Baraka Patenga Power financial analysis: low dispatch, capacity payments and BDT 17.7bn of debt (Oct 2026)
Baraka Patenga Power: three HFO plants at 16.7-21.5% plant factors in FY2025, EPS BDT 3.48 in FY2026 as exchange losses faded
Capacity payments from BPDB carry the group while dispatch fell from 1.54m MWh (FY2022) to 0.45m MWh (FY2025); borrowings of BDT 17.7bn and receivables of 268 days on the nine-month run rate are the balance-sheet questions.
For information only, not investment advice. AnalystBro accepts no responsibility for decisions made on it. Full disclaimer.
- BPPL owns a 50 MW HFO plant at Patenga and 51% of two HFO plants at Patiya (110 MW and 105 MW), all selling only to BPDB [1 p.4] [1 p.42] →
- Group electricity sold fell 71% from 1,537,954 MWh (FY2022) to 451,663 MWh (FY2025); plant factors were 16.7-21.5% in FY2025 [1 p.42] [18] →
- FY2026 EPS was BDT 3.48 against 1.37, with a 5% cash dividend, as exchange losses fell [9] [2 p.3] →
- About half of group profit goes to minority holders: NCI took 53% of FY2025 profit after tax [1 p.92] [18] →
- Borrowings of BDT 17.7bn at March 2026 against equity of BDT 7.8bn; receivables rose to BDT 8.7bn [2 p.2] →
Investment considerations: capacity payments carry a group that BPDB dispatched at 16.7-21.5% plant factors in FY2025
Updated 5-Nov-2026: added the business model and industry forces, fuel proceeds against fuel consumed per kWh with Brent, taka and furnace-oil prices, the exchange-loss split between loans and fuel imports, BPDB late-payment invoices and bond settlements, contingent guarantees, subsidiary dividends against profits, BB policy and lending rates, the FY2025 key audit matters in full, credit ratings and DSE category, and five years of DSE events; prices are not refreshed (29-Oct-2026 close).
Baraka Patenga Power Limited (BPPL) is a power producer and holding company. It owns and runs a 50 MW heavy fuel oil (HFO) plant at South Patenga, Chattogram, which began commercial operation on 4-May-2014 under a 15-year power purchase agreement (PPA) with the Bangladesh Power Development Board (BPDB) [1 p.104]. It also holds 51% of Karnaphuli Power Limited (KPL, 110 MW, commercial operation 20-Aug-2019) and 51% of Baraka Shikalbaha Power Limited (BSPL, 105 MW, 24-May-2019), both HFO plants at Patiya, and 52.67% of a stockbroker, Baraka Securities Limited [1 p.6] [1 p.7] [1 p.8]. Every unit of power the group sells goes to BPDB [1 p.43].
The investment case rests on contracts, not volume. Since FY2022 BPDB has called on the group's plants less and less: group sales fell from 1,537,954 MWh in FY2022 to 451,663 MWh in FY2025, and the three plants ran at average plant factors of 16.65%, 20.23% and 21.52% in FY2025 [1 p.42] [18]. Revenue fell from BDT 24.4bn to BDT 13.0bn over the same years, yet operating profit rose from BDT 3.1bn to BDT 3.3bn [1 p.51], because the PPAs pay a capacity charge for plant that is available, whether or not it runs. What has decided the bottom line is below operating profit: exchange losses on HFO imports and loans, and interest on BDT 17-26bn of borrowings.
FY2026 results, announced on 29-Oct-2026, showed consolidated EPS of BDT 3.48 against BDT 1.37, NAV per share of BDT 31.03 and operating cash flow of BDT 8.29 a share, with a 5% cash dividend (BDT 0.50 a share) [9]. The full FY2026 annual report is not in our filings corpus at 5-Nov-2026, so the detailed analysis below runs to the nine months to March 2026, where profit to owners was BDT 494m against BDT 128m a year earlier [2 p.3].
Strengths in the filings
- Capacity payments hold revenue up when dispatch falls: at BPPL's own plant, capacity proceeds rose to BDT 731m in FY2025 (+11.1%) on exchange-rate and CPI indexation while fuel proceeds fell [1 p.130] [1 p.46].
- Operating profit was BDT 3,332m in FY2025, a 25.6% margin, above FY2024's 21.7% on lower revenue [1 p.92] [18].
- Exchange losses are falling: the consolidated foreign exchange loss dropped from BDT 1,055m in FY2024 to BDT 535m in FY2025 [1 p.41], and other income/(loss) was only BDT -29m in the nine months to March 2026 [2 p.3].
- FY2026 EPS of BDT 3.48 is the highest since FY2021's BDT 6.47 (which was on 99.2m pre-IPO shares) [9] [1 p.51].
- Borrowings fell from BDT 26.0bn (June 2022) to BDT 17.7bn (March 2026), and borrowings/equity from 3.6x to 2.3x [7 p.82] [2 p.2] [18].
Weaknesses in the filings
- One customer that pays late: consolidated receivables from BPDB rose from BDT 6.06bn (June 2025) to BDT 8.69bn (March 2026), 268 days of nine-month revenue annualised [2 p.2] [18].
- Operating cash flow was negative: BDT -1,566m in FY2025 and BDT -1,491m in the nine months to March 2026, funded by short-term loans and related-party balances [1 p.94] [2 p.5].
- Minorities take about half: non-controlling interest received 53% of FY2025 profit after tax and 48% in the nine months to March 2026 [1 p.92] [2 p.3] [18].
- BPPL's own PPA and its 15-year tax exemption both run from 4-May-2014, so both end in May 2029 [1 p.104] [1 p.111]; the auditor notes plant is depreciated over 30 years, not the PPA term [1 p.83].
- Audit points: subsidiaries' auditors gave modified opinions on gratuity accounting and deferred tax, and management 'was not able to provide us fixed asset register' [1 p.83] [1 p.84].

BPPL closed Oct 26 at BDT 19.5, up from BDT 13.5 in Oct 25.
| Item | Value |
|---|---|
| Price (29-Oct-2026) | BDT 19.5 |
| 52-week range | BDT 12.6-22.4 |
| Market cap | BDT 3.37bn |
| Shares | 173.0m |
| Sponsors/directors (30-Sep-2026) | 35.76% (Baraka Power Ltd 29.25% at Jun-2025) |
| Institutions / public | 8.62% / 55.62% |
| FY2026 EPS (DSE announcement) | BDT 3.48 (FY2025: 1.37) |
| P/E on FY2026 EPS | 5.6x |
| NAV per share (30-Jun-2026, announced) | BDT 31.03 |
| P/B | 0.63x |
| FY2026 dividend / yield | BDT 0.50 (5% cash) / 2.6% |
| Borrowings (31-Mar-2026) | BDT 17.7bn; cash BDT 0.16bn |
| Fiscal year end / category | 30 June / DSE category B |
| Auditor (FY2025) | Kazi Zahir Khan & Co. (unmodified, emphasis of matter) |
| Next event | Record date 22-Nov-2026; AGM 23-Dec-2026 |
Business: a 50 MW plant plus 51% of two larger HFO plants, all under 15-year BPDB contracts
BPPL was incorporated in Sylhet on 7-Jun-2011 and signed its PPA with BPDB and its implementation agreement with the power ministry on 31-Jul-2011 [1 p.4] [1 p.10]. The Patenga plant uses eight Rolls-Royce engines of 6.984 MW each (55.872 MW in total) plus a 3.20 MW steam turbine that runs on engine exhaust heat; the company says the turbine cuts fuel cost by 6.40% a year [1 p.104]. The project was financed partly through Bangladesh Bank's IPFF facility funded by the World Bank: USD 21.975m, signed in January 2014 [1 p.10] [1 p.125].
The group grew through two larger plants. BPDB issued a letter of intent for the 110 MW Karnaphuli plant in August 2017 and for the 105 MW Shikalbaha plant in March 2018 [1 p.11]; both reached commercial operation in 2019 [1 p.6] [1 p.7]. In FY2022 each subsidiary issued 142.5m new shares to take paid-up capital to BDT 1,520m before drawing its project debt [8 p.123], which is why non-controlling interest in the group's equity rose from BDT 789m to BDT 2,129m that year [1 p.51]. BPPL itself listed on DSE and CSE through a book-building IPO in July 2021, with the cut-off price set at BDT 32 [1 p.5] [1 p.11]; its share capital is BDT 1,730m, or 173.0m shares [1 p.91].
So BPPL's consolidated accounts are mostly those of the two Patiya plants. In FY2025 KPL had revenue of BDT 5,485m and BSPL BDT 5,474m, against BDT 2,049m at the Patenga plant [1 p.130]. BPPL owns 51% of each: for every BDT 100 the subsidiaries earn, BDT 49 belongs to the other shareholders. The broker, Baraka Securities, is small: revenue of BDT -0.02m and a loss of BDT 14.7m in FY2025 [1 p.8].
The PPAs are 15-year build-own-operate contracts. The audit report states the remaining contract periods at the FY2025 report date as 3 years 6 months for BPPL, 8 years 8 months for KPL and 8 years 7 months for BSPL [1 p.84]. The revenue has three parts: capacity proceeds for available capacity, variable operation and maintenance proceeds (VOMP) per unit generated, and fuel proceeds that pass through the cost of HFO [1 p.46]. Management notes that the tariff is periodically adjusted for local and international CPI and that fuel costs are 'definable at the time of billing to BPDB' [1 p.44].
Business model. BPPL sells one product, electricity, to one buyer: 'The Company only sells to Bangladesh Power Development Board in accordance with the terms of the Power Purchase Agreement' [1 p.43]. Its own plant earns capacity proceeds, variable O&M proceeds and fuel proceeds [1 p.130]; the two 51% subsidiaries, KPL and BSPL, earned 84% of FY2025 consolidated revenue (BDT 10,959m of 13,008m) [1 p.130] [18]. The main input is HFO, bought from 'internationally reputable suppliers with offices in Singapore, including SHELL, VITOL and others' and from local BPC-approved vendors [1 p.44]. Dependable capacity is 50 MW, 110 MW and 105 MW [1 p.42]. Funding is bank debt (BDT 17.7bn at March 2026) [2 p.2], backed at June 2025 by BDT 14,100m of BPPL bank and corporate guarantees, including BDT 11,370m to City Bank for KPL's facilities [1 p.139]. Control: Baraka Power Limited holds 29.25%, labelled 'Associate Company' [1 p.53]; BPPL itself holds no equity-accounted associates (consolidated notes list only the three subsidiaries) [1 p.43].
Industry forces, as the filings describe them. Buyer: 'any unfavorable condition by BPDB may hamper its revenue and profitability' [1 p.43]. Suppliers: international HFO traders and BPC-approved local vendors [1 p.44]. Contract renewal: the PPA 'also contains provision for possible renewal after the initial term' [1 p.47], and the managing director says 'we remain optimistic about the renewal of the power purchase agreement' [1 p.39]. Substitutes: the company is 'actively exploring opportunities in the renewable energy sector' [1 p.39]; the filings name no rival plants. Rivalry and entry barriers: none disclosed.
| Plant | Owner / BPPL stake | Fuel | Capacity | COD | PPA end (15 years) |
|---|---|---|---|---|---|
| Patenga, Chattogram | BPPL, 100% | HFO | 50 MW (55.872 MW installed + 3.2 MW steam) | 04-May-2014 | May 2029 |
| Patiya, Chattogram | KPL, 51% | HFO | 110 MW | 20-Aug-2019 | Aug 2034 |
| Patiya, Chattogram | BSPL, 51% | HFO | 105 MW | 24-May-2019 | May 2034 |
| Baraka Securities (broker) | 52.67% | - | - | Apr-2022 | - |
| Date | Event |
|---|---|
| 31-Jul-2011 | PPA and implementation agreement signed |
| Jan-2014 | USD 21.975m IPFF term loan signed |
| 04-May-2014 | Patenga plant commercial operation |
| 2019 | BSPL and KPL commercial operation |
| Jul-2021 | Listed on DSE and CSE (trading from 15-Jul-2021) |
| 04-Jul-2025 | Chairman and managing director swap roles |
| 29-Oct-2026 | FY2026 results: EPS BDT 3.48, 5% cash dividend |
Dispatch and revenue: group units sold fell 71% in three years and capacity payments became most of the margin
Dispatch is the main operating variable, and BPDB decides it. Plant factors at all three plants rose in FY2022, when KPL ran at 73.26% and BSPL at 67.25%, and have fallen every year since [1 p.147] [1 p.157]. At Patenga the average plant factor went from 55.14% (FY2022) to 43.21%, 19.20% and 16.65% [8 p.39] [7 p.43] [6 p.40] [1 p.42]. In the FY2023 report the subsidiaries' directors explained the background: BPDB's bills were on average five to six months overdue against two months before, and the producers reached a verbal consensus with BPDB to run within a 35-40% plant factor to limit exchange losses when paying for oil letters of credit [7 p.126]. In FY2025 the KPL directors put the lower plant factor down to 'financial hardship faced by the country on settling bills of power plants' [1 p.147].
Revenue follows fuel, not profit. Fuel proceeds fall with dispatch: 'Fuel Proceeds is decreased due to lower power supply demand compared to the same period of earlier year' [1 p.130]. That is why consolidated revenue fell 39.1% in FY2024 and 5.0% in FY2025 while gross profit rose 10.7% in FY2025 [1 p.46] [18]. Revenue per kWh sold rose from BDT 15.88 in FY2022 to BDT 28.80 in FY2025 [18]: the fixed capacity payment is spread over fewer units.
BPPL's own revenue note shows the mix. In FY2025 capacity proceeds were BDT 731m, VOMP BDT 62m and fuel proceeds BDT 1,256m; capacity was 35.7% of revenue, against 14.4% in FY2022 [1 p.130] [7 p.114] [18]. Excluding fuel, capacity was 92.2% of what the plant earned. Capacity proceeds rose 11.1% in FY2025 'due to increase of exchange rate and CPI data' [1 p.130]. Fuel proceeds of BDT 1,256m were BDT 86m below the BDT 1,343m of fuel consumed in cost of revenue [1 p.131] [18]; the filings do not state the fuel-billing basis (heat rate or reference price) or split the gap; management says only that fuel costs are 'definable at the time of billing to BPDB' [1 p.44].
Fuel proceeds against fuel consumed. At BPPL's own plant fuel proceeds exceeded fuel consumed by BDT 214m in FY2021, BDT 136m in FY2022 and BDT 73m in FY2023, then fell short by BDT 78m in FY2024 and BDT 86m in FY2025 [19 p.106] [7 p.114] [1 p.130] [1 p.131] [18]. Per kWh sold, fuel consumed rose from BDT 12.14 (FY2022) to BDT 19.21 (FY2025) and fuel proceeds from BDT 12.73 to BDT 17.98 [18]. Over the same years Brent averaged USD 91.08, 86.82, 84.72 and 74.57 a barrel (July-June) and the taka averaged 86.30, 99.46, 111.06 and 120.44 per US dollar [20] [21]; Brent was USD 116.8 in September 2026 and BERC set BPC-supplied furnace oil at Tk 96.86 a litre from 6-Sep-2026 [20] [24]. In FY2022 the company said the rise in revenue came from a 'sharp increase in fuel proceeds resulting from rise in fuel price' [8 p.43]. KPL and BSPL revenue is not split into capacity, VOM and fuel in the filings we hold (searched AR2025 p.130, p.146-165); the same comparison cannot be made for them; nor is the US-dollar-linked share of any plant's tariff printed. The filings do tie the capacity line to the taka: capacity proceeds rose 23% in FY2023 'due to increase of foreign exchange rate, CPI adjustment and recognition of true up bill proceeds' [7 p.46], and the FY2021 report says the tariff is 'paid in foreign currency equivalent to Bangla Taka' and adjusted for CPI [19 p.39].
| FY21 | FY22 | FY23 | FY24 | FY25 | |
|---|---|---|---|---|---|
| Fuel proceeds | 1,625 | 2,964 | 2,868 | 1,318 | 1,256 |
| Fuel consumed | 1,411 | 2,828 | 2,796 | 1,396 | 1,342 |
| Proceeds less consumed (derived) | 214 | 136 | 73 | -78 | -86 |
| Fuel consumed per kWh sold (BDT, derived) | — | 12.14 | 15.01 | 17.14 | 19.21 |
| Fuel proceeds per kWh sold (BDT, derived) | — | 12.73 | 15.40 | 16.18 | 17.98 |
| FY21 | FY22 | FY23 | FY24 | FY25 | FY26 | |
|---|---|---|---|---|---|---|
| Brent (USD/bbl) | 54.12 | 91.08 | 86.82 | 84.72 | 74.57 | 79.42 |
| BDT per USD, average | 84.81 | 86.30 | 99.46 | 111.06 | 120.44 | 122.30 |
| BDT per USD, end-June | 84.81 | 93.45 | 106.00 | 118.00 | 122.78 | 122.85 |

Patenga's plant factor fell from 55.14% in FY22 to 16.65% in FY25; KPL fell from 73.26% to 20.23%.
| FY22 | FY23 | FY24 | FY25 | |
|---|---|---|---|---|
| Patenga (MWh) | 232,871 | 186,283 | 81,471 | 69,890 |
| KPL (MWh) | 693,947 | 582,870 | 276,386 | 189,376 |
| BSPL (MWh) | 611,136 | 454,347 | 199,870 | 192,397 |
| Group (MWh) | 1,537,954 | 1,223,500 | 557,727 | 451,663 |
| Revenue per kWh (BDT) | 15.88 | 18.38 | 24.55 | 28.80 |

Fuel proceeds fell from BDT 2,964m in FY22 to BDT 1,256.5m in FY25 while capacity proceeds rose to BDT 730.9m.
Line items: exchange losses and interest, not operations, set the profit; minorities take about half
Cost of revenue is mostly fuel. At BPPL's own plant, fuel consumption was BDT 1,343m of BDT 1,660m of cost of revenue in FY2025, with depreciation on plant and machinery a fixed BDT 116m, plant salaries BDT 76m and spare parts BDT 53m; spare parts rose from BDT 38m because of a major overhaul [1 p.131]. Consolidated cost of revenue fell 10.0% in FY2025 to BDT 9,370m, faster than revenue, and gross margin rose to 28.0% from 24.0% [1 p.46] [18]. Depreciation on PPE was BDT 618m for the group, of which BDT 470m sat in cost of sales [1 p.95]. Plant and machinery are depreciated at 3% a year, a 30-year life, against 15-year PPAs [1 p.95] [1 p.83].
General and administrative expenses are small and flat at BDT 306m in FY2025 against BDT 315m [1 p.132]. At BPPL they include directors' remuneration of BDT 11.8m and a share of group-office salaries of BDT 10.7m [1 p.132].
Exchange losses have been the swing line. They sit in 'Other income/(loss)' and come from paying for imported HFO and spares and from foreign-currency loans as the taka weakened. KPL and BSPL together lost BDT 2,499m on exchange in FY2023, BDT 944m in FY2024 and BDT 512m in FY2025 [1 p.147] [1 p.157] [18]. Consolidated other income/(loss) improved from BDT -1,013m to BDT -515m in FY2025 [1 p.92] and to BDT -29m in the nine months to March 2026 [2 p.3]. Each quarterly announcement in FY2026 attributed the EPS rise to 'reduced foreign exchange losses and lower financial expenses' at the subsidiaries [9].
The notes split each company's exchange loss between fuel and spares imports and term loans. In FY2025 BSPL lost BDT 110m on foreign procurement and BDT 158m on its term loan, KPL BDT 203m and BDT 41m, and BPPL BDT 4m and BDT 19m; in FY2024 the six figures were BDT 287m, 250m, 352m, 92m, 20m and 54m [1 p.133]. The outstanding US-dollar principal of the subsidiaries' loans is not printed (searched AR2025 p.124-125, p.150-165); the facilities were USD 40m for KPL (IDCOL) and USD 31.69m for BSPL (UCBL) [1 p.11].
| FY24 | FY25 | |
|---|---|---|
| BSPL: foreign procurement | -287 | -110 |
| BSPL: term loan | -250 | -158 |
| KPL: foreign procurement | -352 | -203 |
| KPL: term loan | -92 | -41 |
| BPPL: foreign procurement | -20 | -4 |
| BPPL: term loan | -54 | -19 |
Finance cost moved the other way until FY2025. Group financial expenses rose from BDT 1,705m in FY2024 to BDT 2,247m in FY2025 [1 p.92]. The KPL directors explain that 'BPDB has been unable to clear bills of the power plants within due time', so the company 'had to take higher short term financial supports from the Banks' [1 p.147]. BSPL's financial expenses were BDT 1,142m in FY2025 against BDT 586m in FY2021 [1 p.157]. In the nine months to March 2026 group financial expenses were BDT 1,689m, 5.0% below the BDT 1,778m a year earlier [2 p.3]. BPPL's own loans carry 13.5-16.0% on taka facilities and six-month SOFR plus 2.3% on the IPFF dollar loan [1 p.125]. For comparison, Bangladesh Bank's policy rate went from 4.75% (July 2020) to 10.00% (October 2024) and 9.50% from 30-Jul-2026, and the banks' weighted average lending rate was 7.24% at June 2022, 11.70% at June 2024 and 12.13% at June 2026 [22] [23].
Tax is close to nil on power revenue. BPPL holds an exemption on all taxes under the private sector power generation policy and SRO 211 for 15 years from commercial operation, and pays tax only on other income and dividends [1 p.111]; group income tax was BDT 61m in FY2025 [1 p.134]. BPPL's minimum-tax computation under section 163 covers only bank interest and dividend income [1 p.145]. Advances, deposits and prepayments were BDT 557m at BSPL, BDT 77m at KPL and BDT 145m at BPPL at June 2025 [1 p.118]; BPPL's part includes advance income tax of BDT 39m [1 p.117], and the subsidiaries' advance income tax is not split out, so the filings do not show whether they hold unexpensed minimum tax or TDS on BPDB receipts (searched AR2025 p.110-118, p.146-165). The filings print no tax-exemption end date for KPL or BSPL (searched AR2025 p.110-118, p.146-165). Workers' profit participation fund (WPPF) provisions are not made while BIPPA's request for exemption is pending with the labour ministry, which the auditors flag as an emphasis of matter [1 p.110] [1 p.83]. The unprovided amount is not printed. Provisions stopped in FY2022: the auditor noted no WPPF provision that year 'though the comparative Financial Statements has maintained WPPF provision' [8 p.44] [26].
Last comes the split between owners and minorities. In FY2025 the group earned BDT 511m after tax, of which BDT 238m (EPS BDT 1.37) belonged to BPPL's owners and BDT 273m to non-controlling interest [1 p.92]. Over FY2021-FY2025 the NCI share of profit after tax ranged from 27% to 65% [18]. BPPL's own standalone profit was only BDT 15.9m (EPS BDT 0.09), down 70.5% on lower dispatch, lower dividends from subsidiaries (BDT 62m against BDT 116m) and higher financial expenses [1 p.46] [1 p.133].
Cash moving up from the subsidiaries has fallen. BPPL received dividends of BDT 271m in FY2022, BDT 233m in FY2023, BDT 116m in FY2024, BDT 62m in FY2025 and nothing in the nine months to March 2026, against its 51% share of KPL and BSPL profit of BDT 220m, BDT -68m, BDT 131m and BDT 291m in FY2022-FY2025 [7 p.92] [1 p.101] [2 p.12] [1 p.147] [1 p.157] [18]. The filings give no dividend policy or lender restriction for the subsidiaries (searched AR2025 p.146-165).
| FY22 | FY23 | FY24 | FY25 | |
|---|---|---|---|---|
| KPL profit after tax | 379 | 155 | 165 | 416 |
| BSPL profit after tax | 52 | -289 | 91 | 155 |
| BPPL 51% share (derived) | 220 | -68 | 131 | 291 |
| Dividends received by BPPL | 271 | 233 | 116 | 62 |
| FY21 | FY22 | FY23 | FY24 | FY25 | |
|---|---|---|---|---|---|
| KPL revenue | 2,247 | 10,882 | 10,333 | 6,396 | 5,485 |
| KPL exchange gain/(loss) | -105 | -623 | -1,136 | -408 | -244 |
| KPL financial expenses | 515 | 534 | 610 | 601 | 840 |
| KPL profit after tax | 445 | 379 | 155 | 165 | 416 |
| BSPL revenue | 2,872 | 9,897 | 8,492 | 5,229 | 5,474 |
| BSPL exchange gain/(loss) | -66 | -749 | -1,363 | -537 | -268 |
| BSPL financial expenses | 586 | 533 | 648 | 898 | 1,142 |
| BSPL profit/(loss) after tax | 399 | 52 | -289 | 91 | 155 |

Subsidiary exchange loss fell from BDT 2,498.9m in FY23 to BDT 512.4m in FY25, while financial expenses rose to BDT 1,982.5m.

Profit to owners was BDT 237.5m in FY25 after a BDT 183.5m loss in FY23; non-controlling interest took BDT 273.1m.
| Item | BDT mn | % of cost |
|---|---|---|
| Fuel consumption | 1342.5 | 0.809 |
| Depreciation on plant & machinery | 116.3 | 0.07 |
| Plant salaries & allowances | 75.6 | 0.046 |
| Spare parts | 53.5 | 0.032 |
| Lubricants & chemicals | 29.6 | 0.018 |
| Other | 42.8 | 0.026 |
| Total | 1660.3 | 1.0 |
FY2026 results: EPS BDT 3.48, every quarter profitable, 5% cash dividend
FY2026 is already reported in outline. The board met on 28-Oct-2026 and DSE published the results on 29-Oct-2026: consolidated EPS BDT 3.48 (FY2025: 1.37), NAV per share BDT 31.03 (27.72) and net operating cash flow per share BDT 8.29 (-9.05), with a 5% cash dividend, record date 22-Nov-2026 and AGM on 23-Dec-2026 [9]. On 173.0m shares, EPS of BDT 3.48 implies about BDT 602m of profit to owners [18]. The nine-month EPS was BDT 2.86 [2 p.3], so the April-June 2026 quarter contributed about BDT 0.62 a share, against BDT 0.63 derived for April-June 2025 [18].
The quarters show the turn. Profit to owners was a loss of BDT 22.7m in July-September 2024 (EPS BDT -0.13), BDT 1.1m in October-December 2024 and BDT 149.8m in January-March 2025 [4 p.3] [3 p.3] [2 p.3]; the DSE releases confirm the loss quarter and the H1 FY2025 EPS of BDT -0.12 [9]. In FY2026 every quarter was profitable: BDT 114.1m, 133.4m and 246.7m, with EPS of BDT 0.66, 0.77 and 1.43 [4 p.3] [3 p.3] [2 p.3]. Revenue fell over the same quarters, from BDT 3,551m to BDT 2,572m, while the discrete-quarter gross margin rose to 43.3% in January-March 2026 [18].
Two reporting points matter for anyone rebuilding the quarters. The H1 FY2026 income statement prints BDT 258.3m as profit to owners for October-December 2025 and nothing for non-controlling interest, which is the total profit after tax; the BDT 0.77 EPS printed beside it matches BDT 133.4m, the figure derived from H1 less Q1 [3 p.3] [5] [18]. And the nine-month column for financial expenses is BDT 17.5m higher than H1 plus the reported third quarter, offset in other income [2 p.3] [3 p.3]; profit is unaffected.
| Q1 FY25 | Q2 FY25 | Q3 FY25 | Q4 FY25 | Q1 FY26 | Q2 FY26 | Q3 FY26 | |
|---|---|---|---|---|---|---|---|
| Revenue | 4,154 | 2,723 | 3,304 | 2,827 | 3,552 | 2,765 | 2,572 |
| Gross profit | 835 | 896 | 1,132 | 774 | 858 | 937 | 1,113 |
| Financial expenses (reported) | 566 | 794 | 418 | 469 | 574 | 548 | 549 |
| Profit to owners | -23 | 1 | 150 | 109 | 114 | 133 | 247 |
| EPS (BDT) | -0.13 | 0.01 | 0.87 | 0.63 | 0.66 | 0.77 | 1.43 |

Q3 FY26 EPS of BDT 1.43 was the highest of the eight quarters; Q4 FY26 was BDT 0.62.
Ratios: margins rose as volume fell, but owners kept under 2% of revenue in FY2022-FY2025
Seven years of consolidated history show three phases [1 p.51] [7 p.50] [18]. In FY2019-FY2021, before the subsidiaries ran at scale, owners' profit was BDT 288-642m and ROE on owners' equity was 20%-25%. In FY2022-FY2023 revenue jumped to BDT 22-24bn on high dispatch, but exchange losses cut owners' profit to BDT 215m and then a loss of BDT 184m. In FY2024-FY2025 revenue halved, margins widened and owners' profit recovered to BDT 69m and then BDT 238m, an ROE of 5.1%.
Margins move opposite to volume. Gross margin was 14.1% in FY2022, when fuel pass-through was largest, and 28.0% in FY2025; operating margin went from 12.9% to 25.6% [18]. The owners' profit margin was below 2% in every year from FY2022 to FY2025, because finance cost, exchange loss and the NCI share take most of operating profit [18].
Coverage is thin but improving. Operating profit covered financial expenses 1.74x in FY2024, 1.48x in FY2025 and 1.58x in the nine months to March 2026 [18]. Net debt was 5.4x EBITDA (operating profit plus depreciation) in FY2024 and 4.3x in FY2025 [18]. Total liabilities fell from 7.9x total equity in FY2019 to 2.7x in FY2025 [18].
Payout has followed earnings down. The cash dividend was 10-12.5% of par in FY2019-FY2022, 5% in FY2023, 2% in FY2024 and FY2025 and 5% for FY2026 [1 p.51] [7 p.50] [9]. The FY2025 payout was 15% of EPS and the FY2026 dividend is 14% of EPS [18]. The 5% dividend for FY2023 was declared for a loss year [1 p.51].
| FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | |
|---|---|---|---|---|---|---|---|
| Revenue | 3,429 | 5,449 | 7,336 | 24,423 | 22,484 | 13,694 | 13,008 |
| Gross profit | 777 | 2,527 | 2,868 | 3,436 | 4,192 | 3,286 | 3,638 |
| Operating profit | 648 | 2,259 | 2,601 | 3,146 | 3,874 | 2,970 | 3,332 |
| Profit to owners | 288 | 433 | 642 | 215 | -184 | 69 | 238 |
| Profit to NCI | 13 | 241 | 414 | 207 | -70 | 127 | 273 |
| EPS (BDT) | 2.90 | 4.37 | 6.47 | 1.25 | -1.06 | 0.40 | 1.37 |
| NAV per share (BDT) | 19.63 | 23.00 | 28.48 | 28.92 | 26.81 | 26.57 | 27.72 |
| NOCF per share (BDT) | 0.43 | 14.40 | 3.79 | 4.13 | 22.54 | 3.85 | -9.05 |
| DPS (BDT) | 1.00 | 1.00 | 1.25 | 1.00 | 0.50 | 0.20 | 0.20 |
| FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | |
|---|---|---|---|---|---|---|---|
| Revenue growth | — | 58.9% | 34.6% | 232.9% | -7.9% | -39.1% | -5.0% |
| Gross margin | 22.7% | 46.4% | 39.1% | 14.1% | 18.6% | 24.0% | 28.0% |
| Operating margin | 18.9% | 41.5% | 35.5% | 12.9% | 17.2% | 21.7% | 25.6% |
| Owners' profit margin | 8.4% | 8.0% | 8.8% | 0.9% | -0.8% | 0.5% | 1.8% |
| NCI share of PAT | 4.4% | 35.7% | 39.2% | 49.0% | 27.5% | 64.8% | 53.5% |
| ROE (owners, average) | — | 20.5% | 25.1% | 5.5% | -3.8% | 1.5% | 5.1% |
| Liabilities / equity (x) | 7.9x | 6.9x | 5.5x | 3.7x | 3.7x | 3.2x | 2.7x |
| Payout | 34.5% | 22.9% | 19.3% | 80.0% | — | 50.0% | 14.6% |

Gross margin recovered to 28% in FY25 from 14.1% in FY22, against 46.4% in FY20.
Balance sheet: BDT 17.7bn of borrowings, half short-term, and BPDB receivables of 268 days
Borrowings are large against the equity. At 31-Mar-2026 the group owed BDT 17,732m: term loans BDT 8,441m, short-term 'other financial facility' BDT 8,708m, redeemable preference shares BDT 574m and leases BDT 8m, against cash of BDT 157m and total equity of BDT 7,757m [2 p.2] [18]. Short-term facilities were 49% of borrowings. The total fell from BDT 25,979m in June 2022 [7 p.82] [18], but rose slightly in the nine months to March 2026 as BDT 2,140m of new short-term loans replaced BDT 1,035m of term loan repayment [2 p.5].
The term-loan maturity profile moved during FY2025. BSPL's current maturity of term loans rose from BDT 339m to BDT 3,687m at June 2025 [1 p.125]; by March 2026 the group's non-current term loans were BDT 6,079m and the current portion BDT 2,362m [2 p.2], while the nine-month cash flow shows net term-loan repayment of BDT 1,035m [2 p.5]. By company, BSPL's current maturity fell to BDT 1,122m from BDT 3,687m and its non-current term loans rose to BDT 3,612m from BDT 1,501m, while KPL's current maturity rose to BDT 782m from BDT 507m [2 p.33]; the nine-month notes do not say whether BSPL's loans were rescheduled or refinanced, or name lender, tenor or rate (searched 9M FY2026 p.2-42). BPPL's own loans are secured on project land and all assets, an escrow and debt-service account, a corporate guarantee from Baraka Power Limited and directors' personal guarantees [1 p.125]. CRAB rated the company AA2 long term and ST-2 short term, stable, in a surveillance rating announced on 1-Jan-2026 [9].
Receivables are where cash is tied up. Group receivables were BDT 5,535m at June 2024, BDT 6,063m at June 2025 and BDT 8,687m at March 2026 [1 p.91] [2 p.2]; on annual or annualised revenue that is 148, 170 and 268 days [18]. At June 2022 receivables were BDT 13,088m, or 196 days [7 p.82] [18]. BPPL's own ageing at June 2025 had BDT 476m (45%) at 91-180 days and BDT 134m at 181-365 days, nothing over a year and no provision [1 p.118]. By March 2026 BPPL's own receivable had doubled to BDT 2,096m, with BDT 1,012m at 181-365 days [2 p.28]. KPL's receivable was BDT 2,682m at June 2025 [1 p.152]; the subsidiaries' ageing and any BPDB deductions are not printed (searched AR2025 p.145-165). Management says that despite BPDB's 'irregular' payments 'there is little chance that BPDB will default' [1 p.43].
Late-payment interest and bonds. BPPL billed BPDB for delay interest but has not booked it: it 'raised an invoice amounting Tk. 388,003,141' for 'delay in realization of monthly revenue from May 2014 to December 2023', and 'The invoice is not recognized as revenue considering the certainty of realization' [6 p.131]; the year before the invoice was Tk. 278,440,616 to December 2022 [7 p.124]. The FY2025 report does not repeat it, and no such claim is printed for KPL or BSPL (searched 'invoice', 'delay', 'realization' in AR2025). BPDB settled part of its arrears in bonds: from February to October 2024 KPL 'accepted bonds amounting to Tk. 6,443,853,000' and BSPL Tk. 4,615,849,000 'for settlement of dues from BPDB' [6 p.133] [6 p.142]. Coupon, tenor and whether the bonds were held or sold are not printed (searched 'bond' in AR2024, AR2025, 9M FY2026).
| Item | BDT mn | Period / date |
|---|---|---|
| BPPL delay-interest invoice to Dec-2022 (not booked) | 278.4 | May-2014 to Dec-2022 |
| BPPL delay-interest invoice to Dec-2023 (not booked) | 388.0 | May-2014 to Dec-2023 |
| KPL: BPDB bonds accepted | 6443.9 | Feb-Oct 2024 |
| BSPL: BPDB bonds accepted | 4615.8 | Feb-Oct 2024 |
| BPPL receivable from BPDB, Mar-2026 | 2095.8 | 31-Mar-2026 |
| of which 181-365 days | 1012.2 | 31-Mar-2026 |
Cash conversion follows BPDB's payments. Cash received from customers was 96% of revenue in FY2025 and 70% in the nine months to March 2026, against 129% in FY2024 when arrears were collected [1 p.94] [2 p.5] [18]. Operating cash flow after interest was BDT 665m in FY2024, BDT -1,566m in FY2025 and BDT -1,491m in the nine months [1 p.94] [2 p.5]. The DSE announcement shows operating cash flow of BDT 8.29 a share for FY2026, about BDT 1.4bn [9] [18]; the post gives no reason for the turn, and the FY2026 cash-flow statement is not in our corpus at 5-Nov-2026. The earlier negative figures were explained by DSE posts as 'a lesser amount received from the customer' (FY2025) and 'lower amounts received from customers' (nine months) [29] [30]. Capex is negligible at BDT 9-38m a year [1 p.94] [2 p.5].
Related-party balances and other items deserve attention. The group owed related parties BDT 705m at March 2026 against BDT 5m at June 2024 [2 p.2] [1 p.91]; at June 2025 BPPL itself owed BDT 125m to Baraka Power Limited as a short-term loan [1 p.47], after borrowing BDT 369m and repaying BDT 248m in the year [1 p.141]. Of the consolidated BDT 678m at June 2025, BSPL owed BDT 471m and KPL BDT 82m to parties the notes do not name, and no rate or terms are printed [1 p.128] [1 p.141]. Baraka Power Limited, which also guarantees BPPL's loans [1 p.125], is shown by DSE as 'Operation Shutdown' [11]. BSPL holds BDT 383m as 'Investment in Other Companies', recorded in its cash flow as 'Investment in Share Money Deposit' [1 p.116] [6 p.107]; the notes do not name the investee (searched AR2025 p.116, p.162; AR2024 p.107). BPPL also carries BDT 11.0m receivable from Fusion Holdings (Pvt.) Ltd., unchanged for two years [1 p.119]. Inventories were BDT 2,034m at March 2026 [2 p.2]. At June 2025 BPPL held HFO of BDT 322m (4,540,615 litres) and spares of BDT 268m, while BSPL held BDT 1,216m and KPL BDT 885m, not split by item [1 p.116]; inventories are a key audit matter [1 p.87].
Contingent liabilities. BPPL's guarantees totalled BDT 14,100m at June 2025: a corporate guarantee of BDT 11,370m to City Bank for KPL's capital machinery and working-capital facility (to 02-Oct-2026), BDT 1,850m and BDT 250m to UCB for BSPL, BDT 555m of bank guarantees to IDCOL for KPL's dollar loan and a BDT 70m operational-security guarantee to BPDB; 'There is no commitment has made by the company against Capital Expenditure' [1 p.139].
| Item | BDT mn |
|---|---|
| Corporate guarantee to City Bank for KPL | 11,370 |
| Corporate guarantees to UCB for BSPL | 2,100 |
| Bank guarantees to IDCOL for KPL | 555 |
| Bank guarantees to BPDB and customs | 75 |
| Total | 14,100 |
| Jun-22 | Jun-23 | Jun-24 | Jun-25 | Mar-26 | |
|---|---|---|---|---|---|
| Term loans | 10,807 | 10,555 | 9,696 | 9,467 | 8,442 |
| Other financial facility (short-term) | 13,758 | 12,225 | 9,809 | 7,480 | 8,708 |
| Preference shares | 1,328 | 1,108 | 776 | 716 | 574 |
| Borrowings | 25,979 | 23,940 | 20,300 | 17,674 | 17,732 |
| Cash | 776 | 2,290 | 976 | 549 | 157 |
| Net debt | 25,202 | 21,650 | 19,324 | 17,125 | 17,574 |
| Total equity | 7,128 | 6,478 | 6,438 | 6,846 | 7,757 |
| Borrowings / equity (x) | 3.6x | 3.7x | 3.1x | 2.6x | 2.3x |
| Accounts receivables | 13,088 | 9,454 | 5,535 | 6,063 | 8,687 |
| Receivable days | 196 | 153 | 148 | 170 | 268 |

Receivables aged 91-180 days rose to BDT 475.8m at Jun-2025 from BDT 253.7m; none was over 365 days.
| FY2024 | FY2025 | 9M FY2025 | 9M FY2026 | |
|---|---|---|---|---|
| Cash receipts from customer | 17,629 | 12,486 | 8,162 | 6,261 |
| Cash paid to suppliers | -14,514 | -11,309 | -7,145 | -6,063 |
| Financial expenses paid | -1,689 | -1,937 | -1,413 | -1,420 |
| Net cash from operations | 665 | -1,566 | -948 | -1,491 |
| Acquisition of PPE | -38 | -15 | -12 | -9 |
| Short-term loan, net | 510 | 772 | -732 | 2,140 |
| Related parties, net | -317 | 873 | 844 | 184 |
| Dividends paid | -196 | -99 | -82 | -34 |
| Cash collected / revenue | 128.7% | 96.0% | 80.2% | 70.5% |
| Facility | Rate | Expiry |
|---|---|---|
| UCBL & TBL IPFF (USD) | 6m SOFR + 0.30% + 2.0% | 30-Oct-2025 |
| TBL PFI loan | 14.00% | 28-Sep-2026 |
| UCBL reschedule / TBL takeover | 14.50% / 13.50% | 30-Dec-2027 |
| LankaBangla Finance | 15.00% | 01-Apr-2027 |
| IPDC Finance | 16.00% | 11-May-2028 |
Peers: of four listed IPPs, BPPL is smallest by revenue and keeps the lowest share of revenue for owners
We compare BPPL with three listed independent power producers on the same basis: consolidated, nine months July 2025 to March 2026, each from its own un-audited statements [2 p.3] [12 p.3] [13 p.3] [14 p.3]. Labels differ and are quoted in the exhibit. UPGDCL's owners' line is 'Total comprehensive income attributable to: Owners of the Company', and its other comprehensive income was nil; Doreen prints 'Shareholders of the Company'. Receivables are also labelled differently: BPPL 'Accounts Receivables', Summit 'Trade receivables', UPGDCL and Doreen 'Trade and other receivables' (UPGDCL also shows BDT 10,290m 'Receivable from related parties' separately, not included) [2 p.2] [12 p.2] [13 p.2] [14 p.2].
Within these four, BPPL is the smallest by revenue (BDT 8.9bn) and has the second-highest share of profit going to minorities, 48.3%, against 59.3% at Summit and under 2% at UPGDCL and Doreen [18]. Its gross margin of 32.7% is 8.4pp above Summit's and 8.7pp below UPGDCL's [18]. Receivables equal to 268 days of nine-month revenue compare with 317 at Summit, 242 at UPGDCL and 214 at Doreen, so BPPL is second-highest of the four [18]. Owners kept 5.6% of revenue, the lowest of the four [18].
| BPPL | SUMITPOWER | UPGDCL | DOREENPWR | |
|---|---|---|---|---|
| Revenue | 8,888 | 23,601 | 24,015 | 9,206 |
| Gross margin | 32.7% | 24.4% | 41.4% | 24.9% |
| Profit after tax, total | 957 | 3,868 | 8,661 | 758 |
| Profit to owners (as labelled) | 494 | 1,574 | 8,514 | 754 |
| Share of PAT to NCI | 48.3% | 59.3% | 1.7% | 0.5% |
| EPS as printed (BDT) | 2.86 | 1.47 | 14.69 | 4.16 |
| Receivables (as labelled) | 8,687 | 27,305 | 21,219 | 7,190 |
| Receivable days | 268 | 317 | 242 | 214 |
| NAV per share (BDT) | 30.34 | 40.71 | 82.08 | 56.26 |
Governance: a Baraka-group company with audit points at the subsidiaries and no expansion approved in 24 months
Control sits with the Baraka group. At June 2025 Baraka Power Limited held 29.25% of BPPL, and directors and their spouses held further stakes, including 2.40% each for Faisal Ahmed Chowdhury and Gulam Rabbani Chowdhury [1 p.53]. DSE shows sponsors and directors at 35.76%, institutions 8.62% and the public 55.62% at 30-Sep-2026 [10]. Baraka Power Limited is itself listed (BARKAPOWER); DSE shows it in category Z with operational status 'Operation Shutdown' [11]. BPPL is in category B [10].
The top roles changed on 4-Jul-2025: Gulam Rabbani Chowdhury resigned as managing director to comply with the Corporate Governance Code, as he is managing director of several other companies, and became chairman, and Faisal Ahmed Chowdhury moved from chairman to managing director for five years [1 p.49] [9]. An independent director, Shamima Akhter, was appointed on 14-Nov-2025 [1 p.49]. The board met 10 times in FY2025 [1 p.52]. One disclosure does not reconcile: the directors' remuneration of BDT 11.76m is shown as paid to Monzur Kadir Shafi as managing director for July 2024 to June 2025 [1 p.141], while the attendance table records him as having resigned on 18-Aug-2024 [1 p.52]; DSE posted on 19-Aug-2024 that Gulam Rabbani Chowdhury became managing director from 18-Aug-2024 [28].
Audit. Kazi Zahir Khan & Co. gave an unmodified opinion on the FY2025 accounts with emphasis on the 30-year depreciation life and the missing WPPF provision [1 p.83]. The report repeats qualifications from the subsidiaries' own auditors (Malek Siddiqui Wali): gratuity on a cash basis at KPL, no gratuity arrangement and BDT 1.89 crore of unrecognised deferred tax at BSPL [1 p.83]. Other matters include no actuarial valuation, no fixed asset register provided, and tank-rent leases not recognised under IFRS 16 at both subsidiaries [1 p.84] [1 p.85]. The subsidiaries' auditors note that, on the 30-year life, plant and machinery of BDT 317 crore (KPL) and BDT 328 crore (BSPL) remains at the end of the original PPAs [1 p.84]. The receivables key audit matter refers to 'developing the software and sale of service', which does not describe a power producer [1 p.87]. DSE posted the auditor's emphasis paragraphs on 24-Dec-2025 [9].
The five key audit matters in the FY2025 report are quoted in the exhibit below. The receivables matter refers to 'significant large numbers of individual customers' and to 'developing the software and sale of service', although BPDB is the only customer [1 p.87] [1 p.43].
| Matter | Auditor's description |
|---|---|
| Valuation of PPE | 'The carrying value of property, plant & equipment amounts to Tk. 2,884,959,306 which is 44.83% of total assets. ... There is a risk of: determining which costs meet the criteria for capitalization; determining the date on which the assets is recognized to property, plant & equipment and depreciation commences; the estimation of economic useful lives and residual values assigned to property, plant & equipment. We identified the carrying value of property, plant & equipment as a key audit matter because of the high level of management judgement involved and because of its significance to the financial statements.' |
| Inventories | 'Inventories represent about 09.62% of the total assets of the Company; inventories are thus a material item to the financial statements. ... management is required to make judgments in determining whether inventories are being appropriately valued and also need to make provision for aged inventories, if required. Due to the value and volume of inventories being held by the Company at the reporting date and presentation thereof, inventories has been considered as a key audit matter.' |
| Accounts receivable | 'The total amount of Account Receivable is Tk. 1,060,906,443 as at June 30, 2025 which is 16.48% of total assets of the Company. There are significant large numbers of individual customers. ... The increasing challenges over the economy and operating environment in developing the software and sale of service during the year have increased the risks of default on receivables from the customers. ... we identified the recoverability of receivables as a key audit matter because of the significance of receivables to Company's Financial Position and because of the significant degree of management judgment involved in evaluating the adequacy of the allowance for doubtful debts.' |
| Term loan & other financial facility | 'As at June 30, 2025, the reported amount of Term loan is Tk. 1,138,245,930 & Short-Term Working Capital Facility is Tk. 266,330,461 which represents 21.82% of total equity & liabilities for the Company. The Company dependent on loan liabilities to operate the business. Therefore, bank and financial institution loan has been considered as key audit area.' |
| Revenue recognition | 'Revenue of Tk. 2,049,058,793 is recognized ... We identified revenue recognition as a key audit matter because revenue is one of the key performance indicators of the Company and therefore there is an inherent risk of manipulation of the timing of recognition of revenue by management to meet specific targets or expectations.' |
Our sweep of 24 months of DSE news (November 2024 to October 2026) found results, dividends, record dates, credit ratings, the management change and auditor notices; we found no board decision on new plants, capex, acquisitions or rights issues [9]. The FY2025 annual report says management aims at 'expanding into renewable energy' [1 p.41], and the KPL and BSPL directors say each has 'submitted suitable proposal to BPDB' for renewable generation [1 p.147] [1 p.157]; no size, cost or approval date is disclosed.
Over five years DSE posts show a stable credit rating and a category downgrade: CRISL rated BPPL AA2 / ST-2 (31-Jan-2022) and CRAB AA2 / ST-2 in each surveillance from December 2022 to January 2026 [26] [27] [28] [30]. DSE moved the share from N to A on 25-Jan-2022 after the 12.50% FY2021 dividend, and from A to B on 26-Dec-2023 'as the Company has approved 5% Cash Dividend for the year ended June 30, 2023' [26] [27]. The FY2023 dividend was reported disbursed on 20-May-2024, against 23-Jan-2023 for FY2022, 3-Feb-2025 for FY2024 and 1-Feb-2026 for FY2025 [27] [28] [29] [30]; the posts give no reason for the later date. The FY2021 auditor's note gave the remaining PPA terms then as '7 years 11 months, 13 years 2 months and 12 year 11 months' for BPPL, KPL and BSPL [25]. The exhibit lists the events; routine board-meeting schedules, record-date and price-limit posts are left out.
| Event type | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|
| Results and dividend | 0 | 1 | 1 | 1 | 1 | 2 | 6 |
| Rating | 0 | 2 | 1 | 1 | 0 | 1 | 5 |
| Results / audit | 1 | 1 | 0 | 1 | 0 | 0 | 3 |
| Dividend and category | 0 | 1 | 1 | 1 | 0 | 0 | 3 |
| Board / management | 0 | 0 | 0 | 1 | 1 | 0 | 2 |
| Other | 0 | 1 | 0 | 0 | 0 | 0 | 1 |
| Total | 1 | 6 | 3 | 5 | 2 | 3 | 20 |
Material events in Exhibit 30:
- 27-Oct-2022: FY2022: 10% cash, EPS 1.25, down on a significant increase of exchange loss.
- 29-Oct-2023: FY2023: 5% cash, EPS -1.06 on exchange loss on HFO and spares imports.
- 24-Dec-2023: Category A to B from 26-Dec-2023.
- 07-Jul-2025: Chairman and managing director swap roles from 04-Jul-2025.
- 29-Oct-2026: FY2026: 5% cash, EPS 3.48, NAV 31.03, NOCFPS 8.29.
| Holder | Jun-2025 | Sep-2026 |
|---|---|---|
| Sponsors / directors (DSE) | 35.76% | 35.76% |
| of which Baraka Power Limited | 29.25% | n/a |
| Institutions | 8.77% | 8.62% |
| Public | 55.47% | 55.62% |

DPS was BDT 0.5 in FY26, up from BDT 0.2 in FY24-FY25 but below BDT 1.25 in FY21.
| Item | Where | Type |
|---|---|---|
| Plant depreciated over 30 years vs 15-year PPA | BPPL, KPL, BSPL | Emphasis of matter |
| No WPPF provision (BIPPA exemption request) | BPPL, KPL, BSPL | Emphasis of matter |
| Gratuity on cash basis | KPL | Qualified (subsidiary auditor) |
| No gratuity arrangement; BDT 1.89 crore deferred tax not recognised | BSPL | Qualified (subsidiary auditor) |
| Fixed asset register not provided; no actuarial valuation | Group | Other matter |
| Tank-rent leases not recognised under IFRS 16 | KPL, BSPL | Other matter |
| Event type | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|
| Results and dividend | 1 | 1 | 2 | 4 |
| Rating | 1 | 0 | 1 | 2 |
| Board / management | 0 | 1 | 0 | 1 |
| Results / audit | 0 | 1 | 0 | 1 |
| Total | 2 | 3 | 3 | 8 |
Material events in Exhibit 34:
- 07-Jul-2025: New chairman and managing director from 04-Jul-2025.
- 24-Dec-2025: Auditor emphasis of matter notice.
- 29-Oct-2026: FY2026: EPS 3.48, NAV 31.03, 5% cash dividend.
What's next: dividend record date and AGM in Nov-Dec 2026, then loan expiries and the May-2029 Patenga PPA end
Dated items already disclosed, and the line each moves (direction only, no forecast):
| Date | Event | Line it moves | Source |
|---|---|---|---|
| 22-Nov-2026 | Record date for the 5% FY2026 dividend | Cash, equity | [s9] |
| 23-Dec-2026 | AGM; FY2026 annual report with plant data | All lines (full FY2026 detail) | [s9] |
| 30-Jun / 24-Jul / 25-Jul-2026 | Expiry of BPPL corporate guarantees to UCB for BSPL (BDT 1,850m, 250m) and the BDT 70m BPDB operational-security guarantee (passed; renewal not yet in a filing) | Contingent liabilities | [s1 p.139] |
| 02-Oct-2026 | BPPL's BDT 11,370m corporate guarantee to City Bank for KPL expires (passed; renewal not yet in a filing) | Contingent liabilities | [s1 p.139] |
| 01-Apr-2027 | LankaBangla term loan expiry | Finance cost, borrowings | [s1 p.125] |
| 30-Dec-2027 | UCBL/TBL rescheduled loan expiry | Finance cost, borrowings | [s1 p.125] |
| 11-May-2028 | IPDC term loan expiry | Finance cost, borrowings | [s1 p.125] |
| May-2029 | Patenga PPA and 15-year tax exemption end | Capacity revenue (down), tax (up) | [s1 p.104, p.111] |
| 24-Nov-2029 | Bangladesh LDC graduation (moved from 24-Nov-2026) | No PPA clause found that refers to it | [s15] [s16] |
| 2034 | BSPL and KPL PPAs end (15 years from 2019 commercial operation) | Capacity revenue (down) | [s1 p.6-7, p.84] |
Two dates have already passed: the IPFF dollar loan was due to expire on 30-Oct-2025 and the TBL PFI loan on 28-Sep-2026 [1 p.125] (passed); the March 2026 statements still show term loans, and the repayment outcome is not yet in a filing we hold. The UN General Assembly adopted Bangladesh's three-year deferral of LDC graduation to 24-Nov-2029 on 29-Oct-2026 in New York (30-Oct in Dhaka) [15] [16]; we found no clause in BPPL's filings that ties its tariffs, tax exemption or loans to LDC status.
Risks: BPDB payment delays, the 2029 Patenga PPA end and the taka
Each risk below is tied to the line it moves and to a figure in the filings. The size test is owners' profit of BDT 238m in FY2025 and about BDT 602m implied for FY2026 [1 p.92] [9] [18].
| Risk | Line it moves | Evidence |
|---|---|---|
| BPDB pays late | Receivables, short-term debt, finance cost | Receivables BDT 8.7bn, 268 days (Mar-2026); CFO negative in FY2025 |
| Patenga PPA end (May 2029) | Capacity revenue, tax | Capacity proceeds BDT 731m in FY2025; tax exemption also ends |
| Low dispatch | Fuel and VOM revenue, spare-parts cost | Plant factors 16.7-21.5% in FY2025 |
| Taka depreciation | Exchange loss (other income) | Subsidiary exchange loss BDT 2,499m in FY2023 |
| Interest rates on taka loans | Financial expenses | BDT 2,247m in FY2025; taka loans at 13.5-16.0% |
| Depreciation life vs PPA | Depreciation, asset values | 30-year life vs 15-year PPA (emphasis of matter) |
| WPPF exemption refused | Expenses | No WPPF provision while BIPPA request is pending |
| Related-party balances | Cash, payables | BDT 705m payable to related parties (Mar-2026); BDT 383m undisclosed investee |
| Minority share | Profit to owners | NCI took 48-54% of PAT in FY2025 and 9M FY2026 |
| Fuel price and billing basis | Fuel proceeds vs fuel cost | Fuel proceeds BDT 86m below fuel consumed at BPPL in FY2025; Brent USD 116.8 (Sep-2026) |
| Group guarantees | Contingent liabilities | BDT 14,100m of BPPL guarantees for KPL and BSPL (Jun-2025) |
Two of these are dated. BPPL's own plant earned BDT 731m of capacity proceeds in FY2025 [1 p.130]; when its PPA ends in May 2029 that line depends on whether BPDB renews, and the auditor notes management relies on the PPA's renewal option for its 30-year depreciation life [1 p.83]. Exchange risk is undated but proven: in FY2023 the subsidiaries' exchange losses of BDT 2,499m turned the group to a loss [1 p.147] [1 p.157] [1 p.51]. Management states it has not entered into derivatives to hedge currency risk [1 p.44].
Key questions: collections, exchange losses and the Patenga PPA decide returns to shareholders
Key questions and the signposts that answer them
- Did BPDB pay down arrears after March 2026? Signpost: receivables and short-term facilities in the FY2026 annual report (before the 23-Dec-2026 AGM).
- How much of the FY2026 profit is lower exchange loss rather than operations? Signpost: other income/(loss) note for FY2026.
- Does BPDB renew the Patenga PPA before its 2029 expiry, and on what terms? Signpost: any DSE disclosure on renewal before May 2029.
- Can dividends rise with EPS while operating cash flow swings? Signpost: FY2026 cash flow statement and the FY2027 dividend.
- What is the BDT 383m BSPL investment? Signpost: the investee named in the FY2026 notes.
BPPL closed at BDT 19.5 on 29-Oct-2026 [17]. On the announced FY2026 figures that is 5.6x EPS of BDT 3.48 and 0.63x NAV per share of BDT 31.03, and the BDT 0.50 dividend is 2.6% of the price [9] [18]. Market capitalisation is BDT 3.37bn [10]. Over the past 52 weeks the price ranged from BDT 12.6 to BDT 22.4 [10]. These are facts about the price, not a view on it.
The model
History
| BDT mn | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|---|---|
| Revenue (consolidated) | 3,429 | 5,449 | 7,336 | 24,423 | 22,484 | 13,694 | 13,008 |
| Gross profit | 777 | 2,527 | 2,868 | 3,436 | 4,192 | 3,286 | 3,638 |
| Operating profit | 649 | 2,259 | 2,601 | 3,146 | 3,874 | 2,970 | 3,332 |
| Profit attributable to owners of the Company | 288 | 433 | 642 | 215 | -184 | 69 | 238 |
| Profit attributable to non-controlling interest | 13 | 241 | 414 | 207 | -70 | 127 | 273 |
| Total assets | 20,004 | 20,679 | 23,643 | 33,557 | 30,695 | 26,907 | 25,436 |
| Non-current liabilities | 1,974 | 3,207 | 8,174 | 10,642 | 9,833 | 8,620 | 4,723 |
| Current liabilities | 15,792 | 14,854 | 11,855 | 15,788 | 14,385 | 11,849 | 13,867 |
| Non-controlling interest (equity) | 290 | 336 | 789 | 2,129 | 1,840 | 1,841 | 2,051 |
| EPS as reported (BDT) | 2.90 | 4.37 | 6.47 | 1.25 | -1.06 | 0.40 | 1.37 |
| NAV per share as reported (BDT) | 19.63 | 23.00 | 28.48 | 28.92 | 26.81 | 26.57 | 27.72 |
| Net operating cash flow per share as reported (BDT) | 0.43 | 14.40 | 3.79 | 4.13 | 22.54 | 3.85 | -9.05 |
| Cash dividend per share (BDT) | 1.00 | 1.00 | 1.25 | 1.00 | 0.50 | 0.20 | 0.20 |
| Ratios | |||||||
| Profit after tax (owners + NCI) | 301 | 674 | 1,056 | 422 | -253 | 196 | 511 |
| Total equity (assets - liabilities) | 2,238 | 2,618 | 3,614 | 7,128 | 6,478 | 6,438 | 6,846 |
| Equity attributable to owners | 1,948 | 2,282 | 2,826 | 4,999 | 4,638 | 4,597 | 4,796 |
| Revenue growth | — | 58.9% | 34.6% | 232.9% | -7.9% | -39.1% | -5.0% |
| Gross margin | 22.7% | 46.4% | 39.1% | 14.1% | 18.6% | 24.0% | 28.0% |
| Operating margin | 18.9% | 41.5% | 35.5% | 12.9% | 17.2% | 21.7% | 25.6% |
| Owners' profit margin | 8.4% | 7.9% | 8.7% | 0.9% | -0.8% | 0.5% | 1.8% |
| NCI share of profit after tax | 4.4% | 35.7% | 39.2% | 49.0% | 27.5% | 64.8% | 53.5% |
| ROE on owners' equity (average) | — | 20.5% | 25.1% | 5.5% | -3.8% | 1.5% | 5.1% |
| Liabilities / total equity (x) | 7.9x | 6.9x | 5.5x | 3.7x | 3.7x | 3.2x | 2.7x |
| Payout (DPS / EPS) | 34.5% | 22.9% | 19.3% | 80.0% | — | 50.0% | 14.6% |
Plants
| BDT mn | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| BPPL Patenga 50 MW: energy sold (MWh) | — | 232,871 | 186,283 | 81,471 | 69,890 |
| KPL Patiya 110 MW: electricity sold (MWh) | 87,267 | 693,947 | 582,870 | 276,386 | 189,376 |
| BSPL Patiya 105 MW: electricity sold (MWh) | 160,861 | 611,136 | 454,347 | 199,870 | 192,397 |
| BPPL average plant factor | — | 55.1% | 43.2% | 19.2% | 16.7% |
| KPL average plant factor | 10.2% | 73.3% | 61.5% | 29.1% | 20.2% |
| BSPL average plant factor | 17.8% | 67.2% | 50.0% | 22.1% | 21.5% |
| Consolidated revenue | 7,336 | 24,423 | 22,484 | 13,694 | 13,008 |
| Group electricity sold (MWh) | — | 1,537,954 | 1,223,500 | 557,727 | 451,663 |
| Revenue per kWh sold (BDT) | — | 15.88 | 18.38 | 24.55 | 28.80 |
| Group MWh sold, growth | — | — | -20.4% | -54.4% | -19.0% |
BPPL standalone
| BDT mn | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
| Capacity proceeds | 526 | 646 | 658 | 731 |
| Variable O&M proceeds | 153 | 134 | 66 | 62 |
| Fuel proceeds | 2,964 | 2,868 | 1,318 | 1,256 |
| Fuel consumption (cost of revenue) | — | — | 1,396 | 1,343 |
| Depreciation on plant & machinery (cost of revenue) | — | — | 116 | 116 |
| Spare parts consumption | — | — | 38 | 53 |
| Financial expenses (standalone) | — | — | 249 | 330 |
| Dividend income from subsidiaries & others | — | — | 116 | 62 |
| Net profit after tax (standalone) | — | — | 54 | 16 |
| Revenue (standalone) | 3,643 | 3,649 | 2,042 | 2,049 |
| Capacity proceeds, % of revenue | 14.4% | 17.7% | 32.2% | 35.7% |
| Capacity share of revenue excluding fuel | 77.5% | 82.8% | 90.9% | 92.2% |
| Fuel proceeds less fuel consumption | — | — | -78 | -86 |
Subsidiaries
| BDT mn | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| KPL revenue | 2,247 | 10,882 | 10,333 | 6,396 | 5,485 |
| KPL exchange gain/(loss) | -105 | -623 | -1,136 | -408 | -244 |
| KPL financial expenses | 515 | 534 | 610 | 601 | 840 |
| KPL profit after tax | 445 | 379 | 155 | 165 | 416 |
| BSPL revenue | 2,872 | 9,897 | 8,492 | 5,229 | 5,474 |
| BSPL exchange gain/(loss) | -66 | -749 | -1,363 | -537 | -268 |
| BSPL financial expenses | 586 | 533 | 648 | 898 | 1,142 |
| BSPL profit/(loss) after tax | 399 | 52 | -289 | 91 | 155 |
| 51% of KPL profit (BPPL share) | 227 | 193 | 79 | 84 | 212 |
| 51% of BSPL profit (BPPL share) | 203 | 26 | -148 | 47 | 79 |
| KPL + BSPL exchange loss | -171 | -1,371 | -2,499 | -944 | -512 |
| KPL + BSPL financial expenses | 1,101 | 1,067 | 1,259 | 1,500 | 1,983 |
Balance sheet
| BDT mn | Jun-2022 | Jun-2023 | Jun-2024 | Jun-2025 | Mar-2026 |
|---|---|---|---|---|---|
| Accounts receivables (BPDB) | 13,088 | 9,454 | 5,535 | 6,063 | 8,687 |
| Inventories | 2,462 | 2,071 | 3,464 | 2,720 | 2,034 |
| Cash & cash equivalents | 776 | 2,290 | 976 | 549 | 157 |
| Preference shares (redeemable), total | 1,328 | 1,108 | 776 | 716 | 574 |
| Term loans, total | 10,807 | 10,555 | 9,696 | 9,467 | 8,441 |
| Other financial facility (short-term) | 13,758 | 12,225 | 9,809 | 7,480 | 8,708 |
| Finance lease liability, total | 85 | 51 | 18 | 12 | 8 |
| Current account with related parties (payable) | 180 | 7 | 5 | 678 | 705 |
| Total equity | 7,128 | 6,478 | 6,438 | 6,846 | 7,757 |
| Revenue (annual; 9M x 365/274 for Mar-2026) | 24,423 | 22,484 | 13,694 | 13,008 | 11,840 |
| Borrowings (pref + term + short-term + lease) | 25,979 | 23,940 | 20,300 | 17,674 | 17,732 |
| Net debt (borrowings - cash) | 25,202 | 21,650 | 19,324 | 17,125 | 17,574 |
| Borrowings / total equity (x) | 3.6x | 3.7x | 3.2x | 2.6x | 2.3x |
| Receivable days (on annual or annualised revenue) | 196 | 153 | 148 | 170 | 268 |
| Short-term facility, % of borrowings | 53.0% | 51.1% | 48.3% | 42.3% | 49.1% |
Coverage
| BDT mn | FY2024 | FY2025 | 9M FY2026 |
|---|---|---|---|
| Operating profit | 2,970 | 3,332 | 2,676 |
| Depreciation on PPE | 620 | 618 | — |
| Financial expenses | 1,705 | 2,247 | 1,689 |
| Other income/(loss) (mostly exchange loss) | -1,013 | -515 | -29 |
| Net debt at period end | 19,324 | 17,125 | 17,574 |
| Operating profit / financial expenses (x) | 1.7x | 1.5x | 1.6x |
| EBITDA (operating profit + depreciation) | 3,590 | 3,950 | — |
| Net debt / EBITDA (x) | 5.4x | 4.3x | — |
Quarters
| BDT mn | Q1 FY25 | H1 FY25 | 9M FY25 | FY2025 | Q1 FY26 | H1 FY26 | 9M FY26 |
|---|---|---|---|---|---|---|---|
| Revenue (cumulative) | 4,154 | 6,877 | 10,181 | 13,008 | 3,551 | 6,316 | 8,888 |
| Gross profit (cumulative) | 835 | 1,732 | 2,864 | 3,638 | 858 | 1,795 | 2,908 |
| Other income/(loss) (cumulative) | -189 | -185 | -520 | -515 | 8 | -38 | -29 |
| Financial expenses (cumulative) | 566 | 1,360 | 1,778 | 2,247 | 574 | 1,122 | 1,689 |
| Profit attributable to owners (cumulative) | -23 | -22 | 128 | 238 | 114 | 247 | 494 |
| Revenue, discrete quarter (Q1..Q4) | 4,154 | 2,723 | 3,304 | 2,827 | 3,551 | 2,765 | 2,572 |
| Profit attributable to owners, discrete quarter (Q1..Q4) | -23 | 1 | 150 | 109 | 114 | 133 | 247 |
| Gross profit, discrete quarter (Q1..Q4) | 835 | 897 | 1,132 | 774 | 858 | 937 | 1,113 |
| Financial expenses, discrete quarter as reported | 566 | 794 | 418 | 469 | 574 | 548 | 549 |
| EPS, discrete quarter (BDT) | -0.13 | 0.01 | 0.87 | 0.63 | 0.66 | 0.77 | 1.43 |
| Gross margin, discrete quarter | 20.1% | 32.9% | 34.3% | 27.4% | 24.1% | 33.9% | 43.3% |
| Reported discrete EPS (BDT), for the check | -0.13 | 0.01 | 0.87 | — | 0.66 | 0.77 | 1.43 |
| FY2026 EPS announced on DSE 29-Oct-2026 (BDT) | — | — | — | — | — | — | 3.48 |
| Q4 FY2026 EPS derived (announced FY less 9M) (BDT) | — | — | — | — | — | — | 0.62 |
Cash flow
| BDT mn | FY2024 | FY2025 | 9M FY2025 | 9M FY2026 |
|---|---|---|---|---|
| Cash receipts from customer | 17,629 | 12,486 | 8,162 | 6,261 |
| Cash paid to suppliers | -14,513 | -11,309 | -7,145 | -6,063 |
| Financial expenses paid | -1,689 | -1,937 | -1,413 | -1,420 |
| Net cash from operating activities | 665 | -1,566 | -948 | -1,491 |
| Acquisition of PPE | -38 | -15 | -12 | -9 |
| Short-term loan, net | 510 | 772 | -732 | 2,140 |
| Current account with related parties, net | -317 | 873 | 844 | 184 |
| Dividends paid (owners + minority) | -196 | -99 | -82 | -34 |
| Profit after tax (consolidated) | 196 | 511 | 307 | 957 |
| Revenue | 13,694 | 13,008 | 10,181 | 8,888 |
| Cash collected / revenue | 128.7% | 96.0% | 80.2% | 70.4% |
| CFO / profit after tax (x) | 3.4x | -3.1x | -3.1x | -1.6x |
| CFO less capex | 627 | -1,581 | -960 | -1,500 |
Peers 9M FY26
| BDT mn | BPPL | SUMITPOWER | UPGDCL | DOREENPWR |
|---|---|---|---|---|
| Revenue (9M FY26) | 8,888 | 23,601 | 24,015 | 9,206 |
| Gross profit (9M FY26) | 2,908 | 5,749 | 9,947 | 2,290 |
| Profit after tax, total (9M FY26) | 957 | 3,868 | 8,661 | 758 |
| Profit to owners (printed label differs, see note) | 494 | 1,574 | 8,513 | 754 |
| EPS as printed (BDT) | 2.86 | 1.47 | 14.69 | 4.16 |
| Receivables at 31-Mar-2026, printed label | 8,687 | 27,305 | 21,219 | 7,190 |
| NAV per share at 31-Mar-2026 as printed (BDT) | 30.34 | 40.71 | 82.08 | 56.26 |
| Gross margin | 32.7% | 24.4% | 41.4% | 24.9% |
| Share of profit after tax going to NCI | 48.3% | 59.3% | 1.7% | 0.5% |
| Receivables / 9M revenue x 274 days | 268 | 317 | 242 | 214 |
| Owners' profit / revenue | 5.6% | 6.7% | 35.5% | 8.2% |
Fuel revenue vs cost
| BDT mn (BPPL standalone) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | Source |
|---|---|---|---|---|---|---|
| Capacity proceeds | 486 | 526 | 646 | 658 | 731 | AR21 p.106 (FY2021); AR23 p.114 (FY2022-23); AR25 p.130-131 (FY2024-25) |
| VOM proceeds | 106 | 153 | 134 | 66 | 62 | AR21 p.106 (FY2021); AR23 p.114 (FY2022-23); AR25 p.130-131 (FY2024-25) |
| Fuel proceeds | 1,625 | 2,964 | 2,868 | 1,318 | 1,256 | AR21 p.106 (FY2021); AR23 p.114 (FY2022-23); AR25 p.130-131 (FY2024-25) |
| Fuel consumption (cost of revenue) | 1,411 | 2,828 | 2,796 | 1,396 | 1,343 | AR21 p.106 (FY2021); AR23 p.114 (FY2022-23); AR25 p.130-131 (FY2024-25) |
| Fuel proceeds less fuel consumed (derived) | 214 | 136 | 73 | -78 | -86 | Formula |
| Electricity sold, MWh | — | 232,871 | 186,283 | 81,471 | 69,890 | AR22 p.39, AR23 p.43, AR24 p.40, AR25 p.42 |
| Fuel consumed per kWh sold, BDT (derived) | — | 12 | 15 | 17 | 19 | Formula |
| Fuel proceeds per kWh sold, BDT (derived) | — | 13 | 15 | 16 | 18 | Formula |
| The filings do not state the fuel-billing basis (heat rate or reference price); management says fuel costs are 'definable at the time of billing to BPDB' (AR25 p.44). | ||||||
| HFO is bought from 'SHELL, VITOL and others' with offices in Singapore and from local BPC-approved vendors (AR25 p.44). BPPL HFO imports: BDT 905.5m FY2025, 1,834.6m FY2024 (AR25 p.140). | ||||||
| KPL and BSPL revenue is not split into capacity / VOM / fuel in AR25 (consolidated note 35.A p.130 by company only; subsidiary statements p.150-165). | ||||||
Fuel prices and FX
| Series | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 | Source |
|---|---|---|---|---|---|---|---|
| Brent crude, FY average (USD/bbl) | 54 | 91 | 87 | 85 | 75 | 79 | World Bank Pink Sheet monthly, averaged Jul-Jun: https://thedocs.worldbank.org/en/doc/74e8be41ceb20fa0da750cda2f6b9e4e-0050012026/related/CMO-Historical-Data-Monthly.xlsx |
| BDT per USD, FY average | 85 | 86 | 99 | 111 | 120 | 122 | Bangladesh Bank NSDP monthly average: https://www.bb.org.bd/econdata/nsdp/xml/bgd/exr_bgd.xml |
| BDT per USD, end-June | 85 | 93 | 106 | 118 | 123 | 123 | Bangladesh Bank NSDP end of period: https://www.bb.org.bd/econdata/nsdp/xml/bgd/exr_bgd.xml |
| Latest monthly points: Brent USD 116.8/bbl (Sep-2026); BDT/USD 122.95 average (Sep-2026), 123.025 end-Sep-2026. | |||||||
| Furnace oil, Tk per litre: 96.86 from 6-Sep-2026 (BERC notice, Platts-linked monthly adjustment under BERC order 2026/05; BPC-supplied HFO to power plants), https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-berc/2026/9/beb5b20a-d87f-4a63-999e-45eb8df94c20.pdf ; 108.78 from 1-Oct-2026 (BPC retail list, different basis), https://bpc.gov.bd/pages/static-pages/6922ddb6933eb65569e15fbc . Earlier furnace-oil history: not in our data at 5-Nov-2026. | |||||||
| Gas tariffs do not apply: all three plants are HFO-fired (AR25 p.42). | |||||||
Policy rate (BB)
| Date | Policy (repo) rate, % | Source |
|---|---|---|
| 2020-07-29 | 5 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2022-05-01 | 5 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2022-06-30 | 6 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2022-09-01 | 6 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2023-01-15 | 6 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2023-07-01 | 6 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2023-10-01 | 7 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2023-11-26 | 8 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2024-01-17 | 8 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2024-05-08 | 8 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2024-07-18 | 8 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2024-08-25 | 9 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2024-09-01 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2024-10-01 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2024-12-03 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2025-01-21 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2025-05-12 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2025-07-20 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2025-11-03 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2026-01-28 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2026-06-29 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2026-07-30 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2026-09-23 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
| 2026-09-30 | 10 | Bangladesh Bank MPC / MPS: https://www.bb.org.bd/monetaryactivity/mps/mps_q2fy27.pdf |
Lending rate (BB SBS)
| End-June | Weighted average lending rate, all scheduled banks, % | Source |
|---|---|---|
| 2020-06-30 | 8 | BB Scheduled Banks Statistics Table-102: https://www.bb.org.bd/en/index.php/publication/publictn/3/10 |
| 2021-06-30 | 7 | BB Scheduled Banks Statistics Table-102: https://www.bb.org.bd/en/index.php/publication/publictn/3/10 |
| 2022-06-30 | 7 | BB Scheduled Banks Statistics Table-102: https://www.bb.org.bd/en/index.php/publication/publictn/3/10 |
| 2023-06-30 | 7 | BB Scheduled Banks Statistics Table-102: https://www.bb.org.bd/en/index.php/publication/publictn/3/10 |
| 2024-06-30 | 12 | BB Scheduled Banks Statistics Table-102: https://www.bb.org.bd/en/index.php/publication/publictn/3/10 |
| 2025-06-30 | 12 | BB Scheduled Banks Statistics Table-102: https://www.bb.org.bd/en/index.php/publication/publictn/3/10 |
| 2026-06-30 | 12 | BB Scheduled Banks Statistics Table-102: https://www.bb.org.bd/en/index.php/publication/publictn/3/10 |
| BPPL's own taka loans at June 2025: 13.50-16.00%; IPFF USD loan 6m SOFR + 0.30% + 2.0% (AR25 p.125). | ||
FX loss split
| BDT mn | FY2024 | FY2025 | Source |
|---|---|---|---|
| BPPL: FX loss on foreign procurement | -20 | -4 | AR25 p.133 note 38 |
| BPPL: FX loss on term loan | -54 | -19 | AR25 p.133 note 38 |
| BSPL: FX loss on foreign procurement | -287 | -110 | AR25 p.133 note 38.A.01 |
| BSPL: FX loss on term loan | -250 | -158 | AR25 p.133 note 38.A.01 |
| KPL: FX loss on foreign procurement | -352 | -203 | AR25 p.133 note 38.A.02 |
| KPL: FX loss on term loan | -92 | -41 | AR25 p.133 note 38.A.02 |
| Total (derived) | -1,055 | -535 | Formula |
| Outstanding USD principal of KPL / BSPL term loans is not printed in AR25 (subsidiary statements only, p.150-165); AR25 p.11 milestones print facility sizes USD 40m (KPL, IDCOL) and USD 31.69m (BSPL, UCBL). | |||
BPDB dues and claims
| Item | Value (BDT mn) | Date / period | Source |
|---|---|---|---|
| BPPL delay-interest invoice to Dec-2022 (not booked) | 278 | May-2014 to Dec-2022 | AR23 p.124 |
| BPPL delay-interest invoice to Dec-2023 (not booked) | 388 | May-2014 to Dec-2023 | AR24 p.131 |
| KPL: BPDB bonds accepted for dues | 6,444 | Feb-2024 to Oct-2024 | AR24 p.133 |
| BSPL: BPDB bonds accepted for dues | 4,616 | Feb-2024 to Oct-2024 | AR24 p.142 |
| BPPL receivable from BPDB, Jun-2025 | 1,061 | 30-Jun-2025 | AR25 p.118 |
| BPPL receivable from BPDB, Mar-2026 | 2,096 | 31-Mar-2026 | 9M FY26 p.28 |
| of which 181-365 days | 1,012 | 31-Mar-2026 | 9M FY26 p.28 |
| KPL accounts receivable | 2,682 | 30-Jun-2025 | AR25 p.152 |
| AR2025 repeats no late-payment invoice (searched 'invoice', 'realization', 'delay' in AR25). The bond coupons, tenor and whether the bonds were held, sold or pledged are not printed (searched 'bond' AR24, AR25, 9M FY26). | |||
| Subsidiary receivable ageing is not printed (AR25 p.145-165). | |||
Contingent liabilities
| Item (BPPL, 30-Jun-2025) | BDT mn | Expiry | Source |
|---|---|---|---|
| BG operational security to BPDB (UCBL 80/2014) | 70 | 25-07-2026 | AR25 p.139 note 47 |
| BG to IDCOL, debt-service reserve, KPL USD term loan | 505 | 29-11-2025 | AR25 p.139 |
| BG to IDCOL, stamp-duty waiver, KPL | 50 | 29-11-2025 | AR25 p.139 |
| Corporate guarantee to City Bank for KPL facilities | 11,370 | 02-10-2026 | AR25 p.139 |
| Corporate guarantee to UCB for BSPL BG to BPDB | 250 | 24-07-2026 | AR25 p.139 |
| Corporate guarantee to UCB for BSPL working capital | 1,850 | 30-06-2026 | AR25 p.139 |
| Other bank guarantees (BPDB 3.14, customs 1.66) | 5 | 2018 (expired dates printed) | AR25 p.139 |
| Total (printed 14,099.97) | 14,100 | — | Formula |
| Note 48: 'There is no commitment has made by the company against Capital Expenditure' (AR25 p.139). | |||
Dividends from subs
| BDT mn | FY2022 | FY2023 | FY2024 | FY2025 | Source |
|---|---|---|---|---|---|
| KPL profit after tax | 379 | 155 | 165 | 416 | AR25 p.147 |
| BSPL profit after tax | 52 | -289 | 91 | 155 | AR25 p.157 |
| BPPL 51% share (derived) | 220 | -68 | 131 | 291 | Formula |
| Dividend received by BPPL (standalone cash flow) | 271 | 233 | 116 | 62 | AR23 p.92 (FY22-23); AR25 p.101 (FY24-25) |
| 9M FY2026: no dividend received by BPPL (9M FY26 p.12). Dividend paid to minority interest FY2025: BDT 59.6m (AR25 p.94). | |||||
| No equity-accounted associates: Baraka Power Ltd, which holds 29.25% of BPPL, is labelled 'Associate Company' (AR25 p.53). | |||||
KAMs FY2025
| Key audit matter | Description as printed (in full) | Source |
|---|---|---|
| Valuation of PPE | The carrying value of property, plant & equipment amounts to Tk. 2,884,959,306 which is 44.83% of total assets. This represents a significant amount in the Company's statement of financial position as at June 30, 2025. There is a risk of: - determining which costs meet the criteria for capitalization; - determining the date on which the assets is recognized to property, plant & equipment and depreciation commences; - the estimation of economic useful lives and residual values assigned to property, plant & equipment. We identified the carrying value of property, plant & equipment as a key audit matter because of the high level of management judgement involved and because of its significance to the financial statements. | AR25 p.86 |
| Inventories | Inventories represent about 09.62% of the total assets of the Company; inventories are thus a material item to the financial statements. ... inventories are valued at the lower of the cost or net realizable values. As such, management is required to make judgments in determining whether inventories are being appropriately valued and also need to make provision for aged inventories, if required. Due to the value and volume of inventories being held by the Company at the reporting date and presentation thereof, inventories has been considered as a key audit matter. | AR25 p.87 |
| Accounts receivable | The total amount of Account Receivable is Tk. 1,060,906,443 as at June 30, 2025 which is 16.48% of total assets of the Company. There are significant large numbers of individual customers. Customers in different business segments and jurisdictions are subject to their independent business risk. The increasing challenges over the economy and operating environment in developing the software and sale of service during the year have increased the risks of default on receivables from the customers. ... | AR25 p.87 |
| Term loan & other financial facility | As at June 30, 2025, the reported amount of Term loan is Tk. 1,138,245,930 & Short-Term Working Capital Facility is Tk. 266,330,461 which represents 21.82% of total equity & liabilities for the Company. The Company dependent on loan liabilities to operate the business. Therefore, bank and financial institution loan has been considered as key audit area. | AR25 p.88 |
| Revenue recognition | Revenue of Tk. 2,049,058,793 is recognized in the Statement of Profit or Loss and Other Comprehensive Income of Baraka Patenga Power Limited for the year ended June 30, 2025. We identified revenue recognition as a key audit matter because revenue is one of the key performance indicators of the Company and therefore there is an inherent risk of manipulation of the timing of recognition of revenue by management to meet specific targets or expectations. | AR25 p.88 |
Ratings and category
| DSE post | Event | Source |
|---|---|---|
| 31-Jan-2022 | CRISL surveillance AA2 / ST-2, stable | DSE post |
| 24-Jan-2022 | Category N to A from 25-Jan-2022 (12.50% cash for FY2021 disbursed) | DSE post |
| 26-Dec-2022 | CRAB AA2 / ST-2, stable (audited to Jun-2022) | DSE post |
| 21-Dec-2023 | CRAB AA2 / ST-2, stable (rating date 20-Dec-2023) | DSE post; BPPL_PSI_2023_2 |
| 24-Dec-2023 | Category A to B from 26-Dec-2023 ('approved 5% Cash Dividend for the year ended June 30, 2023') | DSE post |
| 28-Nov-2024 | CRAB AA2 / ST-2, stable (audited to Jun-2024) | DSE post |
| 01-Jan-2026 | CRAB AA2 / ST-2, stable (audited to Jun-2025) | DSE post |
| Year pages: https://analystbro.net/symbols/DSE:BPPL/announcements?year=2022 (and 2023, 2024, 2026). Rating rationale reports: not in our data at 5-Nov-2026. | ||
DSE events 2021-2026
| DSE post date | Event (DSE wording quoted) |
|---|---|
| 15-Nov-2021 | FY2021 auditor other matter: remaining PPA terms '7 years 11 months, 13 years 2 months and 12 year 11 months' (BPPL, KPL, BSPL) |
| 24-Jan-2022 | FY2021 12.50% cash dividend disbursed; category N to A |
| 31-Jan-2022 | CRISL AA2 / ST-2, stable |
| 10-Mar-2022 | Baraka Securities gets BSEC stock-broker and stock-dealer registration (02-Mar-2022) |
| 27-Oct-2022 | FY2022: 10% cash, EPS 1.25; EPS down on 'significant increase of exchange loss' |
| 10-Nov-2022 | FY2022 emphasis of matter: no WPPF provision in FY2022 'though the comparative Financial Statements has maintained WPPF provision' |
| 14-Nov-2022 | Q1 FY2023 EPS -2.27 on exchange loss in subsidiaries and own |
| 26-Dec-2022 | CRAB AA2 / ST-2, stable |
| 23-Jan-2023 | FY2022 dividend disbursed |
| 29-Oct-2023 | FY2023: 5% cash, EPS -1.06; exchange loss on 'Foreign Procurement of HFO, Spare Parts and others' |
| 15-Nov-2023 | FY2023 emphasis of matter and other matter notice |
| 21-Dec-2023 | CRAB AA2 / ST-2, stable |
| 24-Dec-2023 | Category A to B from 26-Dec-2023 |
| 20-May-2024 | FY2023 dividend disbursed |
| 19-Aug-2024 | Faisal Ahmed Chowdhury chairman, Gulam Rabbani Chowdhury MD from 18-Aug-2024 |
| 10-Nov-2024 | FY2024: 2% cash, EPS 0.35 (AR restated 0.40); NOCFPS 3.85 |
| 27-Nov-2024 | FY2024 emphasis of matter and other matter notice |
| 28-Nov-2024 | CRAB AA2 / ST-2, stable |
| 03-Feb-2025 | FY2024 dividend disbursed |
| 04-May-2025 | 9M FY2025 EPS 0.74; EPS down on 'significant increase of financial expenses' |
| 07-Jul-2025 | Gulam Rabbani Chowdhury chairman, Faisal Ahmed Chowdhury MD from 04-Jul-2025 |
| 29-Oct-2025 | FY2025: 2% cash, EPS 1.37, NOCFPS -9.05 ('lesser amount received from the customer') |
| 16-Nov-2025 | Q1 FY2026 EPS 0.66 on lower exchange loss |
| 24-Dec-2025 | FY2025 emphasis of matters and other matters notice |
| 01-Jan-2026 | CRAB AA2 / ST-2, stable |
| 01-Feb-2026 | H1 FY2026 EPS 1.43; FY2025 dividend disbursed |
| 30-Apr-2026 | 9M FY2026 EPS 2.86; NOCFPS -8.62 on 'lower amounts received from customers' |
| 29-Oct-2026 | FY2026: 5% cash, EPS 3.48, NAV 31.03, NOCFPS 8.29; record date 22-Nov-2026, AGM 23-Dec-2026 |
| Sources: news.py stored DSE archive (89 posts, 4-Nov-2021 to 5-Nov-2026) cross-checked against https://analystbro.net/symbols/DSE:BPPL/announcements?year=2021 ... ?year=2026 (103 posts since 2021). Site-only posts added: CRISL 31-Jan-2022, CRAB 26-Dec-2022 and 21-Dec-2023, category change 24-Dec-2023, first halves of the FY2022/FY2023 dividend posts and the 10-Nov-2022 / 15-Nov-2023 auditor notices. | |
| Excluded: LR 16(1)/19(1) board schedules, spot / suspension / resumption / price-limit-open posts, margin-loan and e-TIN update requests (dates only). | |
Term loans by company
| BDT mn | Jun-2025 | Mar-2026 | Source |
|---|---|---|---|
| BSPL term loan, non-current | 1,501 | 3,612 | 9M FY26 p.33 note 25.A |
| BSPL term loan, current maturity | 3,687 | 1,122 | 9M FY26 p.33 note 25.B |
| KPL term loan, current maturity | 507 | 782 | 9M FY26 p.33 note 25.B |
| Reschedule / refinance, lender, tenor and rate not printed (searched 9M FY26 p.2-42). | |||
FAQ
- What does Baraka Patenga Power own?
- A 50 MW HFO plant at Patenga, 51% each of Karnaphuli Power (110 MW) and Baraka Shikalbaha Power (105 MW), and 52.67% of Baraka Securities [1 p.4] [1 p.6] [1 p.7].
- What were BPPL's FY2026 results?
- Consolidated EPS BDT 3.48, NAV per share BDT 31.03 and a 5% cash dividend, announced on 29-Oct-2026 [9].
- Who buys BPPL's electricity?
- Only the Bangladesh Power Development Board, under 15-year PPAs [1 p.43].
- Why is so little profit left for BPPL shareholders?
- Finance cost and exchange losses take most of operating profit, and 49% of the two subsidiaries belongs to other shareholders [1 p.92] [1 p.4].
- When does the Patenga PPA end?
- Fifteen years from commercial operation on 4-May-2014, so May 2029; the tax exemption has the same term [1 p.104] [1 p.111].
- Which results does this note use?
- Annual reports FY2019-FY2025, un-audited statements to March 2026 and the DSE announcement of FY2026 results; the FY2026 annual report is not in our corpus at 5-Nov-2026.
Sources
- Baraka Patenga Power Limited Annual Report 2024-25 (year to 30-Jun-2025), incl. subsidiary statements · link · accessed 2026-10-31
- BPPL un-audited statements, nine months to 31-Mar-2026 (Q3 FY2026) · link · accessed 2026-10-31
- BPPL un-audited statements, half year to 31-Dec-2025 (H1 FY2026) · link · accessed 2026-10-31
- BPPL un-audited statements, quarter to 30-Sep-2025 (Q1 FY2026) · link · accessed 2026-10-31
- BPPL price-sensitive information on H1 FY2026 results (29-Jan-2026) · link · accessed 2026-10-31
- Baraka Patenga Power Limited Annual Report 2023-24 · link · accessed 2026-10-31
- Baraka Patenga Power Limited Annual Report 2022-23 (five-year data FY2019-23) · link · accessed 2026-10-31
- Baraka Patenga Power Limited Annual Report 2021-22 · link · accessed 2026-10-31
- Dhaka Stock Exchange news archive for BPPL, Nov-2024 to Oct-2026 (incl. FY2026 results and dividend, 29-Oct-2026) · link · accessed 2026-10-31
- Dhaka Stock Exchange company page, BPPL (shareholding to 30-Sep-2026, category) · link · accessed 2026-10-31
- Dhaka Stock Exchange company page, BARKAPOWER (Baraka Power Limited) · link · accessed 2026-10-31
- Summit Power Limited un-audited statements, nine months to 31-Mar-2026 · link · accessed 2026-10-31
- United Power Generation & Distribution Co. un-audited statements, nine months to 31-Mar-2026 · link · accessed 2026-10-31
- Doreen Power Generations and Systems un-audited statements, nine months to 31-Mar-2026 · link · accessed 2026-10-31
- The Daily Star, 'Bangladesh gets 3 more years for LDC graduation' (30-Oct-2026) · link · accessed 2026-10-31
- The Business Standard, 'Bangladesh gets 3 more years for LDC graduation' (30-Oct-2026) · link · accessed 2026-10-31
- AnalystBro price data (TradingView feed): DSE:BPPL daily bars to 29-Oct-2026 · link · accessed 2026-10-31
- AnalystBro model for this report (workbook tabs below) · link · accessed 2026-10-31
- Baraka Patenga Power Limited Annual Report 2020-21 (year to 30-Jun-2021) · link · accessed 2026-11-05
- World Bank Pink Sheet, CMO Historical Data Monthly: crude oil, Brent (USD/bbl), to Sep-2026 · link · accessed 2026-11-05
- Bangladesh Bank NSDP, BDT per USD monthly average and end of period, to Sep-2026 · link · accessed 2026-11-05
- Bangladesh Bank policy (repo) rate decisions, MPS / MPC resolutions Jul-2020 to Sep-2026 · link · accessed 2026-11-05
- Bangladesh Bank, Scheduled Banks Statistics Apr-Jun 2026, Table-102 (weighted average lending rate, end-June) · link · accessed 2026-11-05
- BERC furnace-oil price notice 06-Sep-2026 (Platts-linked monthly adjustment under order 2026/05) · link · accessed 2026-11-05
- DSE announcements for BPPL, 2021 (AnalystBro year page, read 5-Nov-2026) · link · accessed 2026-11-05
- DSE announcements for BPPL, 2022 (AnalystBro year page, read 5-Nov-2026) · link · accessed 2026-11-05
- DSE announcements for BPPL, 2023 (AnalystBro year page, read 5-Nov-2026) · link · accessed 2026-11-05
- DSE announcements for BPPL, 2024 (AnalystBro year page, read 5-Nov-2026) · link · accessed 2026-11-05
- DSE announcements for BPPL, 2025 (AnalystBro year page, read 5-Nov-2026) · link · accessed 2026-11-05
- DSE announcements for BPPL, 2026 (AnalystBro year page, read 5-Nov-2026) · link · accessed 2026-11-05
Revision history
- 05-Nov-2026: Summarised raw event/data tables; added chart findings (this version)
- 05-Nov-2026
- 29-Oct-2026
Disclaimer
This article is published by AnalystBro for information and education only. It is not investment, financial, legal or tax advice, not an offer or solicitation to buy or sell any security, and not a recommendation. It is based on company filings, official statistics and the sources cited, and was independently reviewed before publishing; it may still contain errors or omissions, and the data and estimates can be out of date. Fair values, forecasts and the model are estimates under stated assumptions, not predictions; past results don't indicate future returns.
AnalystBro, its owners and staff accept no responsibility or liability for any loss or damage arising from the use of, or reliance on, this article, its model or its data. Do your own research and consult a licensed adviser before making investment decisions. Any changes you make in the spreadsheet view stay in your browser and are your own.