY22-23); AR2024 p.86 (FY24 JV); AR2025 p.97 (FY24-25)
Investment in joint ventures (cash)-1,505-3,057-3,534-88-2,124-290-2,316-1,945AR2019 p.8 (FY18-19); AR2020 p.8 (FY20); AR2021 p.79 (FY21); AR2023 p.85 (FY22-23); AR2024 p.86 (FY24 JV); AR2025 p.97 (FY24-25)
Loans, net of repayment1,8543,5973,3729221,356-1,8401,4891,945AR2019 p.8 (FY18-19); AR2020 p.8 (FY20); AR2021 p.79 (FY21); AR2023 p.85 (FY22-23); AR2024 p.86 (FY24 JV); AR2025 p.97 (FY24-25)
Zero coupon bond0000091852-320AR2019 p.8 (FY18-19); AR2020 p.8 (FY20); AR2021 p.79 (FY21); AR2023 p.85 (FY22-23); AR2024 p.86 (FY24 JV); AR2025 p.97 (FY24-25)
Interest paid-168-361-379-426-316-340-288-128AR2019 p.8 (FY18-19); AR2020 p.8 (FY20); AR2021 p.79 (FY21); AR2023 p.85 (FY22-23); AR2024 p.86 (FY24 JV); AR2025 p.97 (FY24-25)
Dividend paid000n/a-150-151-150-119AR2019 p.8 (FY18-19); AR2020 p.8 (FY20); AR2021 p.79 (FY21); AR2023 p.85 (FY22-23); AR2024 p.86 (FY24 JV); AR2025 p.97 (FY24-25)
Ratios
Change in JV investment balance (History)n/a3,0573,534882,1242902,3161,944Formula
Cash invested in JVs (positive)1,5053,0573,534882,1242902,3161,945Formula
Interest paid / net finance expense in P&L11111111Formula
CFO / net profit12004454Formula
Signs as printed (outflows negative). FY2021 dividend paid not printed separately on AR2021 p.79 in our text (n/a).
FY2024 investment in JVs: AR2024 p.86 prints 2,315,624,330; the AR2025 comparative is unreadable in our OCR copy.
The yearly change in the JV balance equals the cash invested each year; the share of JV profit and the interest charged to JVs are not added to the balance in these figures.

Input prices

Item (Tk mn unless stated)FY2018FY2019FY2020FY2021FY2022FY2023FY2024FY2025Source / note
Material cost (rod, cement, sand, stone, bricks etc.)1,8272,2741,8861,7081,6701,1361,447563Material cost, note 23.1/20.1/27.1/26.1: AR2019 p.29 (FY18-19), AR2021 p.108 (FY20-21), AR2023 p.113 (FY22-23), AR2024 p.114 (FY24), AR2025 p.124 (FY25)
Salary & wages in direct expenses450617404n/a47816396120Direct expenses note: AR2019 p.30 (FY18-19), AR2020 p.31 (FY20), AR2023 p.114 (FY22-23), AR2025 p.125 (FY24-25); FY2021 page has no text layer in our copy
Depreciation in direct expenses189145172n/a116134131103Direct expenses note: AR2019 p.30 (FY18-19), AR2020 p.31 (FY20), AR2023 p.114 (FY22-23), AR2025 p.125 (FY24-25); FY2021 page has no text layer in our copy
Revenue (History)3,1334,2672,6953,2422,9523,1192,6871,340Formula
Material cost / revenue11111010Formula
Gross margin (History)00000000Formula
BDT/USD, FY average of monthly averages (BB)828485858699111120sector_data/fx/bdt_usd_monthly_avg_bb.csv; https://www.bb.org.bd/econdata/nsdp/xml/bgd/exr_bgd.xml
Comtrade mirror HS 7204 ferrous scrap to Bangladesh, USD/t, calendar year ending in FY340250251413418397273325sector_data/commodities/bd_import_uv_ferrous_scrap_7204_mirror.csv; https://comtradeapi.un.org/public/v1/preview/C/A/HS?partnerCode=50&cmdCode=7204&flowCode=X (rebar feedstock; FOB, trend not level)
Comtrade mirror HS 252310 clinker to Bangladesh, USD/t, calendar year3537303439352931sector_data/commodities/bd_import_uv_clinker_252310_mirror.csv; cmdCode=252310 (cement input)
World Bank Brent crude, USD/bbl, FY average6469525491878575sector_data/commodities/wb_crude_brent.csv; World Bank Pink Sheet (fuel and bitumen are oil products)
MAHL prints material cost in taka only: no tonnes of rod, cement or stone, and no unit prices (searched notes 23.1/26.1/27.1 and inventories note 9).
HS 720711 billet mirror not used: one reporter in 2024-2025 and an implausible 2024 value (13,808 USD/t).
'PAKUR STONE CHIPS' are bought on deferred LC (AR2025 p.122, note 21).

Rates and demand

SeriesValueSource
Implied gross rate: gross interest / average borrowings, FY20250Formula: AR2025 p.126 gross interest; borrowings History
Implied gross rate, FY20240Formula
Printed bank loan rates (AR2025 p.121)8.00%-15.50%AR2025 note 18
Zero coupon bond rate (AR2025 p.122)0AR2025 note 20
BB policy (repo) rate, change dates
Policy rate from 2020-07-290https://www.bb.org.bd/monetaryactivity/mps/mps_fy2020-21.pdf
Policy rate from 2022-05-010https://www.bb.org.bd/monetaryactivity/mps/mps_fy2022-23.pdf
Policy rate from 2022-06-300https://www.bb.org.bd/monetaryactivity/mps/mps_fy2022-23.pdf
Policy rate from 2022-09-010https://www.bb.org.bd/monetaryactivity/mps/mps(jan-jun2023).pdf
Policy rate from 2023-01-150https://www.bb.org.bd/monetaryactivity/mps/mps(jan-jun2023).pdf
Policy rate from 2023-07-010https://www.bb.org.bd/monetaryactivity/mps/mps(jul-dec2023).pdf
Policy rate from 2023-10-010https://www.bb.org.bd/monetaryactivity/mps/mps_h2fy24.pdf
Policy rate from 2023-11-260https://www.bb.org.bd/mediaroom/notice/mpcresolution_1.pdf
Policy rate from 2024-01-170https://www.bb.org.bd/mediaroom/notice/mpcresolution_2.pdf
Policy rate from 2024-05-080https://www.bb.org.bd/mediaroom/notice/mpcresolution_3.pdf
Policy rate from 2024-08-250https://www.bb.org.bd/mediaroom/notice/mpcresolution_5.pdf
Policy rate from 2024-09-010https://www.bb.org.bd/monetaryactivity/mps/mps_h2fy25.pdf
Policy rate from 2024-10-010https://www.bb.org.bd/monetaryactivity/mps/mps_h1fy26.pdf
Policy rate from 2026-07-300https://www.bb.org.bd/mediaroom/notice/mpcresolution_13.pdf
SBS weighted-average lending rate, end-June 20180https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
SBS weighted-average lending rate, end-June 20190https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
SBS weighted-average lending rate, end-June 20200https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
SBS weighted-average lending rate, end-June 20210https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
SBS weighted-average lending rate, end-June 20220https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
SBS weighted-average lending rate, end-June 20230https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
SBS weighted-average lending rate, end-June 20240https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
SBS weighted-average lending rate, end-June 20250https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
SBS weighted-average lending rate, end-June 20260https://www.bb.org.bd/en/index.php/publication/publictn/3/10 (Table-102)
Private-sector credit growth y/y, June 2018 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, June 2019 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, June 2020 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, June 2021 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, June 2022 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, June 2023 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, June 2024 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, June 2025 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, June 2026 (BB MEI)0sector_data/demand/bb_private_credit_yoy.csv
Private-sector credit growth y/y, Aug-2026 (latest)0sector_data/demand/bb_private_credit_yoy.csv
CPI inflation y/y, Sep-2026 (BBS via BB)0https://www.bb.org.bd/econdata/nsdp/xml/bgd/cpi_bgd.xml
DSEX close, end-June 20216,150sector_data/market/dsex_daily.csv
DSEX close, end-June 20226,377sector_data/market/dsex_daily.csv
DSEX close, end-June 20236,344sector_data/market/dsex_daily.csv
DSEX close, end-June 20245,328sector_data/market/dsex_daily.csv
DSEX close, end-June 20254,838sector_data/market/dsex_daily.csv
DSEX close, end-June 20265,763sector_data/market/dsex_daily.csv
DSEX close, 2-Nov-2026 (latest)5,334sector_data/market/dsex_daily.csv
ADP allocation / IMED implementation (roads, bridges, rail)not in our data at 4-Nov-2026IMED monthly ADP progress not in sector_data
Policy rate from sector_data/rates/bd_policy_rate_bb_history.csv only; lending rate from banks/bb_sbs_wavg_lending_rate.csv. MAHL does not print a rate per lender.

FAQ

What does Mir Akhter Hossain Limited do?
It is a Dhaka civil-engineering contractor building roads, bridges, railway track and airport runways, mostly for government agencies. Large contracts are run through seven joint ventures with Korean and Chinese contractors; in FY2025 these produced Tk 184.7m of its Tk 207.4m net profit.
Why did Mir Akhter's revenue fall in FY2025?
Own-contract revenue fell from Tk 2,687m to Tk 1,340m as large projects such as Chevron Block Twelve, Munshiganj Bridge and the Jamuna Rail Bridge packages billed less. Management named rising material costs, labour shortages, high interest and political instability as pressures.
How much debt does Mir Akhter have?
Tk 20,606m at 30-Jun-2025 (long-term loans, short-term loans and zero coupon bonds), 3.3 times equity, and Tk 21,598m at 31-Mar-2026. Bank loans carry 8.00%-15.50% interest and are guaranteed personally by all directors.
Did Mir Akhter pay a dividend for FY2026?
No. The board recommended no dividend for the year to 30-Jun-2026 after a consolidated EPS of -Tk 6.58. The record date is 19-Nov-2026 and the AGM 23-Dec-2026. For FY2025 it paid 10.5% to non-sponsor shareholders only.
Why is the FY2025 audit opinion qualified?
The auditor, G. Kibria & Co., said the company's employee provident fund accounts were not audited within 120 days of the year-end as an FRC circular requires, and it was 'unable to determine if any issues exist there which may affect' the financial statements [1 p.90].

Sources

  1. Mir Akhter Hossain Limited Annual Report 2025, year to 30-Jun-2025 (corpus MIRAKHTER_ANNUAL_2025, PDF page numbers) · link · accessed 2026-10-31
  2. Mir Akhter Hossain Limited Annual Report 2022, year to 30-Jun-2022, five-year consolidated summary FY2018-FY2022 (corpus MIRAKHTER_ANNUAL_2022) · link · accessed 2026-10-31
  3. Mir Akhter Hossain Limited un-audited consolidated financial statements, nine months to 31-Mar-2026 (corpus MIRAKHTER_QUARTERLY_Q3_2026) · link · accessed 2026-10-31
  4. Mir Akhter Hossain Limited Annual Report 2021 (directors' report, FY2021 dividend) · link · accessed 2026-10-31
  5. Mir Akhter Hossain Limited Annual Report 2023 (directors' report, FY2023 dividend) · link · accessed 2026-10-31
  6. Mir Akhter Hossain Limited Annual Report 2024 (directors' report, FY2024 dividend) · link · accessed 2026-10-31
  7. DSE news archive for MIRAKHTER, 1-Oct-2024 to 31-Oct-2026 (old_news.php, criteria=3): FY2026 results and no dividend (27-Oct-2026), Q1-Q3 FY2026 results, CRISL ratings (12-Jan-2025, 22-Apr-2026), preference-share decision (22-Dec-2024) and BSEC refusal (19-Jun-2025), NOA notices (18-Feb-2025, 24-Nov-2025), company secretary (6-Oct-2026) · link · accessed 2026-10-31
  8. Mir Akhter Hossain Limited letter to BSEC, 'Submission of Material Information' (LGED NOA of 29-Oct-2025), dated 23-Nov-2025, DSE annexure · link · accessed 2026-10-31
  9. DSE dissemination of the auditor's qualified opinion for the year ended 30-Jun-2025 (G. Kibria & Co.) · link · accessed 2026-10-31
  10. AnalystBro market data: DSE daily and monthly bars for MIRAKHTER to 29-Oct-2026 · link · accessed 2026-10-31
  11. Bangladesh Building Systems PLC audited financial statements, year to 30-Jun-2025 (peer; statements p.12-13) · link · accessed 2026-10-31
  12. Dominage Steel Building Systems Limited audited financial statements, year to 30-Jun-2025 (peer; statements p.10-11) · link · accessed 2026-10-31
  13. The Daily Star, 'Bangladesh gets 3 more years for LDC graduation', 30 Oct 2026 · link · accessed 2026-10-31
  14. The Business Standard, 'Bangladesh gets 3 more years for LDC graduation', 30 Oct 2026 · link · accessed 2026-10-31
  15. AnalystBro history and ratio model for MIRAKHTER (model.xlsx, the workbook below) · link · accessed 2026-10-31
  16. Mir Akhter Hossain Limited Annual Report 2019, year to 30-Jun-2019 (statement of cash flows, cost notes, dividend history; corpus MIRAKHTER_ANNUAL_2019) · link · accessed 2026-11-04
  17. Mir Akhter Hossain Limited Annual Report 2020, year to 30-Jun-2020 (statement of cash flows, direct expenses; corpus MIRAKHTER_ANNUAL_2020) · link · accessed 2026-11-04
  18. DSE news archive for MIRAKHTER, 3-Nov-2021 to 30-Sep-2024 (old_news.php, criteria=3, stored copy) · link · accessed 2026-11-04
  19. UN Comtrade: partners' exports to Bangladesh (mirror), HS 7204 ferrous scrap and HS 252310 clinker, annual unit values · link · accessed 2026-11-04
  20. World Bank Commodity Price Data (Pink Sheet), monthly: Brent crude · link · accessed 2026-11-04
  21. Bangladesh Bank: BDT per USD, monthly average (NSDP) · link · accessed 2026-11-04
  22. Bangladesh Bank: policy (repo) rate decisions (MPS / MPC) and Scheduled Banks Statistics weighted-average lending rate (Table-102) · link · accessed 2026-11-04
  23. Bangladesh Bank Major Economic Indicators (private-sector credit) and BBS consumer price index via BB NSDP · link · accessed 2026-11-04
  24. Board decision to form Mir Steel Mills Limited, 24-Mar-2022 (company PSI, corpus MIRAKHTER_PSI_2022_5) · link · accessed 2026-11-04
  25. FAMES & R, auditor's report on utilisation of IPO proceeds, 2023 (corpus MIRAKHTER_PSI_2023) · link · accessed 2026-11-04
  26. DSEX index closes to 2-Nov-2026 (AnalystBro DSE feed, pipeline sector_data) · link · accessed 2026-11-04

Revision history

  • 04-Nov-2026: Summarised raw event/data tables; added chart findings (this version)
  • 04-Nov-2026
  • 31-Oct-2026

Disclaimer

This article is published by AnalystBro for information and education only. It is not investment, financial, legal or tax advice, not an offer or solicitation to buy or sell any security, and not a recommendation. It is based on company filings, official statistics and the sources cited, and was independently reviewed before publishing; it may still contain errors or omissions, and the data and estimates can be out of date. Fair values, forecasts and the model are estimates under stated assumptions, not predictions; past results don't indicate future returns.

AnalystBro, its owners and staff accept no responsibility or liability for any loss or damage arising from the use of, or reliance on, this article, its model or its data. Do your own research and consult a licensed adviser before making investment decisions. Any changes you make in the spreadsheet view stay in your browser and are your own.