Doreen Power financial analysis: HFO capacity payments, falling finance cost and BDT 6.3bn of related-party balances (Oct 2026)
Doreen Power: three HFO plants under BPDB contracts to 2031-2037, EPS BDT 5.03 in FY2026, and BDT 6.3bn lent to sister concerns
The gas plants are gone; profit now comes from 225 MW of HFO plants running at about a third of capacity. Finance cost fell, but the current account with group companies rose to 61% of equity while BDT 13.0bn of bank borrowings stayed on the books.
For information only, not investment advice. AnalystBro accepts no responsibility for decisions made on it. Full disclaimer.
- Doreen's own three 22 MW gas plants stopped when their PPAs ended in Nov-2023 to Feb-2024; all revenue now comes from three almost wholly owned HFO subsidiaries (225 MW) selling to BPDB [1 p.18] [1 p.19] →
- FY2026 revenue fell 22.3% to BDT 11.70bn, but profit to shareholders rose 57% to BDT 910m (EPS BDT 5.03) as finance expense fell BDT 475m and no impairment was booked [1 p.11] [15] →
- The HFO fleet ran at 32.5% of installed capacity in FY2025; Chandpur (115 MW) earned 57% of FY2025 group revenue [2 p.74] [15] →
- The current account receivable from subsidiaries and sister concerns rose to BDT 6.33bn, 61% of total equity; BDT 3.10bn is owed to the parent by Doreen Power House & Technologies Ltd [1 p.10] [1 p.44] [15] →
- The FY2025 audit was qualified (gratuity) with a going-concern material uncertainty on the parent; the FY2026 opinion is unmodified, with a WPPF emphasis of matter [2 p.122] [1 p.2] →
Investment considerations: contracted HFO plants and lower finance cost, against BDT 6.3bn of related-party balances
Updated 4-Nov-2026: added the business model and industry forces, HFO use per kWh and cost of sales per kWh by plant with Brent, taka and furnace-oil prices, the capacity / energy payment basis, receivables by plant and the late-payment interest claim, the subsidiaries' tax-exemption terms, the FY2026 key audit matters in full, BB policy and lending rates, the CRISL rating path and five years of DSE events; prices are not refreshed (29-Oct-2026 close).
Doreen Power Generations and Systems Limited (DOREENPWR) was set up in 2007 to build gas-fired power plants for state buyers and listed on the Dhaka and Chittagong exchanges on 30-Mar-2016 [1 p.18]. Today it operates only through subsidiaries. Its own three 22 MW gas plants at Tangail, Narsingdi and Feni stopped when their 15-year power purchase agreements (PPAs) with the Bangladesh Power Development Board (BPDB) and the Bangladesh Rural Electrification Board (BREB) expired on 11-Nov-2023, 20-Dec-2023 and 15-Feb-2024 [1 p.18]. All group revenue now comes from three subsidiaries that run heavy fuel oil (HFO) plants for BPDB: Dhaka Northern Power Generations (55 MW, 99.40% owned), Dhaka Southern Power Generations (55 MW, 99.145%) and Chandpur Power Generations (115 MW, 99.90%) [1 p.18].
With the parent owning almost all of each subsidiary, minority holders took only BDT 4.2m of FY2026 profit after tax of BDT 914.5m [1 p.11]. The subsidiaries' PPAs run to 16-Jun-2031, 16-Aug-2031 and 10-Feb-2037 [1 p.19], and the company states that its group companies are exempt from income tax [2 p.61]; current tax was BDT 3.0m in FY2026 [1 p.11]. On the other side, the group carries bank borrowings of BDT 13.0bn, finance expense took 12.9% of revenue in FY2026 [1 p.10] [1 p.11] [15], and BDT 6.33bn sits in current accounts with "subsidiaries and sister concerns" [1 p.10].
FY2026 (year to 30-Jun-2026) is audited and in our corpus. Revenue fell from BDT 15.06bn to BDT 11.70bn, with the notes giving "decrease in demand for electricity from customer" at Dhaka Southern and Chandpur as the reason [1 p.36]. Gross profit fell from BDT 3.20bn to BDT 2.69bn, yet profit to shareholders rose from BDT 579m to BDT 910m: finance expense fell from BDT 1.98bn to BDT 1.50bn, which the notes attribute to lower exchange loss and lower loan balances, and FY2025 had carried a BDT 410m impairment on the Narsingdi plant [1 p.11] [1 p.37]. The board recommended a 15% cash dividend for shareholders other than sponsors and directors [1 p.46] [8].
Strengths in the filings
- Contracted life: the three HFO plants' PPAs with BPDB run to June 2031, August 2031 and February 2037 [1 p.19].
- Almost all profit reaches shareholders: non-controlling interest was BDT 4.2m of BDT 914.5m in FY2026 (0.5%) [1 p.11].
- Finance expense fell from BDT 2,805m in FY2023 to BDT 1,504m in FY2026, and operating profit covered it 1.61x against 1.23x [2 p.21] [1 p.11] [15].
- Cash conversion: operating cash flow was BDT 3,435m in FY2026, 3.8x profit after tax, and customers paid BDT 12.82bn against revenue of BDT 11.70bn [1 p.13] [15].
- Bank borrowings fell from BDT 19.1bn (June 2022) to BDT 13.0bn (June 2026) and borrowings/total equity from 2.21x to 1.25x [7 p.95] [1 p.10] [15].
Weaknesses in the filings
- Related-party lending: the current account receivable with subsidiaries and sister concerns rose from BDT 2.06bn (June 2023) to BDT 6.33bn (June 2026), 61% of total equity [6 p.127] [1 p.10] [15].
- Cash out to group companies: BDT 1,975m was paid to subsidiaries and sister concerns in FY2026, 57% of operating cash flow [1 p.13] [15].
- Low dispatch: the HFO fleet ran at 26.5% of installed capacity in FY2024 and 32.5% in FY2025 [6 p.72] [2 p.74] [15]; FY2026 revenue fell 22.3% [1 p.11].
- Short-term funding: short-term loans were BDT 7.73bn, 59.4% of bank borrowings, at June 2026 [1 p.34] [15].
- Audit history: the FY2025 opinion was qualified for unrecognised gratuity at the subsidiaries and carried a material uncertainty on the parent's going concern [2 p.122]; the subsidiaries "decided not to make any further provision for Workers Profit Participation Fund (WPPF)" [1 p.2].

DOREENPWR closed Oct-2026 at BDT 32, up from BDT 27.3 in Oct-2025.
| Item | Value |
|---|---|
| Price (29-Oct-2026) | BDT 32.0 |
| 52-week range (intraday) | BDT 24.5-36.5 |
| Market cap | BDT 5.80bn |
| Shares | 181.1m |
| Sponsor (30-Jun-2026) | Asian Entech Power Corporation Ltd 63.54%; sponsors/directors 120.64m shares |
| FY2026 EPS (consolidated, audited) | BDT 5.03 (FY2025: 3.19) |
| P/E on FY2026 EPS | 6.4x |
| NAV per share (30-Jun-2026) | BDT 57.12 |
| P/B | 0.56x |
| FY2026 dividend | 15% cash (BDT 1.50) to general shareholders only; BDT 90.72m |
| Bank borrowings (30-Jun-2026) | BDT 13.0bn; cash BDT 0.15bn |
| Related-party current account receivable | BDT 6.33bn (30-Jun-2026) |
| Fiscal year end | 30 June |
| Auditor (FY2026) | Hoda Vasi Chowdhury & Co (unmodified, emphasis of matter on WPPF) |
| Next event | Record date 12-Nov-2026; AGM 24-Dec-2026 |
Business: the gas plants are closed and sold; three HFO subsidiaries under 15-year BPDB contracts remain
Doreen's first business was three 22 MW gas engines on build-own-operate terms: Tangail (commercial operation 12-Nov-2008), Narsingdi (21-Dec-2008) and Feni (16-Feb-2009), contracted with BPDB for Feni and Tangail and with BREB for Narsingdi [6 p.136]. Each PPA paid a reference capacity price for dependable capacity and a reference energy price for net energy output [6 p.136]. Those plants supplied between 126,435 and 161,114 MWh each a year from FY2021 to FY2023 [7 p.45] [6 p.72].
The second business is the one that remains. In 2012-2013 the group formed Dhaka Northern and Dhaka Southern, each with a 15-year PPA with BPDB for 55 MW net, and both began commercial operation in 2016: Dhaka Southern on 17-Jun-2016 and Dhaka Northern on 17-Aug-2016 [1 p.18]. Dhaka Northern's plant is at Singair, Manikganj and Dhaka Southern's at Daulatpur, Nababganj [2 p.182] [2 p.191]. Chandpur Power Generations signed a 15-year PPA with BPDB on 17-Jan-2018 for 115 MW net from an HFO plant at Icholi Ghat, Chandpur, and began commercial operation on 11-Feb-2022 [1 p.18] [2 p.200]. The small minority stakes are held by Rupali Engineers and Traders Ltd in the two Dhaka companies and by Doreen Power House & Technologies Limited (0.10%) in Chandpur [2 p.182] [2 p.191] [2 p.200].
Business model. Doreen sells one product, electricity, to state buyers under 15-year PPAs: revenue "comprises capacity payment and energy payments"; the capacity part is recognised "according to the terms set out in the PPA" and the energy part "is calculated based on electricity delivered" [2 p.150]. Capacity revenue is spread "on a straight line basis over the 15 years term of the PPA", and the gap between capacity payments received and capacity revenue booked sits in deferred revenue [2 p.150] [2 p.151]. In FY2026 Chandpur earned BDT 6,012m (51.4% of revenue), Dhaka Northern BDT 3,369m (28.8%) and Dhaka Southern BDT 2,316m (19.8%) [1 p.36] [15]. Inputs are HFO, lube oil and spare parts; the directors' SWOT table lists "Dependency on imported fuel and spare parts", and the risk section names furnace-oil and spare-part purchases in "Euro and US Dollars" as the currency risk, unhedged [2 p.60] [2 p.75]. Installed capacity is 225 MW [2 p.17]. Funding is bank debt (BDT 13.0bn at June 2026) backed by BDT 15,640m of parent corporate guarantees [1 p.10] [1 p.43]. Control sits with Asian Entech Power Corporation Ltd (63.538%) [1 p.30].
Industry forces, as the filings describe them. Buyers: "Government is the only customer of the product" [2 p.60], and sales go to BPDB and BREB "under the conditions of Power Purchase Agreements" [2 p.74]. Suppliers: imported fuel and spare parts [2 p.60]; the directors also say the group faces "difficulties in importing fuels and spare parts for working capital shortage which is the result of abnormal delay in revenue bill payment by customer" [2 p.19]. Entry and renewal: the threats listed include "Uncertainty in extension of the Power Purchase Agreement (PPA) after expiry" [2 p.60]. Incentives: under the private power policy the group lists 15-year corporate income-tax exemption and duty-free import of plant and spares [2 p.73]. Substitutes: "Renewable energy projects (Solar plant) may impact the demand for furnace oil-based electricity" [2 p.60]. Rivalry: none disclosed.
The company applied to renew all three PPAs; BREB first consented to continued operation of Narsingdi on a "No Electricity, No Payment Basis" while terms were negotiated, then sent a cancellation letter on 11-Mar-2025 [2 p.20]. The board wrote the gas plants down to forced-sale value: the chairman's statement gives an impairment of BDT 916.6m in FY2024 for Feni and Tangail and BDT 409.9m in FY2025 for Narsingdi [2 p.20]; the consolidated statement shows impairment of BDT 413.8m in FY2024 after use of the earlier revaluation surplus, and BDT 409.9m in FY2025 [2 p.77]. Feni and Tangail machinery was sold, and on 24-Feb-2026 the board approved a vendor agreement with KPI Trading to sell the Narsingdi plant for BDT 102m, as carried on DSE on 25-Feb-2026 [8]. The notes are not consistent on Narsingdi: one says the company "has already sold all the non-current assets of three Power Plants excluding land" [1 p.19], another that Narsingdi machinery "will be sold soon" [1 p.30]. The remaining assets held for sale, mainly the Tangail and Feni land, were BDT 216.5m at June 2026, and the notes say a sale "is expected by December 2026" [1 p.30]. The company does not plan to extend the BREB land lease at Narsingdi [1 p.22].
The third step is legal. On 07-Jun-2026 the board approved a scheme to amalgamate the three subsidiaries into the listed parent, paying cash to the subsidiaries' minority shareholders and issuing no shares [1 p.18] [8]. The High Court Division admitted the scheme on 18-Aug-2026 (Company Matter No. 973 of 2026) and directed meetings of members and creditors; the scheme also needs BSEC approval and the court's sanction [1 p.19] [8]. The parent had 17 permanent employees at June 2026 against 52 a year earlier [1 p.45].
| Plant (company, % owned) | Fuel / MW | Buyer | Commercial operation | PPA end / status |
|---|---|---|---|---|
| Dhaka Northern (99.40%) | HFO / 55 | BPDB | 17-Aug-2016 | 16-Aug-2031 |
| Dhaka Southern (99.145%) | HFO / 55 | BPDB | 17-Jun-2016 | 16-Jun-2031 |
| Chandpur (99.90%) | HFO / 115 | BPDB | 11-Feb-2022 | 10-Feb-2037 |
| Tangail (parent) | Gas / 22 | BPDB | 12-Nov-2008 | Ended 11-Nov-2023; machinery sold |
| Narsingdi (parent) | Gas / 22 | BREB | 21-Dec-2008 | Ended 20-Dec-2023; cancelled 11-Mar-2025; sale agreed Feb-2026 |
| Feni (parent) | Gas / 22 | BPDB | 16-Feb-2009 | Ended 15-Feb-2024; machinery sold |
| Subsidiary | Paid-up capital (BDT mn) | Net assets Jun-2026 (BDT mn) | Minority holder |
|---|---|---|---|
| Dhaka Northern | 1130.45 | 4512.52 | Rupali Engineers and Traders Ltd (0.60%) |
| Dhaka Southern | 793.5 | 4405.56 | Rupali Engineers and Traders Ltd (0.855%) |
| Chandpur | 2250.0 | 3168.04 | Doreen Power House & Technologies Ltd (0.10%) |
Dispatch: the HFO fleet ran at 33% of capacity in FY2025 and Chandpur earns over half the revenue
For an HFO plant on a BPDB contract, volume depends on dispatch: BPDB calls the plant when it needs it. Group net output was 1,268,221 MWh in FY2022 and 1,305,445 MWh in FY2023, then 719,334 MWh in FY2024 and 641,114 MWh in FY2025 [7 p.45] [6 p.72] [2 p.74] [15]. Part of the fall is the gas plants closing, but the HFO plants also ran less: their combined output fell from 893,764 MWh in FY2023 to 521,648 MWh in FY2024 before recovering to 641,114 MWh in FY2025 [15]. The FY2025 directors' report describes the HFO plants as "available to generate and supply to the extent required as per the Power Purchase Agreement" [2 p.74].
Measured against installed capacity (MW x 8,760 hours, the figure the directors' report prints), the FY2025 plant factors were 28.2% at Dhaka Northern, 24.1% at Dhaka Southern and 38.6% at Chandpur [2 p.74] [15]. In FY2022 the two Dhaka plants ran at 61.8% and 63.9% [7 p.45] [15]. FY2026 output by plant is not in the audited FY2026 statements, and the full FY2026 annual report is not in our corpus at 4-Nov-2026; the statements say only that Dhaka Southern and Chandpur sold less because of lower demand [1 p.36].

The HFO fleet plant factor was 32.53% in FY25, against 48.75% in FY21; Chandpur ran at 38.6%.

Gas plants produced no output in FY25; Chandpur produced 388,865 MWh, the largest of the plants.
Revenue per kWh has risen. At Dhaka Northern it rose from BDT 11.40 in FY2021 to BDT 24.95 in FY2025, and at Dhaka Southern from BDT 11.35 to BDT 26.23 [15]. The FY2025 directors' report links the FY2025 revenue gain to higher demand from BPDB and the rise in cost of sales to "increase in furnace oil consumption as well as furnace oil price" [2 p.20]. Neither the FY2025 annual report nor the FY2026 statements split revenue into capacity and energy payments, give the tariff per kWh, or say what share of the tariff is linked to the US dollar (searched AR2025 notes p.145-175, subsidiary reports p.182-215, FY2026 notes p.18-46). The directors' reports do tie part of it to the dollar: gross profit rose faster than revenue in FY2023 "because of positive impact of exchange rate on capacity payment portion of revenue bill" [16 p.55], from "higher capacity revenue received for devaluation of Bangladeshi Taka against US Dollar" [16 p.60], and the FY2024 report uses the same words [6 p.73]. The auditor tested revenue against "schedule 5 of PPA price list" without printing it [1 p.4]. At commercial operation Chandpur said it "will generate approximately BDT 1,102.22 Crore revenue per year (as per PPA)" [25]; it booked BDT 8,620.7m in FY2025 and BDT 6,011.9m in FY2026 [1 p.36]. Deferred revenue, the excess of capacity payments received over capacity revenue booked, rose by BDT 48.7m in FY2025 [2 p.169].
Fuel. The directors' plant tables give HFO burned by plant. HFO per kWh sent out was 193-205 grams at all three plants in each year from FY2022 to FY2025; at Chandpur it was 192.7 g in FY2022 and 200.4 g in FY2025 [16 p.59] [2 p.74] [15]. The HFO plants burned 176,785 tonnes in FY2023, 103,363 in FY2024 and 128,864 in FY2025 [15]. Cost of sales per kWh in FY2025 was BDT 18.16 at Chandpur, BDT 18.79 at Dhaka Northern and BDT 19.33 at Dhaka Southern [1 p.36] [2 p.74] [15]. The filings do not split cost of sales into fuel and other costs, name the HFO supplier, or say how fuel cost is passed through to BPDB (searched AR2025 and FY2026 notes). The FY2025 annual report prints a second FY2025 table with higher generation but lower HFO use (Chandpur 397,146 MWh and 77,312 tonnes, against 388,865 MWh and 77,919 tonnes on p.74) without saying whether its figures are gross or net [2 p.44] [2 p.74].
| FY2022 | FY2023 | FY2024 | FY2025 | |
|---|---|---|---|---|
| Dhaka Northern: HFO (tonnes) | 59,297 | 43,688 | 21,651 | 27,165 |
| Dhaka Southern: HFO (tonnes) | 59,469 | 41,865 | 21,061 | 23,780 |
| Chandpur: HFO (tonnes) | 39,562 | 91,232 | 60,651 | 77,919 |
| Dhaka Northern: grams per kWh | 199.20 | 199.40 | 194.90 | 199.80 |
| Dhaka Southern: grams per kWh | 193.10 | 201.10 | 203.70 | 204.50 |
| Chandpur: grams per kWh | 192.70 | 195.50 | 197.40 | 200.40 |
| Chandpur: cost of sales per kWh (BDT) | — | — | — | 18.16 |
Fuel and currency prices. Brent averaged USD 91.08 a barrel in FY2022, USD 74.57 in FY2025 and USD 79.42 in FY2026, and USD 116.8 in September 2026 [19] [15]. The taka averaged BDT 86.30 per US dollar in FY2022 and BDT 122.30 in FY2026, and was BDT 122.85 at end-June 2026 [20] [15]; in taka, Brent averaged BDT 7,860 a barrel in FY2022 and BDT 9,713 in FY2026 [15]. BERC set the furnace-oil price for BPDB, power plants and industry at Tk 96.86 a litre from 6-Sep-2026 under its monthly Platts-linked order, and BPC lists Tk 108.78 from 1-Oct-2026; earlier furnace-oil prices are not in our data at 4-Nov-2026 [24]. The FY2025 directors' report attributes the 17.47% rise in cost of sales to "increase in furnace oil consumption as well as furnace oil price" [2 p.20].
| FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | |
|---|---|---|---|---|---|---|---|
| Brent (USD/bbl) | 51.62 | 54.12 | 91.08 | 86.82 | 84.72 | 74.57 | 79.42 |
| BDT per USD (average) | 84.79 | 84.81 | 86.30 | 99.46 | 111.06 | 120.44 | 122.30 |
| BDT per USD (end-June) | 84.90 | 84.81 | 93.45 | 106.00 | 118.00 | 122.78 | 122.85 |
| Brent in BDT per bbl (derived) | 4,377 | 4,590 | 7,860 | 8,635 | 9,409 | 8,981 | 9,713 |
Why HFO output fell in FY2024. The FY2024 annual report gives the reason as "demand for electricity from three subsidiary companies were lower than last year" [6 p.17]; whether BPDB paid full capacity payments in that year is not disclosed (searched AR2024 and AR2025 revenue notes).

Chandpur revenue was BDT 6,012 mn in FY26, down from BDT 8,621 mn; gas plants had no revenue in FY25-FY26.

Revenue per kWh rose from BDT 11.4 in FY21 to BDT 24.95 in FY25 at Dhaka Northern; Chandpur was BDT 22.17.
Line items: revenue BDT 11.70bn in FY2026; finance expense BDT 1.50bn, down BDT 1.30bn from FY2023
Revenue. Group revenue was BDT 4.75bn in FY2020, rose to BDT 18.43bn in FY2023, Chandpur's first full year of operation, and was BDT 11.70bn in FY2026 [2 p.77] [2 p.21] [1 p.11]. In FY2026 Dhaka Northern held its revenue at BDT 3,369m (FY2025: 3,393m), while Dhaka Southern fell 24.1% to BDT 2,316m and Chandpur fell 30.3% to BDT 6,012m [1 p.36] [15]. Every BDT 1bn of revenue lost at Chandpur in FY2026 came with BDT 0.94bn less cost of sales [1 p.36] [15].
Cost of sales and gross margin. Cost of sales is mostly HFO, lubricants and plant operation, and has run at 72-79% of revenue in each year from FY2018 to FY2026 [7 p.17] [2 p.21] [1 p.11]. The group gross margin was 23.0% in FY2026 against 21.2% in FY2025 and a nine-year range of 20.6% to 27.9% [15]. By plant, Chandpur's margin rose from 18.1% to 23.3% while the two Dhaka plants' margins fell from 24.7% to 21.9% and from 26.3% to 23.9% [1 p.36] [15]. Depreciation in the cash-flow reconciliation rose from BDT 952m to BDT 1,309m [1 p.40] while plant spending was BDT 601m [1 p.13]; the depreciation policy is straight-line "over their estimated useful lives" [1 p.21], and the notes do not explain the increase or tie plant lives to the PPA end dates, and do not say what the BDT 601m of plant spending bought (searched FY2026 notes p.21, p.26-27 and p.40, the cash-flow statement p.13). The interim statements and the DSE posts of 29-Jan-2026 and 30-Apr-2026 give reasons for EPS and NOCFPS only, and none for the quarterly gross margin of 17.5% in Q1, 34.0% in Q3 and 16.1% in Q4 FY2026 (searched DOREENPWR_QUARTERLY_Q2_2025, _Q3_2026 notes). The notes give no reason for the different margin moves by plant beyond lower demand at Dhaka Southern and Chandpur [1 p.36].
General and administrative expenses were BDT 267m in FY2026 against BDT 228m, and the notes say the subsidiaries' G&A "increased significantly due to recognition of newly approved Gratuity Fund provision during the year" [1 p.11] [1 p.37]. That is the item behind the FY2025 audit qualification [2 p.122]. The parent's own G&A fell from BDT 58.4m to BDT 26.1m, and its salaries and allowances from BDT 24.4m to BDT 14.4m [1 p.15] [1 p.36].
Finance expense rose from BDT 344m in FY2021 to BDT 2,805m in FY2023, then eased to BDT 2,179m, BDT 1,979m and BDT 1,504m [2 p.21] [1 p.11]. In January 2025 the company attributed higher subsidiary finance cost to "increase of interest rate on bank loans as well as increased exchange loss for devaluation of BDT against US Dollar" [8]. For FY2026 the notes give two reasons at Dhaka Southern and Chandpur: "decrease in foreign exchange loss for stabilization of exchange rate" and "decrease in interest on loan for decrease in outstanding loan amount" [1 p.37]. The DSE results posts for FY2023 blamed "significant devaluation of BDT against USD" [25], and the FY2026 Q2 post "stable exchange rate of BDT against US Dollar and Euro" [27]; for FY2023 the directors put the exchange loss at "Tk.1,117.01 million" of the BDT 2,805m finance expense [16 p.60]; for the other years the split into exchange loss and interest is not printed (searched AR2023 p.142, AR2024 p.161, AR2025 p.166, FY2026 p.37). Bangladesh Bank's policy rate went from 4.75% (Jul-2020) to 10.00% (Oct-2024) and to 9.50% on 30-Jul-2026 [21]; the banks' weighted average lending rate was 7.24% at June 2022, 11.70% at June 2024 and 12.13% at June 2026 [22]. Chandpur alone carried BDT 880m of the three plants' BDT 1,504m finance expense in FY2026 [1 p.37]. Finance expense was 15.2% of revenue in FY2023 and 12.9% in FY2026; the owners' margin was 3.5% and 7.8% in the same years [15].
| Jun-2020 | Jun-2021 | Jun-2022 | Jun-2023 | Jun-2024 | Jun-2025 | Jun-2026 | |
|---|---|---|---|---|---|---|---|
| Weighted average lending rate, end-June (%) | 8.03 | 7.43 | 7.24 | 7.34 | 11.70 | 12.33 | 12.13 |
Other lines. Non-operating income was a loss of BDT 1.8m in FY2026, mostly the BDT 7.6m loss on selling Narsingdi assets [1 p.37]. There was no impairment in FY2026, after BDT 413.8m in FY2024 and BDT 409.9m in FY2025 [1 p.11] [2 p.77]. Owners' profit plus those impairments was BDT 741m in FY2024 and BDT 988m in FY2025 [15]. Income tax is small because the group's companies are exempt from corporate income tax [2 p.61]; the parent's own exemption ended on 15-Feb-2024 [1 p.32], and it has had no revenue since. For the subsidiaries the FY2025 annual report says Dhaka Northern and Dhaka Southern "have enjoyed 9 years tax exemption period each and another subsidiary CPGL has enjoyed 3.5 years tax exemption out of its 14 years exception period" [2 p.73]; the end date of each exemption, and how the merger treats it, are not disclosed (searched FY2026 notes 3.9 and 1.3). Minority interest took 0.5% of profit [1 p.11].
| Line | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|
| Revenue | 6,660 | 7,022 | 4,746 | 6,657 | 15,024 | 18,430 | 13,333 | 15,063 | 11,697 |
| Gross profit | 1,410 | 1,505 | 1,326 | 1,656 | 3,094 | 3,963 | 3,231 | 3,197 | 2,690 |
| General & admin | 119 | 117 | 138 | 142 | 309 | 510 | 292 | 228 | 267 |
| Operating profit | 1,291 | 1,388 | 1,187 | 1,514 | 2,785 | 3,453 | 2,939 | 2,970 | 2,423 |
| Financial expenses | 461 | 465 | 386 | 344 | 1,111 | 2,805 | 2,179 | 1,979 | 1,504 |
| Impairment (gas plants) | 0 | 0 | 0 | 0 | 0 | 0 | 414 | 410 | 0 |
| Profit to owners | 829 | 918 | 798 | 1,169 | 1,668 | 644 | 328 | 578 | 910 |
| EPS as reported (BDT) | 7.14 | 7.91 | 6.08 | 8.09 | 10.31 | 3.56 | 1.81 | 3.19 | 5.03 |

Financial expenses fell from BDT 2,805 mn in FY23 to BDT 1,504 mn in FY26; operating profit was BDT 2,423 mn.
| Item | FY2025 | FY2026 |
|---|---|---|
| Dhaka Northern revenue | 3,393 | 3,369 |
| Dhaka Northern gross margin | 24.7% | 21.9% |
| Dhaka Northern finance expenses | 409 | 401 |
| Dhaka Southern revenue | 3,050 | 2,316 |
| Dhaka Southern gross margin | 26.3% | 23.9% |
| Dhaka Southern finance expenses | 317 | 223 |
| Chandpur revenue | 8,621 | 6,012 |
| Chandpur gross margin | 18.1% | 23.3% |
| Chandpur finance expenses | 1,251 | 880 |
| Parent net loss after tax | -476 | -34 |
FY2026 results: EPS BDT 5.03 on 22% less revenue, every quarter profitable
FY2026 profit to shareholders was BDT 910.3m (EPS BDT 5.03), against BDT 578.5m (BDT 3.19) [1 p.11] [1 p.39]. The board approved the statements on 08-Oct-2026 and DSE carried the results on 11-Oct-2026 with NAV per share of BDT 57.12 and operating cash flow of BDT 18.96 a share [1 p.19] [8]. Every quarter was profitable. Discrete EPS was BDT 1.81, 1.24 and 1.11 in the first three quarters as reported [5 p.3] [4 p.3] [3 p.3], and the fourth quarter, derived as the year less nine months, was BDT 0.86 [15].
The quarterly pattern repeats across both years. The first quarter (July-September) carries the most revenue: BDT 4,928m in Q1 FY2026 against BDT 2,039m to 2,491m in each later quarter [15]. Gross margin moves the other way, from 17.5% in Q1 FY2026 to 34.0% in Q3 and 16.1% in Q4 [15]. Finance expense fell in every quarter of FY2026 against the same quarter of FY2025 [15]. The fourth quarter of FY2025 included the BDT 409.9m Narsingdi impairment, and its profit was BDT 26.9m [2 p.76] [15].
| Line | Q1 FY25 | Q2 FY25 | Q3 FY25 | Q4 FY25 | Q1 FY26 | Q2 FY26 | Q3 FY26 | Q4 FY26 |
|---|---|---|---|---|---|---|---|---|
| Revenue | 5,230 | 2,627 | 2,816 | 4,390 | 4,928 | 2,239 | 2,039 | 2,491 |
| Gross profit | 912 | 843 | 774 | 668 | 861 | 735 | 694 | 401 |
| Financial expense | 576 | 698 | 529 | 176 | 482 | 460 | 430 | 132 |
| Profit to shareholders | 268 | 96 | 188 | 27 | 327 | 225 | 201 | 157 |
| EPS (BDT) | 1.48 | 0.53 | 1.04 | 0.15 | 1.81 | 1.24 | 1.11 | 0.86 |

Discrete quarterly EPS was BDT 0.86 in Q4 FY26, after BDT 1.81 in Q1 FY26.
Ratios: ROE fell from 15-21% (FY2019-22) to 9% as finance cost rose; margins held
Nine years of ratios show two regimes. From FY2018 to FY2022, with the gas plants running and finance cost at 5-8% of revenue, ROE on owners' equity ran at 14.5% to 21.4% and owners kept 11-18% of revenue [15]. From FY2023 to FY2026, with Chandpur debt and higher rates, ROE was 7.3%, 3.6%, 6.3% and 9.2%, and the owners' margin 3.5% to 7.8% [15]. Operating margins were in a similar range in both periods: 18.5%-25.0% in FY2018-FY2022 and 18.7%-22.0% in FY2023-FY2026 [15].
Coverage tells the same story: operating profit covered finance expense 4.4x in FY2021, 1.23x in FY2023 and 1.61x in FY2026 [15]. On EBITDA (gross operating profit plus depreciation), net debt was 3.4x EBITDA in FY2026 against 3.5x in FY2025 [15]. Total liabilities fell from 2.33x owners' equity in FY2022 to 1.40x in FY2026 [15]. Return on average total assets was 3.6% in FY2026 against 5.7-6.6% in FY2019-FY2022 [15].
| Ratio | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|
| Revenue growth | — | 5.4% | -32.4% | 40.2% | 125.7% | 22.7% | -27.7% | 13.0% | -22.4% |
| Gross margin | 21.2% | 21.4% | 27.9% | 24.9% | 20.6% | 21.5% | 24.2% | 21.2% | 23.0% |
| Operating margin | 19.4% | 19.8% | 25.0% | 22.7% | 18.5% | 18.7% | 22.0% | 19.7% | 20.7% |
| Financial expenses / revenue | 6.9% | 6.6% | 8.1% | 5.2% | 7.4% | 15.2% | 16.3% | 13.1% | 12.9% |
| Operating profit / financial expenses (x) | 2.80 | 2.99 | 3.07 | 4.40 | 2.51 | 1.23 | 1.35 | 1.50 | 1.61 |
| Owners' profit margin | 12.4% | 13.1% | 16.8% | 17.6% | 11.1% | 3.5% | 2.5% | 3.8% | 7.8% |
| ROE (average owners' equity) | — | 19.4% | 14.5% | 18.2% | 21.4% | 7.3% | 3.6% | 6.3% | 9.2% |
| Return on average assets | — | 6.6% | 5.7% | 6.6% | 6.7% | 2.3% | 1.3% | 2.3% | 3.6% |
| Total liabilities / owners' equity (x) | 2.15 | 1.77 | 1.36 | 2.07 | 2.33 | 1.94 | 1.75 | 1.62 | 1.40 |

Gross margin was 23% in FY26; owners' margin recovered to 7.78% from 2.46% in FY24.

ROE was 9.18% in FY26 against 21.4% in FY22; financial expenses were 12.86% of revenue.
| Item | FY2025 | FY2026 |
|---|---|---|
| Gross operating profit (BDT mn) | 2,970 | 2,423 |
| Depreciation (BDT mn) | 952 | 1,309 |
| EBITDA (BDT mn) | 3,922 | 3,732 |
| Financial expenses (BDT mn) | 1,979 | 1,504 |
| Gross operating profit / financial expenses (x) | 1.50 | 1.61 |
| Net debt / EBITDA (x) | 3.54 | 3.45 |
Balance sheet: BDT 13.0bn of bank debt, receivables at 169 days, and an unmodified FY2026 audit after a qualified FY2025
Debt. Bank borrowings were BDT 13.02bn at June 2026: long-term loans of BDT 4.22bn, a current portion of BDT 1.07bn and short-term loans of BDT 7.73bn [1 p.10] [1 p.32] [1 p.34]. Chandpur holds BDT 3.20bn of the long-term loans and BDT 4.03bn of the short-term loans [1 p.32] [1 p.34]. Borrowings peaked at BDT 19.1bn in June 2022 [7 p.95] [15]. Short-term loans were BDT 9.24bn at March 2026 and BDT 7.73bn at June 2026 [3 p.2] [1 p.10]. The parent has given corporate guarantees to banks for its subsidiaries totalling BDT 15,640m: BDT 3,970m for Dhaka Northern, BDT 4,570m for Dhaka Southern and BDT 7,100m for Chandpur, including BDT 5,000m to Dhaka Bank [1 p.43]. Cash was BDT 152.7m at June 2026 [1 p.10]. The FY2025 guarantee table names the banks: for Dhaka Northern, Trust Bank BDT 3,670m and Islami Bank BDT 300m; for Dhaka Southern, NCC Bank BDT 4,270m and Islami Bank BDT 300m; for Chandpur, Dhaka Bank BDT 5,000m, Sonali Bank BDT 1,500m, SABINCO BDT 300m and Islami Bank BDT 300m [2 p.172]; the short-term loans' rates, purpose and the reason they doubled to BDT 10.35bn at June 2022 are not disclosed, though the September 2022 DSE post tied cash flow that year to receivables and "closing inventory value for fuel price increase international market" [25].
Receivables. Trade and other receivables were BDT 5.42bn at June 2026, 169 days of revenue, down from BDT 6.49bn (157 days) a year earlier and from 227 days at June 2022 [1 p.10] [15]. Customers paid BDT 12.82bn in FY2026, 109.6% of revenue [1 p.13] [15]. The auditor puts the BPDB and BREB part at BDT 5,405m [1 p.5]. The parent did not charge BPDB and BREB the late-payment interest its PPAs allow "considering the strategic reasons for last 15 years"; in FY2025 it invoiced that interest, and the FY2026 notes show it as a contingent asset, not recognised [1 p.28] [1 p.44]. The parent still owes Titas Gas and Bakhrabad Gas BDT 613.6m of gas bills, all past due over 91 days [1 p.33].
By company, receivables at June 2026 were BDT 2,942.4m at Chandpur, BDT 1,473.6m at Dhaka Northern, BDT 952.1m at Dhaka Southern and BDT 47.5m at the parent, against BDT 3,048.1m, 1,899.7m, 1,443.7m and 93.7m a year earlier [1 p.28] [2 p.155]. Only the parent's receivables are aged, all "more than 90 days" [1 p.28]; the subsidiaries' ageing is not printed. The late-payment interest claimed under PPA clause 13.3, at "the bank rate", is BDT 152.0m and covers the parent's gas plants only: BDT 81.4m for Feni and BDT 63.0m for Tangail billed to BPDB, and BDT 7.7m for Narsingdi billed to BREB, status "Bill submitted and pursuation going on" [1 p.44]. No settlement of BPDB dues in special bonds is disclosed (searched FY2025 and FY2026 notes). DSE results posts have tied cash-flow swings to "delay in payment of revenue bills by BPDB" (Sep-2022), "abnormal delay" (Jan-2023), recovery (Oct-2023, Apr-2024) and lower receipts (Nov-2024, the revised Apr-2025 post, Apr-2026) [25] [26] [27]. The unpaid gas bills date from the gas plants, which paid the power-plant gas tariff of Tk 4.45 per cubic metre from Jul-2019 (BERC order 2019/02), Tk 14.00 from Feb-2023 (SRO 14-Ain/2023) and Tk 14.75 from Feb-2024 (SRO 40-Ain/2024) [23]; the BERC order of 4-Jun-2022 is not in our data at 4-Nov-2026; why the BDT 613.6m is unpaid is not disclosed [1 p.33].
| Jun-2024 | Jun-2025 | Jun-2026 | |
|---|---|---|---|
| Chandpur | 2,957.74 | 3,048.15 | 2,942.40 |
| Dhaka Northern | 1,164.12 | 1,899.70 | 1,473.58 |
| Dhaka Southern | 1,261.51 | 1,443.69 | 952.09 |
| Parent (all over 90 days past due) | 305.80 | 93.73 | 47.51 |
| Total trade and other receivables | 5,689.16 | 6,485.28 | 5,415.58 |
| Interest claimed on late payment (not recognised) | — | 152 | 152 |
| Item | Jun-21 | Jun-22 | Jun-23 | Jun-24 | Jun-25 | Mar-26 | Jun-26 |
|---|---|---|---|---|---|---|---|
| Trade and other receivables | 1,689 | 9,341 | 8,596 | 5,689 | 6,485 | 7,190 | 5,416 |
| Current A/C with subsidiaries and sister concerns | 2,498 | 1,805 | 2,059 | 3,319 | 4,342 | 5,899 | 6,328 |
| Cash and bank | 1,000 | 54 | 84 | 41 | 183 | 41 | 153 |
| Bank borrowings | 13,506 | 19,126 | 16,456 | 14,270 | 14,083 | 14,867 | 13,025 |
| of which short-term loan | 4,757 | 10,348 | 8,950 | 7,686 | 8,160 | 9,245 | 7,731 |
| Total equity | 7,028 | 8,643 | 9,194 | 9,035 | 9,560 | 10,257 | 10,414 |
| Borrowings / total equity (x) | 1.92 | 2.21 | 1.79 | 1.58 | 1.47 | 1.45 | 1.25 |
| Receivable days | 93 | 227 | 170 | 156 | 157 | 214 | 169 |

The related-party current account rose from BDT 1,805 mn at Jun-22 to BDT 6,328 mn at Jun-26; bank borrowings were BDT 13,025 mn.
Cash flow. Operating cash flow was BDT 3,258m, 3,628m, 2,133m and 3,435m in FY2023-FY2026, between 3.6x and 10.9x profit after tax with non-cash depreciation of BDT 952m in FY2025 and BDT 1,309m in FY2026 [2 p.21] [1 p.13] [1 p.40] [15]. In FY2026 the group spent BDT 601m on plant, repaid BDT 629m of long-term loans and BDT 429m of short-term loans, paid BDT 61m of dividends, and paid BDT 1,975m to subsidiaries and sister concerns [1 p.13]. Over FY2023-FY2026 that related-party line took BDT 4.51bn of cash, against BDT 3.48bn of long-term loan repayments [15].
The swings in operating cash flow come from working capital. In FY2024, profit after tax of BDT 332.6m became BDT 3,627.6m of operating cash as receivables released BDT 2,906.4m, partly offset by BDT 1,381.1m more inventory; in FY2025 inventory released BDT 1,011.2m but receivables absorbed BDT 758.6m, and operating cash was BDT 2,132.8m [2 p.169]. In FY2026 profit of BDT 914.5m and depreciation of BDT 1,308.8m were joined by BDT 1,026.5m released from receivables and BDT 17.2m from inventories, for operating cash of BDT 3,434.6m [1 p.40].
| FY2024 | FY2025 | FY2026 | |
|---|---|---|---|
| Profit after tax | 332.63 | 584.84 | 914.49 |
| Depreciation | 1,078.79 | 952.40 | 1,308.84 |
| Inventories | -1,381.06 | 1,011.17 | 17.16 |
| Trade and other receivables | 2,906.36 | -758.57 | 1,026.47 |
| Net cash from operating activities | 3,627.61 | 2,132.81 | 3,434.60 |
| Item | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
| Received from customers | 19,339 | 16,246 | 14,343 | 12,820 |
| Financial expenses paid | -2,862 | -1,998 | -2,036 | -1,456 |
| Net cash from operating activities | 3,257 | 3,628 | 2,133 | 3,435 |
| Acquisition of PPE | — | -109 | -831 | -601 |
| Paid to subsidiaries and sister concerns | -254 | -1,260 | -1,023 | -1,975 |
| Long-term loan repaid | -1,271 | -922 | -661 | -629 |
| Short-term loan, net | -1,487 | -1,327 | 474 | -429 |
| Dividend paid | — | -66 | -61 | -61 |
| CFO / profit after tax (x) | 5.02 | 10.91 | 3.65 | 3.76 |
| Related-party payments, % of CFO | 7.8% | 34.7% | 48.0% | 57.5% |
Audit. The FY2026 auditor, Hoda Vasi Chowdhury & Co, gave an unmodified opinion on the consolidated statements, with an emphasis of matter that the subsidiaries "decided not to make any further provision for Workers Profit Participation Fund (WPPF)" pending a government decision on the power producers' exemption request [1 p.2]. Its six key audit matters are quoted in full in the exhibit below [1 p.3] [1 p.4] [1 p.5] [1 p.6] [1 p.7]. The FY2025 auditor added that management "has not ascertained the amount of Gratuity Fund" [2 p.122]; WPPF provision has been suspended "from 01 April 2017" [1 p.25], and no unprovided WPPF or gratuity amount is printed. Dhaka Northern and Dhaka Southern were audited by ACNABIN and Chandpur by Aziz Halim Khair Choudhury, both unmodified [1 p.7]. For the current accounts it wrote: "Our testing did not identify any major issues" [1 p.6]. A year earlier the same firm gave a "Qualified Opinion" because the subsidiaries "did not establish Gratuity Fund or Compensatory benefits", and added a "Material Uncertainty Related to Going Concern" on the parent after its BDT 476.16m loss [2 p.122] [2 p.124]. The FY2024 statements were audited by ACNABIN [6 p.127], and DSE carried a "Qualified Opinion" and "Emphasis of Matter" notice for FY2024 [8].
| Key audit matter | Auditor's description (quoted in full) | Auditor's conclusion |
|---|---|---|
| Carrying value of PPE and its impairment | PPE includes the Group's long-term assets, which flow economic benefits to the entities more than one year. PPE is measured at cost except land and land development, building and premises, and power plant which are carried at revalued amount. The carrying value of Group's PPE represents significant portion of total assets, which is amounting to Tk. 11,085 million (approximately) at the reporting date. The items of PPE including land and land development, building and premises and power plant were revalued by the professional valuer in 2024 (2nd time) on the basis of applicable methods including market value-based method. Moreover, for the Group, approximately 44% of total assets are represented by PPE. The carrying value of PPE is the function of depreciation charges on cost/ revaluated amount that involved estimation. It is a matter of consideration that the carrying value of PPE may be higher than the recoverable amount and the impairment charges thereon may not have been recognized. Therefore, it has been considered as a significant area of auditor's judgment and requires special attention. | "Our testing did not identify any issues with regard to CV of PPE and any indicators that would trigger impairment." [s1 p.3] |
| Carrying value of assets held for sale | As at 30 June 2026, the Group has classified PPE comprising to land and land developments, Building and premises and Power Plant with a carrying amount of Tk. 216.54 million (approximately) as Assets Held for Sale in accordance with IFRS 5: Non-current Assets Held for Sale and Discontinued Operations in the financial statements. The valuation of the aforesaid assets must be at the lower of its carrying amount and fair value less costs to sell. Determination of fair value less cost to sell involves significant judgement and assumptions particularly in determining the criteria for classification as held for sale, the fair value of the assets, and the estimated cost to sell which may involve estimates and judgement. Given the materiality of the amount involved and the significant judgement and estimation required, it has been considered as a significant area of auditor's judgement and requires special attention. | "Our testing did not identify any issues with regard to Assets held for sale." [s1 p.4] |
| Revenue | At year end, the Group reported total revenue of Tk. 11,696.98 million (approximately) in the financial statements. Revenue is recognized when the performance obligation is satisfied by transferring goods or services to a customer, either at a point in time or over time. Goods or services are transferred when the customer obtains control of it. It is a matter of consideration whether revenue may be misstated due to recognition of sales transaction before performance obligation being satisfied. | "Our testing did not identify any issues with regard to revenue." [s1 p.4] [s1 p.5] |
| Recoverability of outstanding trade receivables | At reporting date 30 June 2026, the balances of outstanding trade receivables of the Group with Bangladesh Power Development Board (BPDB) and Bangladesh Rural Electrification Board (BREB) were amounting to Tk. 5,405 million (approximately) reported in the consolidated financial statements. Assessing the recoverability of outstanding trade receivables requires significant judgement and estimation. Therefore, it has been considered as a key area of audit risk which requires special attention. | "Our testing did not identify any major issues with regard to the recoverability of outstanding trade receivables and any indicators that would trigger impairment at the reporting date." [s1 p.5] |
| Current A/C with subsidiaries and sister concerns | As of 30 June 2026, the balances of Current Account with Subsidiaries and Sister Concern (receivables) of the Group were amounting to Tk. 6,328.42 million (approximately) and the balances of Current Account with subsidiaries and sister concerns (payable) of the Group was amounting to Tk. 11.56 million (approximately). The Current Account balances represent the account, which were maintained to obtain or provide temporary loan up to Tk. 3,000 million with prevailing bank interest rate between parent and subsidiaries and sister concerns. Due to the transactions among the entities are significant in nature and the carrying balances of current account with subsidiaries and sister concerns (receivables) and impairment charges thereon may not have recognized. Therefore, it has been considered as a significant area of auditor's judgement which requires special attention. | "Our testing did not identify any major issues with regard to the balances of the Current Account with subsidiaries and sister concern and any indicators that would trigger impairment at the reporting date." [s1 p.5] [s1 p.6] |
| Review of the amalgamation scheme submitted to the High Court Division | As mentioned in the notes-1.3 and 2.5 of the financial statements, three gas based power plants with 66 MW capacity of the Company have been shut-down in the year 2023 and 2024 and since then the Company generated no revenue from its business. During the year 2026, the Company incurred a net loss of Taka 34 million (approximately) and as of that date, the Company's accumulated losses stood at Taka 49 million (approximately). Recently, the Company has applied for a scheme of amalgamation with the Hon'ble High Court for merging its three subsidiaries with the Company in order to create efficiency and sustainable business structure by consolidating all operating assets and business activities. Upon approval of the scheme by the High Court, the Company and its three subsidiaries will effectively become a single legal entity. Accordingly, management believes that no material uncertainty exists that may cast significant doubt on the Company's operation. As there is an uncertainty regarding the High Court's approval of the scheme, it has been considered as a key area of audit which requires special attention. | "Our testing did not identify any issues with regard to this matter." [s1 p.6] [s1 p.7] |
Related parties: BDT 6.3bn owed by group companies, BDT 3.1bn of it by Doreen Power House & Technologies
The largest related-party item is the "Current A/C (Receivable) with subsidiaries and sister concerns". At group level it was BDT 6,328.4m at June 2026, after eliminating BDT 4,607.6m of balances between the parent and its subsidiaries [1 p.29]. A year earlier it was BDT 4,342.0m, and at June 2023 BDT 2,059.3m [1 p.10] [6 p.127]. At June 2026 it equalled 60.8% of total equity and 48.6% of bank borrowings [15].
The parent's part is named. At June 2026 the parent was owed BDT 3,095.6m by Doreen Power House & Technologies Ltd, a sister concern, up from BDT 2,318.0m after a net BDT 777.6m in the year; BDT 129.6m by Manikgonj Power Generations Limited; and BDT 0.4m by its parent Asian-Entech Power Corporation Ltd [1 p.44]. It owed BDT 11.6m to Banco Energy Generation Ltd and BDT 4,607.6m in total to its three subsidiaries [1 p.34] [1 p.44]. The FY2026 directors' interest table lists Doreen Power House & Tech. Ltd. among the entities in which the managing director, Tahzeeb Alam Siddique, the chairman, Anjabeen Alam Siddique, and director Md. Abul Hasnat have interests; the same table lists Banco Energy Generation Ltd. among the interests of Md. Abul Hasnat and Anjabeen Alam Siddique [1 p.45]. The remaining BDT 3.10bn of the group figure sits in the subsidiaries' current accounts with sister concerns; the counterparties at subsidiary level are not itemised in the FY2026 consolidated notes.
On terms, the notes say the board, at its meeting of 05-Jul-2025, decided to give or take temporary loans "up to Tk.300 crore" (BDT 3,000m) through these current accounts for "emergency business need", with interest charged or paid on outstanding balances at the prevailing rate [1 p.29]. The auditor describes the accounts as maintained "to obtain or provide temporary loan up to Tk. 3,000 million with prevailing bank interest rate" [1 p.6]. The FY2026 consolidated statement shows non-operating income of BDT -1.8m and no separate line for interest on these balances [1 p.11] [1 p.37]. Among its procedures the auditor lists "Recalculating interest on the balances of current accounts and recording thereof" [1 p.6]; the amount of interest charged or received is not printed, and the sister concerns behind the subsidiaries' BDT 3.10bn are not named (searched FY2026 notes 10, 25 and 44). The parent's receivable from Doreen Power House & Technologies alone was BDT 3,095.6m at June 2026 [1 p.44].
| Party (relationship) | Net in FY2026 | 30-Jun-2026 | 30-Jun-2025 |
|---|---|---|---|
| Asian-Entech Power Corporation Ltd (parent company) | -25 | 0 | 26 |
| Banco Energy Generation Ltd (sister concern) | -17 | -12 | 6 |
| Doreen Power House & Technologies Ltd (sister concern) | 778 | 3,096 | 2,318 |
| Manikgonj Power Generations Ltd (sister concern) | 81 | 130 | 49 |
| Chandpur Power Generations Ltd (subsidiary) | -426 | -1,371 | -945 |
| Dhaka Northern Power Generations Ltd (subsidiary) | -92 | -1,686 | -1,595 |
| Dhaka Southern Power Generations Ltd (subsidiary) | -103 | -1,550 | -1,447 |
| Total | 195 | -1,394 | -1,589 |

The related-party current account reached 60.77% of total equity at Jun-26, up from 20.88% at Jun-22.
Peers: of the four compared, Doreen collects fastest and loses least to minorities; its related-party balance is second-largest
The peer table uses the nine months to 31-Mar-2026 for all four listed IPPs, the latest period each has filed on the same basis (consolidated, un-audited), from each company's own statements [3 p.2] [3 p.3] [9 p.2] [9 p.3] [10 p.2] [10 p.3] [11 p.2] [11 p.3]. Labels differ and are quoted in the workbook. Finance cost is gross for Doreen ("Financial expense") and BPPL ("Financial Expenses") but net for Summit ("Net finance income/(cost)") and UPGDCL, whose "Net Finance income/(cost)" was a cost of BDT 985m (printed in brackets). Receivables exclude related-party balances, which are shown on their own line.
Of the four, Doreen had the third-largest revenue (BDT 9.21bn) and a gross margin of 24.9%, against 32.7% at BPPL, 24.4% at Summit and 41.4% at UPGDCL [15]. It kept 8.2% of revenue for owners, against 5.6% at BPPL and 6.7% at Summit, where minorities took 48% and 59% of profit after tax, against 0.5% at Doreen [15]. Trade receivables were 214 days of nine-month revenue at Doreen, the shortest of the four (BPPL 268, Summit 317, UPGDCL 242) [15]. Related-party receivables were 64% of nine-month revenue at Doreen and 43% at UPGDCL, against under 1% at BPPL and Summit [15].
| Item | DOREENPWR | BPPL | SUMITPOWER | UPGDCL |
|---|---|---|---|---|
| Revenue | 9,206 | 8,888 | 23,601 | 24,015 |
| Gross margin | 24.9% | 32.7% | 24.4% | 41.4% |
| Finance cost as printed (+ = cost) | 1,372 | 1,689 | 1,972 | 985 |
| Profit after tax | 758 | 957 | 3,868 | 8,661 |
| Profit to owners | 754 | 494 | 1,574 | 8,513 |
| NCI share of profit after tax | 0.5% | 48.3% | 59.3% | 1.7% |
| Owners' profit / revenue | 8.2% | 5.6% | 6.7% | 35.4% |
| EPS as printed (BDT) | 4.16 | 2.86 | 1.47 | 14.69 |
| Receivable days | 214 | 268 | 317 | 242 |
| Related-party receivable | 5,899 | 52 | 190 | 10,290 |
| NAV per share (BDT) | 56.26 | 30.34 | 40.71 | 82.08 |

Doreen's owners' profit was 8.19% of revenue in 9M FY2026, against 35.45% at UPGDCL and 5.56% at BPPL.
Governance: a 63.5% sponsor that waives its dividend, a merger in court, and no expansion approved in 24 months
Asian Entech Power Corporation Ltd owns 63.538% of Doreen; the managing director Tahzeeb Alam Siddique holds 2.117% and other named sponsors and directors small stakes, and other shareholders hold 33.392% [1 p.30]. The chairman, Anjabeen Alam Siddique, was nominated by Asian Entech [2 p.15]. The FY2026 notes list two independent directors, Advocate Mohammad Mashiur Rahman and Masuda Sultana, whose listed interests are the three subsidiaries [1 p.45]. Key management remuneration was nil in FY2026 against BDT 0.6m paid to the managing director in FY2025 [1 p.44] [2 p.76].
Dividends. Doreen paid stock dividends every year from FY2016 to FY2022 (12% in FY2022), which took the share count to 181.1m [1 p.30]. Since FY2023 it has paid cash only, and since at least FY2025 only to general shareholders: the sponsors and directors, holding 120.64m shares, waive their entitlement [2 p.78] [8]. The FY2026 dividend of 15% (BDT 1.50 a share) costs BDT 90.72m, 10.0% of FY2026 profit to shareholders [1 p.46] [15]. The same rate on all 181.1m shares comes to BDT 271.7m [15]. The parent itself has no revenue and lost BDT 34.1m in FY2026; its cash was BDT 6.1m at June 2026 [1 p.15] [1 p.17], and the going-concern note says the company "expects to meet its operating expenses out of dividends from these subsidiaries" and short-term loans from them [1 p.19].

The cash dividend was 15% of par for FY26, after 10% in FY24-FY25; there has been no stock dividend since FY22.
| Event type | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|
| Audit opinion | 1 | 1 | 1 | 3 |
| Plant / contract | 0 | 2 | 1 | 3 |
| Rating | 1 | 1 | 0 | 2 |
| Results and dividend | 0 | 1 | 1 | 2 |
| Corporate restructuring | 0 | 0 | 1 | 1 |
| Total | 2 | 5 | 4 | 11 |
Material events in Exhibit 32:
- 13-Mar-2025: BREB cancelled the Narsingdi PPA by letter of 11-Mar-2025.
- 18-Nov-2025: FY2025 auditor's report: qualified opinion with going-concern material uncertainty.
- 25-Feb-2026: Board approved a vendor agreement with KPI Trading for the Narsingdi plant at BDT 102m.
- 08-Jun-2026: Board approved merger of the three subsidiaries into the company.
- 11-Oct-2026: FY2026: EPS 5.03, NAV 57.12; 15% cash to general shareholders.
The 24-month sweep of DSE news (Nov-2024 to Oct-2026) shows no board approval of new plant, capacity expansion or capital raising; the capital decisions were asset sales at the closed gas plants and the merger [8]. Capital spending on existing plant was BDT 831m in FY2025 and BDT 601m in FY2026 [1 p.13]. CRISL rated the company AA / ST-2 on 07-Dec-2023 [17], A+ / ST-3 in Dec-2024 [26] and A / ST-3 on 15-Dec-2025, valid to 14-Dec-2026, all with a stable outlook [18] [27], from AA to A in two years. CRISL's rating list (crislbd.com/page/rating-list, read 4-Nov-2026) lists ratings without rationale links; the rationale reports are not in our data, and the company's declarations give no reasons [17] [18]. The merger's cash cost to buy out the subsidiaries' minorities, and any consents needed from BPDB under the PPAs, lenders or NBR, are not disclosed (searched FY2026 notes 1.3 and 2.5, DSE posts of 08-Jun-2026).
Five years of DSE posts (Nov-2021 to Nov-2026) add the earlier events: Chandpur's commercial operation on 11-Feb-2022; results posts blaming exchange loss in FY2023 and BPDB payment delays in FY2022-23; a revaluation in Oct-2024 that cut NAV per share by BDT 4.53; qualified FY2024 and FY2025 audits; company secretary changes in Aug-2023 and Jul-2025; and the Q1 FY2027 board meeting notified for 05-Nov-2026 [25] [26] [27]. Dividends were 20% (FY2020), 25% (FY2021), 30% (FY2022), 11% (FY2023), 10% (FY2024) and 10% (FY2025) [2 p.77], and 15% for FY2026 [1 p.46].
| Event type | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|
| Results and dividend | 1 | 1 | 2 | 0 | 0 | 1 | 5 |
| Management change | 0 | 0 | 1 | 0 | 1 | 0 | 2 |
| Audit opinion | 0 | 0 | 0 | 1 | 1 | 0 | 2 |
| Rating | 0 | 0 | 0 | 1 | 1 | 0 | 2 |
| Plant / contract | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
| Revaluation / impairment | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
| Corporate restructuring | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Board meeting | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Total | 1 | 2 | 3 | 3 | 3 | 3 | 15 |
Material events in Exhibit 33:
- 14-Feb-2022: Chandpur 115 MW reached COD on 11-Feb-2022.
- 16-Oct-2024: Revaluation: impairment of BDT 819.9m; NAV per share down BDT 4.53.
- 18-Nov-2025: FY2025 audit: qualified opinion and material uncertainty related to going concern.
- 08-Jun-2026: Board approved merger of the three subsidiaries on 07-Jun-2026.
What's next: record date 12-Nov-2026, AGM 24-Dec-2026, the merger hearings, then PPA ends in 2031 and 2037
Dated items already disclosed, and the line each moves (direction only, no forecast):
| Date | Event | Line it moves | Source |
|---|---|---|---|
| 12-Nov-2026 | Record date for the 15% FY2026 dividend (general shareholders) | Cash, equity (BDT 90.72m) | [s8] |
| 05-Nov-2026 | Board meeting on Q1 FY2027 results (notified on DSE 02-Nov-2026) | All lines | [s8] |
| Dec-2026 | Sale of remaining assets held for sale (Tangail and Feni land); the notes say a sale 'is expected by December 2026' | Assets held for sale (BDT 216.5m), cash | [s1 p.30] |
| 24-Dec-2026 | AGM for FY2026 | Dividend approval | [s8] |
| No date set | Members' and creditors' meetings, BSEC approval and court sanction of the merger | Group structure; parent becomes the operating company | [s1 p.19] |
| 16-Jun-2031 | Dhaka Southern PPA ends | Revenue (down) unless renewed | [s1 p.19] |
| 16-Aug-2031 | Dhaka Northern PPA ends | Revenue (down) unless renewed | [s1 p.19] |
| 24-Nov-2029 | Bangladesh LDC graduation (moved from 24-Nov-2026) | No PPA or loan clause found that refers to it | [s12] [s13] |
| 10-Feb-2037 | Chandpur PPA ends | Revenue (down) unless renewed | [s1 p.19] |
Dhaka Northern and Dhaka Southern earned BDT 5.69bn of FY2026 revenue between them [1 p.36], and both contracts end in 2031 [1 p.19]; the filings print no extension or renewal terms for them (searched FY2026 notes 1.3-1.5, AR2025 p.17-20). For the gas plants the company "applied for renewal of these PPAs for another 10 years", the proposals "were pending for long time", and BREB wrote that it was "not interested to renew the PPA further" [2 p.17]; Chandpur, which carries most of the debt, runs to 2037. The gas plants' expiries were followed by the cancellation of the Narsingdi PPA and write-downs of the plants to forced-sale value [2 p.20]. The UN General Assembly adopted Bangladesh's three-year deferral of LDC graduation to 24-Nov-2029 on 29-Oct-2026 in New York (30-Oct in Dhaka) [12] [13]; we found no clause in Doreen's filings that ties its tariffs, tax exemption or loans to LDC status. The FY2025 AGM (30-Dec-2025) and the FY2025 dividend have passed; DSE carried the dividend disbursement notice on 22-Jan-2026 [8].
Risks: related-party balances, dispatch, rates and the 2031 PPA ends
Each risk below is tied to the line it moves and to a figure in the filings. The size test is FY2026 profit to shareholders of BDT 910m [1 p.11].
| Risk | Line it moves | Evidence |
|---|---|---|
| Related-party balances not repaid | Cash, equity, borrowings | BDT 6.33bn receivable, 61% of equity; BDT 1,975m paid out in FY2026 |
| Low dispatch by BPDB | Revenue (fuel part), gross profit | HFO fleet at 26.5% (FY2024) and 32.5% (FY2025) of capacity; FY2026 revenue -22.3% |
| Interest rates on taka loans | Financial expenses | BDT 1,504m in FY2026; BDT 13.0bn of bank borrowings, 59% short-term |
| Taka depreciation | Financial expenses (exchange loss) | FY2023 finance expense BDT 2,805m; notes link FY2026 fall to stable exchange rate |
| BPDB payment delays | Receivables, short-term debt | Receivables 227 days at June 2022; 169 days at June 2026 |
| PPA expiry without renewal | Revenue, asset values | Dhaka plants end 2031 (BDT 5.69bn FY2026 revenue); gas-plant precedent |
| Merger not sanctioned or delayed | Structure, parent cash | Parent has no revenue; FY2026 loss BDT 34.1m; scheme admitted 18-Aug-2026 |
| WPPF exemption refused | Expenses | No WPPF provision at subsidiaries (emphasis of matter) |
| Unpaid gas bills | Payables, cash | BDT 613.6m owed to Titas and Bakhrabad, all over 91 days |
| Fuel and taka prices | Cost of sales, working capital, short-term debt | Brent USD 74.57 (FY2025 avg) to 116.8 (Sep-2026); furnace oil and spares bought in USD and EUR, unhedged |
| Rating downgrades | Borrowing cost | CRISL AA (Dec-2023) to A (Dec-2025) |
Two of these have a dated history in the filings. Finance expense was 15.2% of revenue in FY2023, when the owners' margin was 3.5% [15], and the company states it has not entered into derivative instruments to hedge currency or interest-rate risk [1 p.43]. On the related-party balances, the FY2026 auditor reviewed the counterparties' financial capability and reported no issues [1 p.6], but the balances grew in each year from June 2023 to June 2026 [15].
Key questions: the group-company balances, dispatch and the merger
Key questions and the signposts that answer them
- Does the BDT 6.33bn owed by group companies come down, and is interest booked on it? Signpost: note 10 and the related-party note in the Q1-Q2 FY2027 statements.
- What was FY2026 dispatch by plant? Signpost: the plant table in the full FY2026 annual report, before the 24-Dec-2026 AGM.
- Does the court sanction the merger, and at what cash cost to buy out the minorities? Signpost: DSE disclosures on the members' and creditors' meetings.
- Do short-term loans keep falling? Signpost: note 26 at September and December 2026.
- Does BPDB renew the two Dhaka PPAs before 2031? Signpost: any DSE disclosure on renewal talks before June 2031.
DOREENPWR closed at BDT 32.0 on 29-Oct-2026 [14]. On the FY2026 audited figures that is 6.4x EPS of BDT 5.03 and 0.56x NAV per share of BDT 57.12 [1 p.11] [15]. At 30-Jun-2026 the DSE price was BDT 30.30 [1 p.30], 6.0x FY2026 EPS; the company's own table gives June-end P/E ratios of 8.02x (FY2021), 7.44x (FY2022), 17.16x (FY2023), 14.20x (FY2024) and 7.29x (FY2025) [2 p.21]. The BDT 1.50 dividend is 4.7% of the price for general shareholders. Market capitalisation is BDT 5.80bn and the 52-week intraday range BDT 24.5-36.5 [14]. These are facts about the price, not a view on it.
The model
History
| BDT mn | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|---|---|---|
| Revenue (consolidated) | 6,660 | 7,022 | 4,746 | 6,657 | 15,024 | 18,429 | 13,333 | 15,063 | 11,697 |
| Gross profit | 1,410 | 1,505 | 1,325 | 1,656 | 3,094 | 3,963 | 3,231 | 3,197 | 2,690 |
| General & admin expenses | 119 | 117 | 138 | 142 | 309 | 509 | 292 | 228 | 267 |
| Financial expenses | 461 | 465 | 386 | 344 | 1,111 | 2,805 | 2,179 | 1,979 | 1,504 |
| Impairment loss on asset valuation (gas plants) | 0 | 0 | 0 | 0 | 0 | 0 | 414 | 410 | 0 |
| Profit attributable to owners | 829 | 918 | 798 | 1,169 | 1,668 | 644 | 327 | 579 | 910 |
| Total assets | 13,611 | 14,224 | 13,890 | 21,523 | 28,677 | 26,886 | 24,752 | 24,976 | 24,936 |
| Total liabilities | 9,295 | 9,067 | 7,997 | 14,496 | 20,034 | 17,692 | 15,716 | 15,416 | 14,522 |
| Shareholders' equity (owners) | 4,317 | 5,133 | 5,865 | 6,990 | 8,595 | 9,142 | 8,978 | 9,496 | 10,346 |
| EPS as reported (BDT) | 7.14 | 7.91 | 6.08 | 8.09 | 10.31 | 3.56 | 1.81 | 3.19 | 5.03 |
| Net operating cash flow per share as reported (BDT) | 9.86 | 7.25 | 15.12 | 6.46 | -32.22 | 17.98 | 20.03 | 11.78 | 18.96 |
| Cash dividend declared (% of BDT 10 par) | 15% | 17% | 10% | 13% | 18% | 11% | 10% | 10% | 15% |
| Stock dividend declared (% of par) | 10% | 13% | 10% | 12% | 12% | 0% | 0% | 0% | 0% |
| Operating profit (gross profit - G&A) | 1,291 | 1,388 | 1,187 | 1,514 | 2,785 | 3,453 | 2,939 | 2,970 | 2,423 |
| Revenue growth | — | 5.4% | -32.4% | 40.3% | 125.7% | 22.7% | -27.7% | 13.0% | -22.3% |
| Gross margin | 21.2% | 21.4% | 27.9% | 24.9% | 20.6% | 21.5% | 24.2% | 21.2% | 23.0% |
| Operating margin | 19.4% | 19.8% | 25.0% | 22.7% | 18.5% | 18.7% | 22.0% | 19.7% | 20.7% |
| Financial expenses / revenue | 6.9% | 6.6% | 8.1% | 5.2% | 7.4% | 15.2% | 16.3% | 13.1% | 12.9% |
| Operating profit / financial expenses (x) | 2.8x | 3.0x | 3.1x | 4.4x | 2.5x | 1.2x | 1.3x | 1.5x | 1.6x |
| Owners' profit margin | 12.5% | 13.1% | 16.8% | 17.6% | 11.1% | 3.5% | 2.5% | 3.8% | 7.8% |
| ROE on owners' equity (average) | — | 19.4% | 14.5% | 18.2% | 21.4% | 7.3% | 3.6% | 6.3% | 9.2% |
| Return on average total assets | — | 6.6% | 5.7% | 6.6% | 6.6% | 2.3% | 1.3% | 2.3% | 3.6% |
| Total liabilities / owners' equity (x) | 2.2x | 1.8x | 1.4x | 2.1x | 2.3x | 1.9x | 1.8x | 1.6x | 1.4x |
| Owners' equity per share on 181.1m shares (BDT) | 23.83 | 28.34 | 32.38 | 38.59 | 47.46 | 50.47 | 49.57 | 52.43 | 57.12 |
| Owners' profit excluding impairment | 829 | 918 | 798 | 1,169 | 1,668 | 644 | 741 | 988 | 910 |
Plants
| BDT mn | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Feni 22 MW gas: net energy output (MWh) | 160,004 | 156,350 | 152,950 | 88,710 | 0 |
| Narsingdi 22 MW gas: net energy output (MWh) | 133,128 | 139,860 | 132,296 | 58,710 | 0 |
| Tangail 22 MW gas: net energy output (MWh) | 141,198 | 161,114 | 126,435 | 50,266 | 0 |
| Dhaka Northern 55 MW HFO: net energy output (MWh) | 231,844 | 297,603 | 219,072 | 111,083 | 135,992 |
| Dhaka Southern 55 MW HFO: net energy output (MWh) | 237,896 | 307,941 | 208,145 | 103,369 | 116,257 |
| Chandpur 115 MW HFO: net energy output (MWh) | 0 | 205,353 | 466,547 | 307,196 | 388,865 |
| Dhaka Northern installed capacity (MWh a year) | 481,800 | 481,800 | 481,800 | 481,800 | 481,800 |
| Dhaka Southern installed capacity (MWh a year) | 481,800 | 481,800 | 481,800 | 481,800 | 481,800 |
| Chandpur installed capacity (MWh a year) | — | 1,007,400 | 1,007,400 | 1,007,400 | 1,007,400 |
| Dhaka Northern revenue | 2,643 | 4,895 | 4,289 | 2,633 | 3,393 |
| Dhaka Southern revenue | 2,700 | 4,967 | 4,150 | 2,638 | 3,050 |
| Chandpur revenue | 0 | 3,790 | 8,216 | 6,886 | 8,621 |
| Three gas plants revenue | 1,320 | 1,370 | 1,763 | 1,168 | 0 |
| Group net energy output (MWh) | 904,070 | 1,268,221 | 1,305,445 | 719,334 | 641,114 |
| HFO plants net energy output (MWh) | 469,740 | 810,897 | 893,764 | 521,648 | 641,114 |
| Dhaka Northern plant factor (output / installed MWh) | 48.1% | 61.8% | 45.5% | 23.1% | 28.2% |
| Dhaka Southern plant factor | 49.4% | 63.9% | 43.2% | 21.5% | 24.1% |
| Chandpur plant factor | — | 20.4% | 46.3% | 30.5% | 38.6% |
| HFO fleet plant factor (225 MW) | 48.7% | 41.1% | 45.3% | 26.5% | 32.5% |
| Dhaka Northern revenue per kWh (BDT) | 11.40 | 16.45 | 19.58 | 23.70 | 24.95 |
| Dhaka Southern revenue per kWh (BDT) | 11.35 | 16.13 | 19.94 | 25.52 | 26.23 |
| Chandpur revenue per kWh (BDT) | — | 18.45 | 17.61 | 22.41 | 22.17 |
Subsidiaries
| BDT mn | FY2025 | FY2026 |
|---|---|---|
| Dhaka Northern: revenue | 3,393 | 3,369 |
| Dhaka Northern: cost of sales | 2,556 | 2,632 |
| Dhaka Northern: finance expenses | 409 | 401 |
| Dhaka Southern: revenue | 3,050 | 2,316 |
| Dhaka Southern: cost of sales | 2,247 | 1,762 |
| Dhaka Southern: finance expenses | 317 | 223 |
| Chandpur: revenue | 8,621 | 6,012 |
| Chandpur: cost of sales | 7,063 | 4,613 |
| Chandpur: finance expenses | 1,251 | 880 |
| Parent (DPGSL) G&A expenses | 58 | 26 |
| Parent (DPGSL) net profit/(loss) after tax | -476 | -34 |
| Dhaka Northern gross margin | 24.7% | 21.9% |
| Dhaka Southern gross margin | 26.3% | 23.9% |
| Chandpur gross margin | 18.1% | 23.3% |
| Chandpur gross profit | 1,557 | 1,399 |
| Chandpur share of the three plants' finance expenses | 63.3% | 58.5% |
Balance sheet
| BDT mn | Jun-2021 | Jun-2022 | Jun-2023 | Jun-2024 | Jun-2025 | Mar-2026 | Jun-2026 |
|---|---|---|---|---|---|---|---|
| Trade and other receivables | 1,689 | 9,341 | 8,596 | 5,689 | 6,485 | 7,190 | 5,416 |
| Current A/C receivable with subsidiaries and sister concerns | 2,498 | 1,805 | 2,059 | 3,319 | 4,342 | 5,899 | 6,328 |
| Inventories | 820 | 1,587 | 1,287 | 2,668 | 1,657 | 1,825 | 1,640 |
| Cash and bank balance | 1,000 | 54 | 84 | 41 | 183 | 41 | 153 |
| Long-term loan, net of current maturity | 7,746 | 7,498 | 6,385 | 5,642 | 4,947 | 4,554 | 4,221 |
| Current portion of long-term loan | 1,004 | 1,279 | 1,121 | 943 | 976 | 1,068 | 1,073 |
| Short-term loan | 4,757 | 10,348 | 8,950 | 7,686 | 8,160 | 9,245 | 7,731 |
| Total equity (incl. NCI) | 7,028 | 8,643 | 9,194 | 9,035 | 9,560 | 10,257 | 10,414 |
| Revenue (annual; 9M x 365/274 for Mar-2026) | 6,657 | 15,024 | 18,429 | 13,333 | 15,063 | 12,263 | 11,697 |
| Bank borrowings (long-term + current portion + short-term) | 13,506 | 19,126 | 16,456 | 14,270 | 14,083 | 14,867 | 13,025 |
| Net debt (borrowings - cash) | 12,507 | 19,072 | 16,372 | 14,230 | 13,900 | 14,826 | 12,872 |
| Borrowings / total equity (x) | 1.9x | 2.2x | 1.8x | 1.6x | 1.5x | 1.4x | 1.3x |
| Short-term loan, % of borrowings | 35.2% | 54.1% | 54.4% | 53.9% | 57.9% | 62.2% | 59.4% |
| Receivable days (on annual or annualised revenue) | 93 | 227 | 170 | 156 | 157 | 214 | 169 |
| Related-party current account / total equity | 35.5% | 20.9% | 22.4% | 36.7% | 45.4% | 57.5% | 60.8% |
| Related-party current account / borrowings | 18.5% | 9.4% | 12.5% | 23.3% | 30.8% | 39.7% | 48.6% |
Cash flow
| BDT mn | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
| Received from customers | 19,339 | 16,246 | 14,343 | 12,820 |
| Financial expenses paid | -2,862 | -1,998 | -2,036 | -1,456 |
| Net cash flow from operating activities | 3,257 | 3,628 | 2,133 | 3,435 |
| Acquisition of property, plant and equipment | — | -109 | -831 | -601 |
| Received from/(paid to) subsidiaries and sister concerns | -254 | -1,260 | -1,023 | -1,975 |
| Short-term loan received/(repaid) | -1,487 | -1,327 | 474 | -429 |
| Long-term loan received/(repaid) | -1,271 | -922 | -661 | -629 |
| Dividend paid | — | -66 | -61 | -61 |
| Net profit after tax (consolidated) | 649 | 333 | 585 | 914 |
| Revenue | 18,429 | 13,333 | 15,063 | 11,697 |
| Cash received / revenue | 104.9% | 121.9% | 95.2% | 109.6% |
| CFO / profit after tax (x) | 5.0x | 10.9x | 3.6x | 3.8x |
| CFO less capex | — | 3,519 | 1,302 | 2,833 |
| Paid to related parties, % of CFO | 7.8% | 34.7% | 48.0% | 57.5% |
Coverage
| BDT mn | FY2025 | FY2026 |
|---|---|---|
| Gross operating profit | 2,970 | 2,423 |
| Depreciation (consolidated, cash-flow reconciliation) | 952 | 1,309 |
| Financial expenses | 1,979 | 1,504 |
| Net debt at year end | 13,900 | 12,872 |
| EBITDA (gross operating profit + depreciation) | 3,922 | 3,732 |
| Gross operating profit / financial expenses (x) | 1.5x | 1.6x |
| Net debt / EBITDA (x) | 3.5x | 3.4x |
Quarters
| BDT mn | Q1 FY25 | H1 FY25 | 9M FY25 | FY2025 | Q1 FY26 | H1 FY26 | 9M FY26 | FY2026 |
|---|---|---|---|---|---|---|---|---|
| Revenue (cumulative) | 5,230 | 7,857 | 10,673 | 15,063 | 4,928 | 7,167 | 9,206 | 11,697 |
| Gross profit (cumulative) | 913 | 1,756 | 2,530 | 3,197 | 861 | 1,596 | 2,290 | 2,690 |
| Financial expense (cumulative) | 576 | 1,274 | 1,803 | 1,979 | 482 | 942 | 1,372 | 1,504 |
| Profit attributable to shareholders (cumulative) | 268 | 364 | 552 | 579 | 327 | 552 | 754 | 910 |
| Revenue, discrete quarter (Q1..Q4) | 5,230 | 2,627 | 2,816 | 4,390 | 4,928 | 2,239 | 2,039 | 2,491 |
| Gross profit, discrete quarter (Q1..Q4) | 913 | 843 | 774 | 668 | 861 | 735 | 694 | 401 |
| Financial expense, discrete quarter (Q1..Q4) | 576 | 698 | 529 | 176 | 482 | 460 | 430 | 132 |
| Profit to shareholders, discrete quarter (Q1..Q4) | 268 | 96 | 188 | 27 | 327 | 225 | 201 | 157 |
| EPS, discrete quarter (BDT) | 1.48 | 0.53 | 1.04 | 0.15 | 1.81 | 1.24 | 1.11 | 0.86 |
| Gross margin, discrete quarter | 17.4% | 32.1% | 27.5% | 15.2% | 17.5% | 32.8% | 34.0% | 16.1% |
| Reported discrete EPS (BDT), for the check | 1.48 | 0.53 | 1.04 | — | 1.81 | 1.24 | 1.11 | — |
Peers 9M FY26
| BDT mn | DOREENPWR | BPPL | SUMITPOWER | UPGDCL |
|---|---|---|---|---|
| Revenue (9M to 31-Mar-2026) | 9,206 | 8,888 | 23,601 | 24,015 |
| Gross profit (9M) | 2,290 | 2,908 | 5,749 | 9,947 |
| Finance cost as printed (+ = cost) | 1,372 | 1,689 | 1,972 | 985 |
| Profit after tax, total (9M) | 758 | 957 | 3,868 | 8,661 |
| Profit to owners (9M) | 754 | 494 | 1,574 | 8,513 |
| EPS as printed (BDT) | 4.16 | 2.86 | 1.47 | 14.69 |
| Receivables at 31-Mar-2026, printed label | 7,190 | 8,687 | 27,305 | 21,219 |
| Related-party receivable at 31-Mar-2026, printed label | 5,899 | 52 | 190 | 10,290 |
| NAV per share at 31-Mar-2026 as printed (BDT) | 56.26 | 30.34 | 40.71 | 82.08 |
| Gross margin | 24.9% | 32.7% | 24.4% | 41.4% |
| Finance cost as printed / revenue | 14.9% | 19.0% | 8.4% | 4.1% |
| Share of profit after tax going to NCI | 0.5% | 48.3% | 59.3% | 1.7% |
| Owners' profit / revenue | 8.2% | 5.6% | 6.7% | 35.5% |
| Receivables / 9M revenue x 274 days | 214 | 268 | 317 | 242 |
| Related-party receivable / 9M revenue | 64.1% | 0.6% | 0.8% | 42.8% |
Fuel and output
| Item | FY2022 | FY2023 | FY2024 | FY2025 | Source |
|---|---|---|---|---|---|
| Dhaka Northern: net energy output (MWh) | 297,603 | 219,072 | 111,083 | 135,992 | AR23 p.59 (FY2022, FY2023); AR25 p.74 (FY2024, FY2025), directors' report plant table |
| Dhaka Southern: net energy output (MWh) | 307,941 | 208,145 | 103,369 | 116,257 | AR23 p.59 (FY2022, FY2023); AR25 p.74 (FY2024, FY2025), directors' report plant table |
| Chandpur: net energy output (MWh) | 205,353 | 466,547 | 307,196 | 388,865 | AR23 p.59 (FY2022, FY2023); AR25 p.74 (FY2024, FY2025), directors' report plant table |
| Dhaka Northern: HFO consumption (MT) | 59,297 | 43,688 | 21,651 | 27,165 | AR23 p.59 (FY2022, FY2023); AR25 p.74 (FY2024, FY2025), directors' report plant table |
| Dhaka Southern: HFO consumption (MT) | 59,469 | 41,865 | 21,061 | 23,780 | AR23 p.59 (FY2022, FY2023); AR25 p.74 (FY2024, FY2025), directors' report plant table |
| Chandpur: HFO consumption (MT) | 39,562 | 91,232 | 60,651 | 77,919 | AR23 p.59 (FY2022, FY2023); AR25 p.74 (FY2024, FY2025), directors' report plant table |
| Dhaka Northern: HFO per kWh (grams) | 199 | 199 | 195 | 200 | Formula |
| Dhaka Southern: HFO per kWh (grams) | 193 | 201 | 204 | 205 | Formula |
| Chandpur: HFO per kWh (grams) | 193 | 196 | 197 | 200 | Formula |
| HFO plants: total HFO consumption (MT) | 158,328 | 176,785 | 103,363 | 128,864 | Formula |
| Chandpur: cost of sales (BDT mn) | — | — | — | 7,063 | FS26 p.36 (FY2025 comparative) |
| Chandpur: cost of sales per kWh (BDT) | — | — | — | 18 | Formula |
| Dhaka Northern: cost of sales (BDT mn) | — | — | — | 2,556 | FS26 p.36 (FY2025 comparative) |
| Dhaka Northern: cost of sales per kWh (BDT) | — | — | — | 19 | Formula |
| Dhaka Southern: cost of sales (BDT mn) | — | — | — | 2,247 | FS26 p.36 (FY2025 comparative) |
| Dhaka Southern: cost of sales per kWh (BDT) | — | — | — | 19 | Formula |
| AR25 prints a second FY2025 table (ESG report, p.44): generation 140,781 / 120,763 / 397,146 MWh and HFO 27,102 / 23,268 / 77,312 MT for DNPGL / DSPGL / Chandpur. The page does not say whether these are gross or net figures; the directors' report (p.74) figures are used above. | |||||
| FY2026 output and HFO use by plant are not in the audited FY2026 statements (DOREENPWR_ANNUAL_2026); the full FY2026 annual report is not in our corpus at 4-Nov-2026. | |||||
| The filings do not split cost of sales into fuel and other costs, and do not name the HFO supplier or the import route. | |||||
Fuel prices and FX
| Series | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | Source |
|---|---|---|---|---|---|---|---|---|---|
| Brent crude, FY average (USD/bbl) | 69 | 52 | 54 | 91 | 87 | 85 | 75 | 79 | World Bank Pink Sheet monthly, averaged Jul-Jun (commodities/wb_crude_brent.csv) |
| BDT per USD, FY average | 84 | 85 | 85 | 86 | 99 | 111 | 120 | 122 | Bangladesh Bank NSDP monthly average, averaged Jul-Jun (fx/bdt_usd_monthly_avg_bb.csv) |
| BDT per USD, end-June | 84 | 85 | 85 | 93 | 106 | 118 | 123 | 123 | Bangladesh Bank NSDP end of period (fx/bdt_usd_monthly_eop_bb.csv) |
| Brent in BDT per bbl, FY average (derived) | 5,766 | 4,377 | 4,590 | 7,860 | 8,635 | 9,409 | 8,981 | 9,713 | Formula |
| Latest monthly points: Brent USD 116.8/bbl (Sep-2026); BDT/USD 122.95 average (Sep-2026), 123.025 end-Sep-2026. | |||||||||
| BPC / BERC furnace-oil price (Tk per litre): 96.86 from 6-Sep-2026 (BERC notice, monthly Platts-linked adjustment under BERC order 2026/05; HFO to BPDB, power plants and industry); 108.78 from 1-Oct-2026 (BPC website, read 3-Nov-2026). Earlier furnace-oil price history is not in our data at 4-Nov-2026. | |||||||||
| Gas tariff for power plants (govt, IPP and rental), Tk per cubic metre: 4.45 from 1-Jul-2019 (BERC order 2019/02); 14.00 from bill month Feb-2023 (Energy Division SRO 14-Ain/2023); 14.75 from Feb-2024 (SRO 40-Ain/2024); 15.50 from May-2024 (SRO 105-Ain/2024) (regulated/berc_gas_power.csv). The BERC gas order of 4-Jun-2022 is not in our data. | |||||||||
| URLs: https://thedocs.worldbank.org/en/doc/74e8be41ceb20fa0da750cda2f6b9e4e-0050012026/related/CMO-Historical-Data-Monthly.xlsx ; https://www.bb.org.bd/econdata/nsdp/xml/bgd/exr_bgd.xml ; https://www.dpp.gov.bd/upload_file/gazettes/52496_98921.pdf ; https://www.dpp.gov.bd/upload_file/gazettes/53455_79942.pdf | |||||||||
Policy rate (BB)
| Date | Policy (repo) rate, % | Source |
|---|---|---|
| 2020-07-29 | 5 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2022-05-01 | 5 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2022-06-30 | 6 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2022-09-01 | 6 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2023-01-15 | 6 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2023-07-01 | 6 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2023-10-01 | 7 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2023-11-26 | 8 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2024-01-17 | 8 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2024-05-08 | 8 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2024-07-18 | 8 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2024-08-25 | 9 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2024-09-01 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2024-10-01 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2024-12-03 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2025-01-21 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2025-05-12 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2025-07-20 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2025-11-03 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2026-01-28 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2026-06-29 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2026-07-30 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2026-09-23 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| 2026-09-30 | 10 | Bangladesh Bank MPC / MPS (rates/bd_policy_rate_bb_history.csv) |
| Path: 4.75% (29-Jul-2020) to 10.00% (1-Oct-2024), held at 10.00% to 29-Jun-2026, cut to 9.50% on 30-Jul-2026, held at 9.50% at 30-Sep-2026. | ||
| Source URL: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf | ||
Lending rate (BB SBS)
| End-June | Weighted average lending rate, all scheduled banks, % | Source |
|---|---|---|
| 2019-06-30 | 10 | Bangladesh Bank Scheduled Banks Statistics, Table-102 (banks/bb_sbs_wavg_lending_rate.csv) |
| 2020-06-30 | 8 | Bangladesh Bank Scheduled Banks Statistics, Table-102 (banks/bb_sbs_wavg_lending_rate.csv) |
| 2021-06-30 | 7 | Bangladesh Bank Scheduled Banks Statistics, Table-102 (banks/bb_sbs_wavg_lending_rate.csv) |
| 2022-06-30 | 7 | Bangladesh Bank Scheduled Banks Statistics, Table-102 (banks/bb_sbs_wavg_lending_rate.csv) |
| 2023-06-30 | 7 | Bangladesh Bank Scheduled Banks Statistics, Table-102 (banks/bb_sbs_wavg_lending_rate.csv) |
| 2024-06-30 | 12 | Bangladesh Bank Scheduled Banks Statistics, Table-102 (banks/bb_sbs_wavg_lending_rate.csv) |
| 2025-06-30 | 12 | Bangladesh Bank Scheduled Banks Statistics, Table-102 (banks/bb_sbs_wavg_lending_rate.csv) |
| 2026-06-30 | 12 | Bangladesh Bank Scheduled Banks Statistics, Table-102 (banks/bb_sbs_wavg_lending_rate.csv) |
| Source URL: https://www.bb.org.bd/en/index.php/publication/publictn/3/10 | ||
Receivables and claims
| BDT mn | Jun-2024 | Jun-2025 | Jun-2026 | Source |
|---|---|---|---|---|
| Parent (BREB and other) | 306 | 94 | 48 | AR25 p.155 (Jun-24, Jun-25); FS26 p.28 (Jun-26) |
| Dhaka Northern | 1,164 | 1,900 | 1,474 | AR25 p.155; FS26 p.28 |
| Dhaka Southern | 1,262 | 1,444 | 952 | AR25 p.155; FS26 p.28 |
| Chandpur | 2,958 | 3,048 | 2,942 | AR25 p.155; FS26 p.28 |
| Consolidated trade and other receivables | 5,689 | 6,485 | 5,416 | Formula (printed: 5,689.16 / 6,485.28 / 5,415.58) |
| Parent receivables past due more than 90 days | 306 | 94 | 48 | AR25 p.155; FS26 p.28 (0-30 and 31-90 day buckets nil) |
| Late-payment interest claimed: Feni plant, billed to BPDB | — | 81 | 81 | FS26 p.44 note 43.3 (page image) |
| Late-payment interest claimed: Narsingdi plant, billed to BREB | — | 8 | 8 | FS26 p.44 note 43.3 (page image) |
| Late-payment interest claimed: Tangail plant, billed to BPDB | — | 63 | 63 | FS26 p.44 note 43.3 (page image) |
| Late-payment interest claimed, total (printed 152.00; status: bill submitted and pursuation going on) | — | 152 | 152 | Formula |
| The claim covers the parent's three gas plants only; no claim is disclosed for the HFO subsidiaries. | ||||
| Subsidiary receivables are not aged in the consolidated notes; the ageing table (0-30 / 31-90 / >90 days) covers the parent only. | ||||
| PPA clause 13.3(a)(iii): 'Late payment shall bear interest at a rate per annum equal to the bank rate' (AR25 p.154; FS26 p.28). | ||||
| No settlement of BPDB dues in special bonds is disclosed in FY2025 or FY2026 (searched 'bond' in AR25 and FS26: only bank-guarantee 'Operational Bond' lines). | ||||
Operating cash bridge
| BDT mn | FY2024 | FY2025 | FY2026 | Source |
|---|---|---|---|---|
| Inventories (increase) / decrease | -1,381 | 1,011 | 17 | AR25 p.169 note 41(a) |
| Trade and other receivables (increase) / decrease | 2,906 | -759 | 1,026 | AR25 p.169 note 41(a) |
| Deferred revenue | -8 | 49 | 96 | AR25 p.169 note 41(a) |
| Interest payable | 115 | -60 | 46 | AR25 p.169 note 41(a) |
| Net profit after tax | 333 | 585 | 914 | AR25 p.169 note 41(a) |
| Depreciation | 1,079 | 952 | 1,309 | AR25 p.169 note 41(a) |
| Net cash flow from operating activities (printed) | 3,628 | 2,133 | 3,435 | AR25 p.169 note 41(a) |
| FY2026 column: FS26 p.40 note 41(a), read from the page image. | ||||
FX loss FY2023
| BDT mn | FY2023 | Source |
|---|---|---|
| Exchange loss in foreign procurement (directors' report) | 1,117 | AR23 p.60 |
| Financial expenses (consolidated) | 2,805 | AR23 p.142 |
| Exchange loss share of financial expenses | 0 | Formula |
| Other years: split not printed (AR24 p.161, AR25 p.166, FS26 p.37). | ||
Credit ratings (CRISL)
| Rating date | Long term | Short term | Outlook | Valid to | Source |
|---|---|---|---|---|---|
| 07-Dec-2023 | AA | ST-2 | Stable | 06-Dec-2024 | Company declaration dated 10-Dec-2023 (DOREENPWR_RATING_2023) |
| Dec-2024 (DSE post 17-Dec-2024) | A+ | ST-3 | Stable | — | DSE post 17-Dec-2024 (audited to Jun-2024, unaudited to Sep-2024) |
| 15-Dec-2025 | A | ST-3 | Stable | 14-Dec-2026 | Company declaration dated 17-Dec-2025 (DOREENPWR_RATING_2025); DSE post 17-Dec-2025 |
| CRISL rationale reports (reasons for each change) are not in our data at 4-Nov-2026. | |||||
DSE events 2021-2026
| DSE post date | Event (DSE wording quoted) |
|---|---|
| 2021-11-15 | Q1 FY2022: EPS 2.83 (2.01); CNOCF negative 'because of significant increase in trade receivables of two subsidiaries' |
| 2022-02-14 | Chandpur 115 MW COD 11-Feb-2022; 'will generate approximately BDT 1,102.22 Crore revenue per year (as per PPA)' |
| 2022-09-26 | FY2022 results: CNOCF down on 'delay in payment of revenue bills by BPDB' and inventory 'for fuel price increase international market' |
| 2022-11-15 | Q1 FY2023: EPS down on 'foreign exchange loss incurred due to devaluation of BDT against USD' |
| 2023-01-31 | Q2 FY2023: NOCFPS down on 'abnormal delay in payment of revenue bills' by BPDB |
| 2023-08-24 | Acting company secretary appointed (Muhammad Amzad Shakil, FCA) |
| 2023-10-15 | FY2023 results: EPS down on exchange loss; NOCFPS up on recovery from BPDB |
| 2023-11-15 | Q1 FY2024: EPS down on Chandpur finance cost 'for increase in interest rate' |
| 2024-01-31 | Q2 FY2024: EPS up on lower foreign exchange loss |
| 2024-10-16 | Revaluation: market value BDT 957.3m, impairment BDT 819.9m, NAV per share down BDT 4.53 |
| 2024-10-28 | FY2024: 10% cash to general shareholders (BDT 60.48m), sponsors/directors (120.64m shares) excluded; EPS 1.81 |
| 2024-11-12 | FY2024 audit: 'Qualified Opinion' and 'Emphasis of Matter' |
| 2024-12-17 | CRISL A+ / ST-3, Stable |
| 2025-04-24 | Q3 FY2025: EPS up on HFO sales 'as demand for electricity was higher'; revised post same day: NOCFPS 'decreased significantly due to significant decrease in receipt of revenue bill' |
| 2025-07-09 | Company secretary Mohammad Abir Islam, FCS, from 03-Jul-2025 |
| 2025-10-26 | FY2025: 10% cash to general shareholders (BDT 60.48m); EPS 3.19 |
| 2025-11-18 | FY2025 audit: 'Qualified Opinion', 'Material Uncertainty Related to Going Concern', 'Emphasis of Matters' |
| 2025-12-17 | CRISL A / ST-3, Stable |
| 2026-01-29 | Q2 FY2026: EPS up on lower exchange loss 'for stable exchange rate of BDT against US Dollar and Euro' |
| 2026-04-30 | Q3 FY2026: NOCFPS down on 'decrease in receipt of revenue bill from BPDB' |
| 2026-06-08 | Board (07-Jun-2026) approves merger of the three subsidiaries into the parent, cash to minorities |
| 2026-10-11 | FY2026: 15% cash to general shareholders (BDT 90.72m); EPS 5.03, NAV 57.12, NOCFPS 18.96 |
| 2026-10-25 | FY2026 audit: 'Emphasis of Matter and Other Matter' |
| 2026-11-02 | Q1 FY2027 board meeting notified for 05-Nov-2026 |
| Source: DSE news archive (stored DSE announcements archive for posts before 24-Apr-2025; old.dsebd.org for later), 3-Nov-2021 to 4-Nov-2026. | |
FAQ
- What does Doreen Power own?
- Three almost wholly owned HFO plants selling to BPDB: Dhaka Northern (55 MW), Dhaka Southern (55 MW) and Chandpur (115 MW). Its own three 22 MW gas plants stopped when their PPAs ended in 2023-2024 [1 p.18].
- What were Doreen Power's FY2026 results?
- Revenue BDT 11.70bn (-22.3%), profit to shareholders BDT 910m, EPS BDT 5.03 and NAV per share BDT 57.12 [1 p.10] [1 p.11].
- Who gets the FY2026 dividend?
- Only general shareholders: 15% cash (BDT 1.50 a share), BDT 90.72m in total; sponsors and directors holding 120.64m shares are excluded [1 p.46] [8].
- When do the PPAs end?
- 16-Jun-2031 (Dhaka Southern), 16-Aug-2031 (Dhaka Northern) and 10-Feb-2037 (Chandpur) [1 p.19].
- What is the BDT 6.3bn current account?
- Temporary loans to subsidiaries and sister concerns, net of balances inside the group; the parent's largest is BDT 3.10bn owed by Doreen Power House & Technologies Ltd [1 p.29] [1 p.44].
- What is the merger?
- The three subsidiaries are to be amalgamated into the listed company for cash paid to their minorities; the High Court admitted the scheme on 18-Aug-2026 [1 p.18] [1 p.19].
- Which results does this note use?
- Annual reports FY2018-FY2025, the audited FY2026 statements, the FY2026 quarterly statements and DSE news; the full FY2026 annual report with plant data is not yet in our corpus.
Sources
- Doreen Power Generations and Systems Ltd, audited consolidated and separate financial statements, year to 30-Jun-2026 (Hoda Vasi Chowdhury & Co) · link · accessed 2026-10-31
- Doreen Power Generations and Systems Ltd, Annual Report 2025 (year to 30-Jun-2025), incl. subsidiary statements · link · accessed 2026-10-31
- Doreen Power un-audited consolidated statements, nine months to 31-Mar-2026 · link · accessed 2026-10-31
- Doreen Power un-audited consolidated statements, half year to 31-Dec-2025 · link · accessed 2026-10-31
- Doreen Power un-audited consolidated statements, quarter to 30-Sep-2025 · link · accessed 2026-10-31
- Doreen Power Generations and Systems Ltd, Annual Report 2024 (year to 30-Jun-2024) · link · accessed 2026-10-31
- Doreen Power Generations and Systems Ltd, Annual Report 2022 (year to 30-Jun-2022, five-year data FY2018-22) · link · accessed 2026-10-31
- Dhaka Stock Exchange news archive for DOREENPWR, Nov-2024 to Oct-2026 (results, dividends, merger, asset sales, ratings) · link · accessed 2026-10-31
- Baraka Patenga Power Ltd un-audited consolidated statements, nine months to 31-Mar-2026 · link · accessed 2026-10-31
- Summit Power Ltd un-audited interim condensed statements, nine months to 31-Mar-2026 · link · accessed 2026-10-31
- United Power Generation & Distribution Co. un-audited statements, nine months to 31-Mar-2026 · link · accessed 2026-10-31
- The Daily Star, 'Bangladesh gets 3 more years for LDC graduation' (30-Oct-2026) · link · accessed 2026-10-31
- The Business Standard, 'Bangladesh gets 3 more years for LDC graduation' (30-Oct-2026) · link · accessed 2026-10-31
- AnalystBro price data (TradingView feed): DSE:DOREENPWR daily bars to 29-Oct-2026 · link · accessed 2026-10-31
- AnalystBro model for this report (workbook tabs below) · link · accessed 2026-10-31
- Doreen Power Generations and Systems Ltd, Annual Report 2023 (year to 30-Jun-2023) · link · accessed 2026-11-04
- Doreen Power, declaration of credit rating by CRISL, dated 10-Dec-2023 (AA / ST-2, rated 07-Dec-2023) · link · accessed 2026-11-04
- Doreen Power, declaration of credit rating by CRISL, dated 17-Dec-2025 (A / ST-3, rated 15-Dec-2025) · link · accessed 2026-11-04
- World Bank Pink Sheet, CMO Historical Data Monthly: crude oil, Brent (USD/bbl), to Sep-2026 · link · accessed 2026-11-04
- Bangladesh Bank NSDP, BDT per USD monthly average and end of period, to Sep-2026 · link · accessed 2026-11-04
- Bangladesh Bank policy (repo) rate decisions, MPS / MPC resolutions Jul-2020 to Sep-2026 (latest: MPS Oct-Dec 2026) · link · accessed 2026-11-04
- Bangladesh Bank, Scheduled Banks Statistics Apr-Jun 2026, Table-102 (weighted average lending rate, end-June) · link · accessed 2026-11-04
- Gas tariff for power plants: BERC order 2019/02; Energy Division SRO 14-Ain/2023, SRO 40-Ain/2024 (gazette 25-Feb-2024) and SRO 105-Ain/2024 (gazette 29-Apr-2024) · link · accessed 2026-11-04
- BERC furnace-oil price notice 06-Sep-2026 (Platts-linked monthly adjustment under order 2026/05) and BPC local selling prices (from 1-Oct-2026, read 03-Nov-2026) · link · accessed 2026-11-04
- Dhaka Stock Exchange news archive, DOREENPWR, 3-Nov-2021 to 2-Nov-2023 (stored DSE announcements archive, read 4-Nov-2026) · link · accessed 2026-11-04
- Dhaka Stock Exchange news archive, DOREENPWR, 3-Nov-2023 to 2-Nov-2025 (stored DSE announcements archive before 24-Apr-2025, read 4-Nov-2026) · link · accessed 2026-11-04
- Dhaka Stock Exchange news archive, DOREENPWR, 3-Nov-2024 to 4-Nov-2026 · link · accessed 2026-11-04
Revision history
- 04-Nov-2026: Summarised raw event/data tables; added chart findings (this version)
- 04-Nov-2026
- 04-Nov-2026
- 04-Nov-2026
- 29-Oct-2026
Disclaimer
This article is published by AnalystBro for information and education only. It is not investment, financial, legal or tax advice, not an offer or solicitation to buy or sell any security, and not a recommendation. It is based on company filings, official statistics and the sources cited, and was independently reviewed before publishing; it may still contain errors or omissions, and the data and estimates can be out of date. Fair values, forecasts and the model are estimates under stated assumptions, not predictions; past results don't indicate future returns.
AnalystBro, its owners and staff accept no responsibility or liability for any loss or damage arising from the use of, or reliance on, this article, its model or its data. Do your own research and consult a licensed adviser before making investment decisions. Any changes you make in the spreadsheet view stay in your browser and are your own.